X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605260316000

Well Details

Well ID: 0605260316000
Loading map...
Location: 00/16-03-060-26W5/0
Location Alias: 00/16-03-60-26 W5M
Location Alias 2: 00/16-03-060-26 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 26
Section: 03
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE HZ LELAND 16-3-60-26
Operator Name: Tourmaline Oil Corp.
License Number: 0476591
License Date: 2015-08-14
License Status: Issued
Spud Date: 2016-01-30
Final Drill Date: 2016-02-13
Well Total Depth: 4556.00 m
Surface Hole Latitude: 54.159916
Surface Hole Longitude: -117.828574

For data sources see[1][2]

Well History

Date Event
2015-08-14 Obtained License
2016-01-31 Surface Casing Operation Performed
2016-02-03 Intermediate Casing Operation Performed
2016-02-05 Direction Drilling Operation Performed - Deviate
2016-02-08 Direction Drilling Operation Performed - Horizontal
2016-02-08 Well Log Performed
2016-02-09 Well Log Performed
2016-02-13 Finished Drilling
2016-02-13 Well Log Performed
2016-02-13 Well Mode changed to Drilled and Cased
2016-02-16 Production Casing Operation Performed
2016-02-17 Rig Released
2016-02-20 Well Log Performed
2016-02-24 Perforation Treatment Performed - Multi-Stage Fracture
2016-02-25 Perforation Treatment Performed - Multi-Stage Fracture
2016-02-26 Perforation Treatment Performed - Multi-Stage Fracture
2016-02-28 Well Began Production
2016-02-28 Well Fluid changed to Gas
2016-02-28 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-01-30 Nabors Drilling Limited 79 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-02-05 2508.30 Deviate (5 - 79 degrees)
2016-02-08 2910.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-02-24 Multi-Stage Fracture 4513.90 4514.00 0
2016-02-25 Multi-Stage Fracture 4023.70 4023.80 0
2016-02-25 Multi-Stage Fracture 3970.90 3971.00 0
2016-02-25 Multi-Stage Fracture 3918.10 3918.20 0
2016-02-25 Multi-Stage Fracture 3866.00 3866.10 0
2016-02-25 Multi-Stage Fracture 3813.20 3813.30 0
2016-02-25 Multi-Stage Fracture 3760.50 3760.60 0
2016-02-26 Multi-Stage Fracture 3707.70 3707.80 0
2016-02-26 Multi-Stage Fracture 3654.90 3655.00 0
2016-02-26 Multi-Stage Fracture 3603.00 3603.10 0
2016-02-26 Multi-Stage Fracture 3551.70 3551.80 0
2016-02-24 Multi-Stage Fracture 4444.00 4444.10 0
2016-02-26 Multi-Stage Fracture 3499.60 3499.70 0
2016-02-26 Multi-Stage Fracture 3447.10 3447.20 0
2016-02-26 Multi-Stage Fracture 3394.30 3394.40 0
2016-02-26 Multi-Stage Fracture 3341.80 3341.90 0
2016-02-26 Multi-Stage Fracture 3289.10 3289.20 0
2016-02-24 Multi-Stage Fracture 4391.40 4391.50 0
2016-02-25 Multi-Stage Fracture 4338.60 4338.70 0
2016-02-25 Multi-Stage Fracture 4285.80 4285.90 0
2016-02-25 Multi-Stage Fracture 4233.00 4233.10 0
2016-02-25 Multi-Stage Fracture 4182.10 4182.20 0
2016-02-25 Multi-Stage Fracture 4129.30 4129.40 0
2016-02-25 Multi-Stage Fracture 4076.50 4076.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-02-24 2016-02-26 2,794 7,165 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 84.2833 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 4.031 N/A
silica crystalline 14808-60-7 100 4.031 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 10.0934 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.3386 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0073 N/A
dibromoacetonitrile 3252-43-5 100 0.0073 N/A
non-hazardous ingredients Not Available 100 0.0073 N/A
polyethylene glycol 25322-68-3 100 0.0073 N/A
sodium bromide 7647-15-6 100 0.0073 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0923 N/A
water Not Available 100 0.0923 N/A
FR-9 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0814 N/A
alcohols. C12-14. ethoxylated 68439-50-9 100 0.0814 N/A
alcohols. C12-16. ethoxylated 68551-12-2 100 0.0814 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0814 N/A
non-hazardous ingredients Not Available 100 0.0814 N/A
S-2 Trican Surfactant 2-ethylhexanol 104-76-7 100 0.0724 N/A
isopropanol 67-63-0 100 0.0724 N/A
methanol 67-56-1 100 0.0724 N/A
oxydiethylenebis(alkyldimethyl ammonium chloride) 68607-28-3 100 0.0724 N/A
solvent naphtha (petroleum). heavy aromatic 64742-94-5 100 0.0724 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-02-21 2016-02-23 Recycled Fracturing Water (treated at well site) 2571
2016-02-25 2016-02-25 Recycled Fracturing Water (treated at well site) 2612
2016-02-12 2016-02-16 Groundwater - Non-saline less than or equal to 150m deep 685
2016-02-14 2016-02-26 Surface Water - Runoff 458
2016-02-20 2016-03-09 Oilfield Produced Water 914

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 4417 0.0 0.0 0.0
2017 6378 0.0 0.0 0.0
2018 8494 0.0 0.0 0.0
2019 6957 0.0 0.0 0.0
2020 1497 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-02-13 No Incident Encountered 0.00 0.00
2016-03-09 No Incident Encountered 0.00 0.00

For data sources see[10]

References