X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0606021111000

Well Details

Well ID: 0606021111000
Loading map...
Location: 00/11-11-060-02W6/0
Location Alias: 00/11-11-60-02 W6M
Location Alias 2: 00/11-11-060-02 W6/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 6
Range: 02
Section: 11
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA RESTHA 11-11-60-2
Operator Name: Jupiter Resources Inc.
License Number: 0072575
License Date: 1978-10-24
License Status: Suspension
Spud Date: 1978-11-23
Final Drill Date: 1979-04-26
Well Total Depth: 4920.00 m
Surface Hole Latitude: 54.175869
Surface Hole Longitude: -118.190746

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-10-24 Obtained License
1978-12-08 Lost Circulation Occurred
1978-12-10 Lost Circulation Occurred
1979-02-04 Lost Circulation Occurred
1979-04-02 Kick Occurred
1979-04-26 Finished Drilling
1979-05-01 Liner Casing Operation Performed
1979-09-03 Perforation Treatment Performed - Jet Perforation
1979-09-04 Perforation Treatment Performed - Jet Perforation
1979-09-05 Perforation Treatment Performed - Jet Perforation
1979-09-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-26 Perforation Treatment Performed - Fractured
1979-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-10-05 Perforation Treatment Performed - Jet Perforation
1979-10-06 Perforation Treatment Performed - Jet Perforation
1979-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-10-10 Perforation Treatment Performed - Fractured
1979-10-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-10-15 Perforation Treatment Performed - Jet Perforation
1979-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-10-18 Well Mode changed to Drilled and Cased
1980-01-22 Perforation Treatment Performed - Fractured
1980-02-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-02-06 Perforation Treatment Performed - Jet Perforation
1980-02-11 Perforation Treatment Performed - Fractured
1980-02-19 Perforation Treatment Performed - Jet Perforation
1980-02-23 Perforation Treatment Performed - Fractured
1980-02-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-10 Perforation Treatment Performed - Jet Perforation
2005-11-19 Perforation Treatment Performed - Jet Perforation
2006-06-22 Perforation Treatment Performed - Jet Perforation
2006-06-22 Well Log Performed
2006-06-29 Perforation Treatment Performed - Fractured
2006-09-01 Well Began Production
2006-09-01 Well Fluid changed to Gas
2006-09-01 Well Mode changed to Flowing
2010-05-01 Well Fluid changed to Gas
2010-05-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-09-03 Perforation 4567.00 4576.00 7
1979-10-03 Packing Device Capped w/Cement 4404.00 4404.00 0
1979-10-05 Perforation 3744.00 3748.00 7
1979-10-05 Perforation 3753.20 3756.60 7
1979-10-05 Perforation 3772.00 3775.00 7
1979-10-05 Perforation 3777.50 3782.60 7
1979-10-05 Perforation 3781.50 3796.00 7
1979-10-05 Perforation 3805.00 3808.50 7
1979-10-06 Perforation 3811.80 3818.00 7
1979-10-06 Perforation 3822.50 3829.00 7
1979-10-08 Acid Treatment 3744.00 3829.00 0
1979-09-04 Perforation 4557.00 4561.00 7
1979-10-10 Fracture 3744.00 3829.00 0
1979-10-14 Packing Device Capped w/Cement 3460.00 3460.00 0
1979-10-15 Perforation 3127.00 3148.00 13
1979-10-16 Acid Treatment 3127.00 3148.00 0
1980-01-22 Fracture 3127.00 3148.00 0
1980-02-01 Packing Device Capped w/Cement 3110.00 3110.00 0
1980-02-06 Perforation 2314.00 2319.00 13
1980-02-11 Fracture 2314.00 2319.00 0
1980-02-19 Perforation 2319.00 2324.00 13
1980-02-23 Fracture 2314.00 2324.00 0
1979-09-04 Perforation 4545.00 4547.00 7
1980-02-29 Packing Device Capped w/Cement 2302.00 2310.00 0
2005-11-10 Perforation 2314.00 2324.00 13
2005-11-19 Perforation 3127.00 3148.00 13
2006-06-22 Perforation 3137.00 3141.00 16
2006-06-29 Fracture 3137.00 3141.00 0
1979-09-04 Perforation 4533.00 4537.00 7
1979-09-04 Perforation 4526.00 4530.00 7
1979-09-05 Perforation 4508.00 4511.00 7
1979-09-05 Perforation 4504.00 4507.00 7
1979-09-07 Acid Treatment 4504.00 4576.00 0
1979-09-26 Fracture 4504.00 4576.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 2032 0.0 0.0 0.0
2007 6423 0.0 0.0 0.0
2008 7609 0.0 0.0 0.0
2009 5966 0.0 0.0 0.0
2010 1392 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1978-12-08 Lost Circulation 950.00 972.00
1978-12-10 Lost Circulation 1033.30 1033.30
1979-02-04 Lost Circulation 3151.00 3151.00
1979-04-02 Kick 4131.00 4131.00

For data sources see[6]

References