X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0606020912003

Well Details

Well ID: 0606020912003
Loading map...
Location: 00/12-09-060-02W6/3
Location Alias: 00/12-09-60-02 W6M
Location Alias 2: 00/12-09-060-02 W6/03
Country: Canada
Province: Alberta
Township: 060
Meridian: 6
Range: 02
Section: 09
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA ECOG RESTHA 12-9-60-2
Operator Name: Jupiter Resources Inc.
License Number: 0414647
License Date: 2009-11-26
License Status: Amended
Spud Date: 2010-03-02
Final Drill Date: 2010-03-19
Well Total Depth: 3782.50 m
Surface Hole Latitude: 54.177617
Surface Hole Longitude: -118.227686

For data sources see[1][2]

Well History

Date Event
2009-11-26 Obtained License
2010-03-02 Direction Drilling Operation Performed - Deviate
2010-03-05 Surface Casing Operation Performed
2010-03-14 Intermediate Casing Operation Performed
2010-03-19 Finished Drilling
2010-03-19 Well Mode changed to Drilled and Cased
2010-03-20 Production Casing Operation Performed
2010-03-20 Well Log Performed
2010-03-21 Rig Released
2010-07-30 Well Log Performed
2010-08-02 Perforation Treatment Performed - Jet Perforation
2010-08-02 Well Log Performed
2010-08-10 Perforation Treatment Performed - Fractured
2010-08-20 Perforation Treatment Performed - Jet Perforation
2010-09-01 Perforation Treatment Performed - Fractured
2010-09-02 Perforation Treatment Performed - Jet Perforation
2010-09-02 Well Log Performed
2010-09-03 Perforation Treatment Performed - Fractured
2010-09-03 Perforation Treatment Performed - Jet Perforation
2010-09-03 Well Log Performed
2010-09-04 Perforation Treatment Performed - Fractured
2010-09-04 Perforation Treatment Performed - Jet Perforation
2010-09-04 Well Log Performed
2010-09-05 Perforation Treatment Performed - Fractured
2010-09-13 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-03-02 145.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-08-02 Perforation 3661.00 3665.00 10
2010-09-03 Fracture 3325.00 3340.50 0
2010-09-03 Perforation 3173.00 3175.00 10
2010-09-03 Perforation 3163.00 3165.00 10
2010-09-04 Fracture 3163.00 3175.00 0
2010-09-04 Perforation 2721.00 2722.50 10
2010-09-04 Perforation 2683.00 2684.50 10
2010-09-05 Fracture 2683.00 2722.50 0
2010-08-10 Fracture 3661.00 3665.00 0
2010-08-20 Perforation 3570.00 3571.00 10
2010-08-20 Perforation 3563.00 3564.00 10
2010-08-20 Perforation 3555.00 3556.00 10
2010-09-01 Fracture 3555.00 3571.00 0
2010-09-02 Perforation 3339.50 3340.50 10
2010-09-02 Perforation 3332.00 3333.00 10
2010-09-02 Perforation 3325.00 3326.00 10

For data sources see[5]



References