If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0605261713000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.193733,"lon":-117.852744,"icon":""}]} |
Location: 00/13-17-060-26W5/0 | |
Location Alias: 00/13-17-60-26 W5M | |
Location Alias 2: 00/13-17-060-26 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 5 | |
Range: 26 | |
Section: 17 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TOURMALINE HZ LELAND 13-17-60-26 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0475596 | |
License Date: 2015-06-01 | |
License Status: Issued | |
Spud Date: 2015-10-10 | |
Final Drill Date: 2015-10-25 | |
Well Total Depth: 4101.00 m | |
Surface Hole Latitude: 54.193733 | |
Surface Hole Longitude: -117.852744 |
Date | Event |
---|---|
2015-06-01 | Obtained License |
2015-10-11 | Surface Casing Operation Performed |
2015-10-15 | Intermediate Casing Operation Performed |
2015-10-17 | Direction Drilling Operation Performed - Deviate |
2015-10-21 | Direction Drilling Operation Performed - Horizontal |
2015-10-21 | Well Log Performed |
2015-10-25 | Finished Drilling |
2015-10-25 | Well Log Performed |
2015-10-25 | Well Mode changed to Drilled and Cased |
2015-10-28 | Production Casing Operation Performed |
2015-10-29 | Rig Released |
2016-01-13 | Well Log Performed |
2016-01-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-01-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-02-04 | Well Began Production |
2016-02-04 | Well Fluid changed to Gas |
2016-02-04 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-10-10 | Nabors Drilling Limited | 79 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-10-17 | 2640.90 | Deviate (5 - 79 degrees) |
2015-10-21 | 2947.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2016-01-18 | Multi-Stage Fracture | 4088.20 | 4088.30 | 0 |
2016-01-18 | Multi-Stage Fracture | 3605.80 | 3605.90 | 0 |
2016-01-18 | Multi-Stage Fracture | 3553.40 | 3553.50 | 0 |
2016-01-19 | Multi-Stage Fracture | 3501.10 | 3501.20 | 0 |
2016-01-19 | Multi-Stage Fracture | 3448.40 | 3448.50 | 0 |
2016-01-19 | Multi-Stage Fracture | 3395.80 | 3395.90 | 0 |
2016-01-19 | Multi-Stage Fracture | 3343.10 | 3343.20 | 0 |
2016-01-19 | Multi-Stage Fracture | 3290.40 | 3290.50 | 0 |
2016-01-19 | Multi-Stage Fracture | 3237.80 | 3237.90 | 0 |
2016-01-19 | Multi-Stage Fracture | 3185.60 | 3185.70 | 0 |
2016-01-19 | Multi-Stage Fracture | 3133.00 | 3133.10 | 0 |
2016-01-18 | Multi-Stage Fracture | 4026.60 | 4026.70 | 0 |
2016-01-19 | Multi-Stage Fracture | 3080.50 | 3080.60 | 0 |
2016-01-19 | Multi-Stage Fracture | 3040.50 | 3040.60 | 0 |
2016-01-19 | Multi-Stage Fracture | 3000.60 | 3000.70 | 0 |
2016-01-19 | Multi-Stage Fracture | 2960.70 | 2960.80 | 0 |
2016-01-18 | Multi-Stage Fracture | 3974.00 | 3974.10 | 0 |
2016-01-18 | Multi-Stage Fracture | 3921.30 | 3921.40 | 0 |
2016-01-18 | Multi-Stage Fracture | 3868.80 | 3868.90 | 0 |
2016-01-18 | Multi-Stage Fracture | 3816.10 | 3816.20 | 0 |
2016-01-18 | Multi-Stage Fracture | 3763.60 | 3763.70 | 0 |
2016-01-18 | Multi-Stage Fracture | 3710.90 | 3711.00 | 0 |
2016-01-18 | Multi-Stage Fracture | 3658.40 | 3658.50 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-01-18 | 2016-01-19 | 2,853 | 6,582 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 83.9856 | N/A | |||
Prime Plus 40/70 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 4.4643 | N/A | ||
silica crystalline | 14808-60-7 | 100 | 4.4643 | N/A | ||||
Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 9.7668 | N/A | ||
Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 1.4814 | N/A | ||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0112 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0112 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0112 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0112 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0112 | N/A | ||||
CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.1551 | N/A | |
water | Not Available | 100 | 0.1551 | N/A | ||||
FR-9 | Trican | Friction Reducer | alcohols. C10-16. ethoxylated | 68002-97-1 | 100 | 0.0654 | N/A | |
alcohols. C12-14. ethoxylated | 68439-50-9 | 100 | 0.0654 | N/A | ||||
alcohols. C12-16. ethoxylated | 68551-12-2 | 100 | 0.0654 | N/A | ||||
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0654 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0654 | N/A | ||||
S-2 | Trican | Surfactant | 2-ethylhexanol | 104-76-7 | 100 | 0.0697 | N/A | |
isopropanol | 67-63-0 | 100 | 0.0697 | N/A | ||||
methanol | 67-56-1 | 100 | 0.0697 | N/A | ||||
oxydiethylenebis(alkyldimethyl ammonium chloride) | 68607-28-3 | 100 | 0.0697 | N/A | ||||
solvent naphtha (petroleum). heavy aromatic | 64742-94-5 | 100 | 0.0697 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2016-01-14 | 2016-02-05 | Oilfield Produced Water | 441 |
2016-01-13 | 2016-01-19 | Surface Water - Lake | 6141 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2016 | 7878 | 0.0 | 0.0 | 0.0 |
2017 | 8287 | 0.0 | 0.0 | 0.0 |
2018 | 8410 | 0.0 | 0.0 | 0.0 |
2019 | 7443 | 0.0 | 0.0 | 0.0 |
2020 | 1616 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-10-30 | No Incident Encountered | 0.00 | 0.00 |
2016-02-08 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]