X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605260809000

Well Details

Well ID: 0605260809000
Loading map...
Location: 00/09-08-060-26W5/0
Location Alias: 00/09-08-60-26 W5M
Location Alias 2: 00/09-08-060-26 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 26
Section: 08
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE HZ SMOKY 9-8-60-26
Operator Name: Tourmaline Oil Corp.
License Number: 0481796
License Date: 2016-12-12
License Status: Issued
Spud Date: 2016-12-20
Final Drill Date: 2017-01-30
Well Total Depth: 4280.00 m
Surface Hole Latitude: 54.175747
Surface Hole Longitude: -117.876777

For data sources see[1][2]

Well History

Date Event
2016-12-12 Obtained License
2016-12-21 Surface Casing Operation Performed
2017-01-02 Intermediate Casing Operation Performed
2017-01-22 Direction Drilling Operation Performed - Deviate
2017-01-25 Direction Drilling Operation Performed - Horizontal
2017-01-25 Well Log Performed
2017-01-26 Well Log Performed
2017-01-30 Finished Drilling
2017-01-30 Well Log Performed
2017-01-30 Well Mode changed to Drilled and Cased
2017-01-31 Well Log Performed
2017-02-01 Production Casing Operation Performed
2017-02-02 Rig Released
2017-02-23 Well Log Performed
2017-02-27 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-06 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-07 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-07 Well Began Production
2017-03-07 Well Fluid changed to Gas
2017-03-07 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-12-20 Ensign Drilling Inc. 147 N/A Set Surface
2017-01-20 Ensign Drilling Inc. 147 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-01-22 2631.60 Deviate (5 - 79 degrees)
2017-01-25 2947.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-02-27 Multi-Stage Fracture 4234.70 4234.80 0
2017-03-06 Multi-Stage Fracture 3765.30 3765.40 0
2017-03-06 Multi-Stage Fracture 3713.60 3713.70 0
2017-03-06 Multi-Stage Fracture 3661.60 3661.70 0
2017-03-06 Multi-Stage Fracture 3609.50 3609.60 0
2017-03-07 Multi-Stage Fracture 3557.60 3557.70 0
2017-03-07 Multi-Stage Fracture 3505.60 3505.70 0
2017-03-07 Multi-Stage Fracture 3453.90 3454.00 0
2017-03-07 Multi-Stage Fracture 3402.10 3402.20 0
2017-03-07 Multi-Stage Fracture 3350.40 3350.50 0
2017-03-07 Multi-Stage Fracture 3298.40 3298.50 0
2017-03-06 Multi-Stage Fracture 4181.20 4181.30 0
2017-03-07 Multi-Stage Fracture 3246.50 3246.60 0
2017-03-07 Multi-Stage Fracture 3194.60 3194.70 0
2017-03-07 Multi-Stage Fracture 3155.00 3155.10 0
2017-03-07 Multi-Stage Fracture 3115.50 3115.60 0
2017-03-06 Multi-Stage Fracture 4128.70 4128.80 0
2017-03-06 Multi-Stage Fracture 4076.60 4076.70 0
2017-03-06 Multi-Stage Fracture 4024.70 4024.80 0
2017-03-06 Multi-Stage Fracture 3972.50 3972.60 0
2017-03-06 Multi-Stage Fracture 3920.80 3920.90 0
2017-03-06 Multi-Stage Fracture 3868.80 3868.90 0
2017-03-06 Multi-Stage Fracture 3817.10 3817.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-02-27 2017-03-07 2,874 6,337 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.2731 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 2.0532 N/A
silica crystalline 14808-60-7 100 2.0532 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 13.2475 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.1984 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0099 N/A
2-mercaptoethanol 60-24-2 100 0.0099 N/A
dibromoacetonitrile 3252-43-5 100 0.0099 N/A
non-hazardous ingredients Not Available 100 0.0099 N/A
sodium bromide 7647-15-6 100 0.0099 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0889 N/A
water Not Available 100 0.0889 N/A
FR-9 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.087 N/A
alcohols. C12-14. ethoxylated 68439-50-9 100 0.087 N/A
alcohols. C12-16. ethoxylated 68551-12-2 100 0.087 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.087 N/A
non-hazardous ingredients Not Available 100 0.087 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0418 N/A
methanol 67-56-1 100 0.0418 N/A
water Not Available 100 0.0418 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-03-06 2017-03-06 Recycled Fracturing Water (treated at well site) 2644
2017-03-07 2017-03-07 Recycled Fracturing Water (treated at well site) 1057
2017-03-07 2017-03-07 Surface Water - Runoff 2636

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 6885 0.0 0.0 0.0
2018 8402 0.0 0.0 0.0
2019 6948 0.0 0.0 0.0
2020 2099 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-30 No Incident Encountered 0.00 0.00
2017-03-20 No Incident Encountered 0.00 0.00

For data sources see[10]

References