If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0606020912000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.177617,"lon":-118.227686,"icon":""}]} |
Location: 00/12-09-060-02W6/0 | |
Location Alias: 00/12-09-60-02 W6M | |
Location Alias 2: 00/12-09-060-02 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 6 | |
Range: 02 | |
Section: 09 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: ECA ECOG RESTHA 12-9-60-2 | |
Operator Name: Jupiter Resources Inc. | |
License Number: 0414647 | |
License Date: 2009-11-26 | |
License Status: Amended | |
Spud Date: 2010-03-02 | |
Final Drill Date: 2010-03-19 | |
Well Total Depth: 3782.50 m | |
Surface Hole Latitude: 54.177617 | |
Surface Hole Longitude: -118.227686 |
Date | Event |
---|---|
2009-11-26 | Obtained License |
2010-03-02 | Direction Drilling Operation Performed - Deviate |
2010-03-05 | Surface Casing Operation Performed |
2010-03-14 | Intermediate Casing Operation Performed |
2010-03-19 | Finished Drilling |
2010-03-19 | Well Mode changed to Drilled and Cased |
2010-03-20 | Production Casing Operation Performed |
2010-03-20 | Well Log Performed |
2010-03-21 | Rig Released |
2010-07-30 | Well Log Performed |
2010-08-02 | Perforation Treatment Performed - Jet Perforation |
2010-08-02 | Well Log Performed |
2010-08-10 | Perforation Treatment Performed - Fractured |
2010-08-20 | Perforation Treatment Performed - Jet Perforation |
2010-09-01 | Perforation Treatment Performed - Fractured |
2010-09-02 | Perforation Treatment Performed - Jet Perforation |
2010-09-02 | Well Fluid changed to Gas |
2010-09-02 | Well Log Performed |
2010-09-02 | Well Mode changed to Testing |
2010-09-03 | Perforation Treatment Performed - Fractured |
2010-09-03 | Perforation Treatment Performed - Jet Perforation |
2010-09-03 | Well Log Performed |
2010-09-04 | Perforation Treatment Performed - Fractured |
2010-09-04 | Perforation Treatment Performed - Jet Perforation |
2010-09-04 | Well Log Performed |
2010-09-05 | Perforation Treatment Performed - Fractured |
2010-09-13 | Well Began Production |
2010-09-13 | Well Fluid changed to Gas |
2010-09-13 | Well Mode changed to Flowing |
2014-10-01 | Well Fluid changed to Gas |
2014-10-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-03-02 | 145.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-08-02 | Perforation | 3661.00 | 3665.00 | 10 |
2010-09-03 | Fracture | 3325.00 | 3340.50 | 0 |
2010-09-03 | Perforation | 3173.00 | 3175.00 | 10 |
2010-09-03 | Perforation | 3163.00 | 3165.00 | 10 |
2010-09-04 | Fracture | 3163.00 | 3175.00 | 0 |
2010-09-04 | Perforation | 2721.00 | 2722.50 | 10 |
2010-09-04 | Perforation | 2683.00 | 2684.50 | 10 |
2010-09-05 | Fracture | 2683.00 | 2722.50 | 0 |
2010-08-10 | Fracture | 3661.00 | 3665.00 | 0 |
2010-08-20 | Perforation | 3570.00 | 3571.00 | 10 |
2010-08-20 | Perforation | 3563.00 | 3564.00 | 10 |
2010-08-20 | Perforation | 3555.00 | 3556.00 | 10 |
2010-09-01 | Fracture | 3555.00 | 3571.00 | 0 |
2010-09-02 | Perforation | 3339.50 | 3340.50 | 10 |
2010-09-02 | Perforation | 3332.00 | 3333.00 | 10 |
2010-09-02 | Perforation | 3325.00 | 3326.00 | 10 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 1644 | 0.0 | 0.0 | 0.0 |
2011 | 6033 | 0.0 | 0.0 | 0.0 |
2012 | 6096 | 0.0 | 0.0 | 0.0 |
2013 | 2808 | 0.0 | 0.0 | 0.0 |
2014 | 2880 | 0.0 | 0.0 | 0.0 |
2015 | 5159 | 0.0 | 0.0 | 0.0 |
2016 | 480 | 0.0 | 0.0 | 0.0 |
2017 | 2665 | 0.0 | 0.0 | 0.0 |
2018 | 1086 | 0.0 | 0.0 | 0.0 |
2019 | 1990 | 0.0 | 0.0 | 0.0 |
2020 | 577 | 0.0 | 0.0 | 0.0 |
For data sources see[6]