X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0606021602003

Well Details

Well ID: 0606021602003
Loading map...
Location: 00/02-16-060-02W6/3
Location Alias: 00/02-16-60-02 W6M
Location Alias 2: 00/02-16-060-02 W6/03
Country: Canada
Province: Alberta
Township: 060
Meridian: 6
Range: 02
Section: 16
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA ECOG RESTHA 2-16-60-2
Operator Name: Jupiter Resources Inc.
License Number: 0381820
License Date: 2007-09-13
License Status: Issued
Spud Date: 2007-09-20
Final Drill Date: 2007-10-12
Well Total Depth: 3614.00 m
Surface Hole Latitude: 54.177455
Surface Hole Longitude: -118.227400

For data sources see[1][2]

Well History

Date Event
2007-09-13 Obtained License
2007-09-21 Direction Drilling Operation Performed - Deviate
2007-09-23 Surface Casing Operation Performed
2007-10-04 Well Log Performed
2007-10-05 Intermediate Casing Operation Performed
2007-10-12 Finished Drilling
2007-10-12 Well Mode changed to Drilled and Cased
2007-10-13 Well Log Performed
2007-10-14 Production Casing Operation Performed
2007-10-14 Rig Released
2007-10-19 Perforation Treatment Performed - Jet Perforation
2007-10-19 Well Log Performed
2007-10-20 Perforation Treatment Performed - Fractured
2007-10-21 Perforation Treatment Performed - Jet Perforation
2007-10-21 Well Log Performed
2007-10-22 Perforation Treatment Performed - Fractured
2007-10-22 Perforation Treatment Performed - Jet Perforation
2007-10-22 Well Log Performed
2007-10-23 Perforation Treatment Performed - Fractured
2007-10-23 Perforation Treatment Performed - Jet Perforation
2007-10-25 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2007-09-21 640.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-10-19 Perforation 3507.50 3508.50 10
2007-10-22 Perforation 2999.80 3000.30 10
2007-10-22 Perforation 2987.80 2988.30 10
2007-10-22 Perforation 2982.50 2983.50 10
2007-10-22 Perforation 2976.50 2977.00 10
2007-10-22 Perforation 2937.30 2937.80 10
2007-10-23 Fracture 2976.50 3000.30 0
2007-10-23 Fracture 2937.30 2937.80 0
2007-10-23 Perforation 2557.00 2558.00 10
2007-10-23 Fracture 2557.00 2558.00 0
2007-10-19 Perforation 3504.50 3505.50 10
2007-10-20 Fracture 3504.50 3508.50 0
2007-10-21 Perforation 3406.00 3407.00 10
2007-10-21 Perforation 3404.00 3405.00 10
2007-10-21 Perforation 3391.50 3392.50 10
2007-10-21 Perforation 3386.00 3387.00 10
2007-10-22 Fracture 3404.00 3407.00 0
2007-10-22 Fracture 3386.00 3392.50 0

For data sources see[5]



References