If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0606020901005 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.161794,"lon":-118.221219,"icon":""}]} |
Location: 00/01-09-060-02W6/5 | |
Location Alias: 00/01-09-60-02 W6M | |
Location Alias 2: 00/01-09-060-02 W6/05 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 6 | |
Range: 02 | |
Section: 09 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: ECA ECOG RESTHA 1-9-60-2 | |
Operator Name: Jupiter Resources Inc. | |
License Number: 0386029 | |
License Date: 2007-11-29 | |
License Status: Suspension | |
Spud Date: 2007-12-10 | |
Final Drill Date: 2007-12-29 | |
Well Total Depth: 3653.00 m | |
Surface Hole Latitude: 54.161794 | |
Surface Hole Longitude: -118.221219 |
Date | Event |
---|---|
2007-11-29 | Obtained License |
2007-12-12 | Surface Casing Operation Performed |
2007-12-14 | Direction Drilling Operation Performed - Deviate |
2007-12-21 | Intermediate Casing Operation Performed |
2007-12-22 | Kick Occurred |
2007-12-25 | Kick Occurred |
2007-12-29 | Finished Drilling |
2007-12-29 | Well Log Performed |
2007-12-29 | Well Mode changed to Drilled and Cased |
2007-12-31 | Production Casing Operation Performed |
2007-12-31 | Rig Released |
2008-01-12 | Perforation Treatment Performed - Jet Perforation |
2008-01-12 | Well Log Performed |
2008-01-13 | Perforation Treatment Performed - Fractured |
2008-01-13 | Perforation Treatment Performed - Jet Perforation |
2008-01-13 | Well Log Performed |
2008-01-14 | Perforation Treatment Performed - Fractured |
2008-01-15 | Perforation Treatment Performed - Fractured |
2008-01-15 | Perforation Treatment Performed - Jet Perforation |
2008-01-16 | Perforation Treatment Performed - Fractured |
2008-01-16 | Perforation Treatment Performed - Jet Perforation |
2008-01-16 | Well Log Performed |
2008-01-20 | Well Log Performed |
2008-01-21 | Perforation Treatment Performed - Fractured |
2008-01-21 | Perforation Treatment Performed - Jet Perforation |
2008-01-21 | Well Log Performed |
2008-01-22 | Perforation Treatment Performed - Fractured |
2008-01-22 | Perforation Treatment Performed - Jet Perforation |
2008-01-22 | Well Log Performed |
2008-01-24 | Perforation Treatment Performed - Fractured |
2008-02-14 | Well Log Performed |
2008-02-16 | Well Log Performed |
2008-02-27 | Well Log Performed |
2008-04-23 | Well Structure changed to Commingled |
2009-08-22 | Well Log Performed |
2009-08-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-08-25 | Perforation Treatment Performed - Cement Squeeze |
2009-08-25 | Plug Back Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2007-12-14 | 638.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-01-12 | Perforation | 3609.00 | 3610.00 | 10 |
2008-01-15 | Fracture | 3337.50 | 3342.80 | 0 |
2008-01-16 | Perforation | 3228.10 | 3230.10 | 10 |
2008-01-16 | Fracture | 3228.10 | 3230.10 | 0 |
2008-01-21 | Perforation | 3068.00 | 3069.00 | 10 |
2008-01-21 | Perforation | 3059.50 | 3061.00 | 10 |
2008-01-21 | Fracture | 3059.50 | 3069.00 | 0 |
2008-01-21 | Perforation | 3042.50 | 3043.50 | 10 |
2008-01-21 | Perforation | 3035.00 | 3037.00 | 10 |
2008-01-21 | Perforation | 3031.60 | 3032.60 | 10 |
2008-01-22 | Fracture | 3031.60 | 3043.50 | 0 |
2008-01-12 | Perforation | 3562.50 | 3564.50 | 10 |
2008-01-22 | Perforation | 2580.00 | 2583.00 | 10 |
2008-01-24 | Fracture | 2580.00 | 2583.00 | 0 |
2009-08-25 | Cement Squeeze | 3228.10 | 3230.10 | 0 |
2009-08-25 | Packing Device Capped w/Cement | 3203.00 | 3215.00 | 0 |
2008-01-13 | Fracture | 3562.50 | 3610.00 | 0 |
2008-01-13 | Perforation | 3461.50 | 3463.00 | 10 |
2008-01-13 | Perforation | 3450.00 | 3451.00 | 10 |
2008-01-13 | Perforation | 3444.60 | 3446.10 | 10 |
2008-01-14 | Fracture | 3444.60 | 3463.00 | 0 |
2008-01-15 | Perforation | 3341.80 | 3342.80 | 10 |
2008-01-15 | Perforation | 3337.50 | 3338.50 | 10 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2007-12-22 | Kick | 2870.00 | 2870.00 |
2007-12-25 | Kick | 3460.00 | 3460.00 |
For data sources see[6]