If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0606020903000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.160257,"lon":-118.20137,"icon":""}]} |
Location: 00/03-09-060-02W6/0 | |
Location Alias: 00/03-09-60-02 W6M | |
Location Alias 2: 00/03-09-060-02 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 6 | |
Range: 02 | |
Section: 09 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: JUPITER HZ RESTHA 3-9-60-2 | |
Operator Name: Jupiter Resources Inc. | |
License Number: 0487604 | |
License Date: 2018-01-10 | |
License Status: Amended | |
Spud Date: 2018-05-10 | |
Final Drill Date: 2018-06-11 | |
Well Total Depth: 5794.00 m | |
Surface Hole Latitude: 54.160257 | |
Surface Hole Longitude: -118.201370 |
Date | Event |
---|---|
2018-01-10 | Obtained License |
2018-05-11 | Surface Casing Operation Performed |
2018-05-19 | Direction Drilling Operation Performed - Deviate |
2018-05-22 | Intermediate Casing Operation Performed |
2018-05-27 | Direction Drilling Operation Performed - Horizontal |
2018-06-11 | Finished Drilling |
2018-06-11 | Well Log Performed |
2018-06-11 | Well Mode changed to Drilled and Cased |
2018-06-25 | Liner Casing Operation Performed |
2018-06-28 | Rig Released |
2018-08-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-08-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-08-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-08-14 | Well Fluid changed to Gas |
2018-08-14 | Well Mode changed to Testing |
2018-11-12 | Well Began Production |
2018-11-12 | Well Fluid changed to Gas |
2018-11-12 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2018-05-19 | 2884.00 | Deviate (5 - 79 degrees) |
2018-05-27 | 3266.20 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-08-04 | Multi-Stage Fracture | 5755.00 | 5755.10 | 0 |
2018-08-04 | Multi-Stage Fracture | 4954.40 | 4954.50 | 0 |
2018-08-05 | Multi-Stage Fracture | 4865.10 | 4865.20 | 0 |
2018-08-05 | Multi-Stage Fracture | 4776.50 | 4776.60 | 0 |
2018-08-05 | Multi-Stage Fracture | 4688.80 | 4688.90 | 0 |
2018-08-05 | Multi-Stage Fracture | 4600.30 | 4600.40 | 0 |
2018-08-05 | Multi-Stage Fracture | 4512.80 | 4512.90 | 0 |
2018-08-05 | Multi-Stage Fracture | 4424.70 | 4424.80 | 0 |
2018-08-05 | Multi-Stage Fracture | 4335.50 | 4335.60 | 0 |
2018-08-05 | Multi-Stage Fracture | 4246.50 | 4246.60 | 0 |
2018-08-05 | Multi-Stage Fracture | 4143.10 | 4143.20 | 0 |
2018-08-04 | Multi-Stage Fracture | 5648.90 | 5649.00 | 0 |
2018-08-05 | Multi-Stage Fracture | 4070.40 | 4070.50 | 0 |
2018-08-05 | Multi-Stage Fracture | 3981.40 | 3981.50 | 0 |
2018-08-05 | Multi-Stage Fracture | 3892.40 | 3892.50 | 0 |
2018-08-05 | Multi-Stage Fracture | 3804.00 | 3804.10 | 0 |
2018-08-05 | Multi-Stage Fracture | 3686.80 | 3686.90 | 0 |
2018-08-05 | Multi-Stage Fracture | 3597.40 | 3597.50 | 0 |
2018-08-05 | Multi-Stage Fracture | 3494.70 | 3494.80 | 0 |
2018-08-06 | Multi-Stage Fracture | 3391.30 | 3391.40 | 0 |
2018-08-06 | Multi-Stage Fracture | 3302.70 | 3302.80 | 0 |
2018-08-04 | Multi-Stage Fracture | 5575.80 | 5575.90 | 0 |
2018-08-04 | Multi-Stage Fracture | 5487.20 | 5487.30 | 0 |
2018-08-04 | Multi-Stage Fracture | 5383.60 | 5383.70 | 0 |
2018-08-04 | Multi-Stage Fracture | 5295.10 | 5295.20 | 0 |
2018-08-04 | Multi-Stage Fracture | 5220.30 | 5220.40 | 0 |
2018-08-04 | Multi-Stage Fracture | 5132.00 | 5132.10 | 0 |
2018-08-04 | Multi-Stage Fracture | 5043.70 | 5043.80 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-08-04 | 2018-08-06 | 3,181 | 12,280 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 81.869 | N/A | |||
30/50 Prime Plus | Calfrac | Quartz | 14808-60-7 | 100 | 3.1454 | N/A | ||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 14.4517 | N/A | ||
50/140 Sand (Domestic) | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 1.4872 | N/A | ||
SaniFrac 8844 | Calfrac | Bactericide/Biocide | Acetamide. 2.2-dibromo-2-cyano | 10222-01-2 | 100 | 0.0101 | N/A | |
Acetonitrile. 2.2-dibromo | 3252-43-5 | 100 | 0.0102 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0101 | N/A | ||||
Polyethylene glycol | 25322-68-3 | 100 | 0.0101 | N/A | ||||
Sodium bromide | 7647-15-6 | 100 | 0.0101 | N/A | ||||
DWP-690 | Calfrac | Breaker | Hydrogen peroxide | 7722-84-1 | 100 | 0.022 | N/A | |
Water | 7732-18-5 | 100 | 0.022 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0451 | N/A | |
CalVisc | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.2729 | N/A |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 1278 | 0.0 | 0.0 | 0.0 |
2019 | 8155 | 0.0 | 0.0 | 0.0 |
2020 | 2109 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-05-27 | No Incident Encountered | 0.00 | 0.00 |
2018-08-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]