X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605262108000

Well Details

Well ID: 0605262108000
Loading map...
Location: 00/08-21-060-26W5/0
Location Alias: 00/08-21-60-26 W5M
Location Alias 2: 00/08-21-060-26 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 26
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE HZ LELAND 8-21-60-26
Operator Name: Tourmaline Oil Corp.
License Number: 0489562
License Date: 2018-06-13
License Status: Issued
Spud Date: 2018-12-09
Final Drill Date: 2018-12-24
Well Total Depth: 4378.00 m
Surface Hole Latitude: 54.198780
Surface Hole Longitude: -117.853397

For data sources see[1][2]

Well History

Date Event
2018-06-13 Obtained License
2018-12-09 Direction Drilling Operation Performed - Deviate
2018-12-09 Lost Circulation Occurred
2018-12-10 Surface Casing Operation Performed
2018-12-17 Lost Circulation Occurred
2018-12-20 Intermediate Casing Operation Performed
2018-12-21 Direction Drilling Operation Performed - Horizontal
2018-12-21 Lost Circulation Occurred
2018-12-24 Finished Drilling
2018-12-24 Well Log Performed
2018-12-24 Well Mode changed to Drilled and Cased
2018-12-25 Well Log Performed
2018-12-28 Liner Casing Operation Performed
2018-12-28 Rig Released
2019-01-18 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-19 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-19 Well Began Production
2019-01-19 Well Fluid changed to Gas
2019-01-19 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-12-09 Precision Drilling Corporation 531 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-12-09 165.60 Deviate (5 - 79 degrees)
2018-12-21 3025.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-01-18 Multi-Stage Fracture 4329.20 4329.30 0
2019-01-18 Multi-Stage Fracture 3870.90 3871.00 0
2019-01-19 Multi-Stage Fracture 3818.80 3818.90 0
2019-01-19 Multi-Stage Fracture 3766.60 3766.70 0
2019-01-19 Multi-Stage Fracture 3714.60 3714.70 0
2019-01-19 Multi-Stage Fracture 3662.50 3662.60 0
2019-01-19 Multi-Stage Fracture 3610.40 3610.50 0
2019-01-19 Multi-Stage Fracture 3558.20 3558.30 0
2019-01-19 Multi-Stage Fracture 3506.10 3506.20 0
2019-01-19 Multi-Stage Fracture 3454.00 3454.10 0
2019-01-19 Multi-Stage Fracture 3401.90 3402.00 0
2019-01-18 Multi-Stage Fracture 4287.80 4287.90 0
2019-01-19 Multi-Stage Fracture 3349.80 3349.90 0
2019-01-19 Multi-Stage Fracture 3297.80 3297.90 0
2019-01-19 Multi-Stage Fracture 3245.50 3245.60 0
2019-01-19 Multi-Stage Fracture 3193.40 3193.50 0
2019-01-19 Multi-Stage Fracture 3141.20 3141.30 0
2019-01-19 Multi-Stage Fracture 3089.00 3089.10 0
2019-01-19 Multi-Stage Fracture 2922.00 2922.10 0
2019-01-18 Multi-Stage Fracture 4235.70 4235.80 0
2019-01-18 Multi-Stage Fracture 4183.50 4183.60 0
2019-01-18 Multi-Stage Fracture 4131.40 4131.50 0
2019-01-18 Multi-Stage Fracture 4079.20 4079.30 0
2019-01-18 Multi-Stage Fracture 4027.30 4027.40 0
2019-01-18 Multi-Stage Fracture 3975.10 3975.20 0
2019-01-18 Multi-Stage Fracture 3923.00 3923.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-01-18 2019-01-19 2,881 6,260 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 82.4544 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.5128 N/A
silica crystalline 14808-60-7 100 3.5128 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 12.0936 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.7564 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0098 N/A
dibromoacetonitrile 3252-43-5 100 0.0098 N/A
non-hazardous ingredients Not Available 100 0.0098 N/A
polyethylene glycol 25322-68-3 100 0.0098 N/A
sodium bromide 7647-15-6 100 0.0098 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.088 N/A
water Not Available 100 0.088 N/A
FR-22 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0445 N/A
non-hazardous ingredients Not Available 100 0.0445 N/A
S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0401 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0401 N/A
methanol 67-56-1 100 0.0401 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0401 N/A
non-hazardous ingredients Not Available 100 0.0401 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-01-18 2019-01-19 Surface Water - Lake 6260

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 7929 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-12-09 Lost Circulation 20.00 160.00
2018-12-17 Lost Circulation 1476.00 1476.00
2018-12-21 Lost Circulation 3124.00 3124.00
2019-02-05 No Incident Encountered 0.00 0.00

For data sources see[10]

References