X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605232804020

Well Details

Well ID: 0605232804020
Loading map...
Location: 02/04-28-060-23W5/0
Location Alias: 02/04-28-60-23 W5M
Location Alias 2: 02/04-28-060-23 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 23
Section: 28
County/Municipality: Municipal District of Greenview No. 16
Well Name: ATH 102 HZ PLACID 4-28-60-23
Operator Name: Athabasca Oil Corporation
License Number: 0481073
License Date: 2016-11-01
License Status: Amended
Spud Date: 2017-01-07
Final Drill Date: 2017-03-21
Well Total Depth: 5747.00 m
Surface Hole Latitude: 54.240494
Surface Hole Longitude: -117.394943

For data sources see[1][2]

Well History

Date Event
2016-11-01 Obtained License
2017-01-07 Surface Casing Operation Performed
2017-01-21 Direction Drilling Operation Performed - Deviate
2017-01-26 Well Log Performed
2017-01-28 Intermediate Casing Operation Performed
2017-03-15 Direction Drilling Operation Performed - Horizontal
2017-03-21 Finished Drilling
2017-03-21 Well Log Performed
2017-03-21 Well Mode changed to Drilled and Cased
2017-03-22 Production Casing Operation Performed
2017-03-23 Rig Released
2017-06-22 Perforation Treatment Performed - Open-Hole Completion
2017-06-22 Well Log Performed
2017-07-07 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-08 Perforation Treatment Performed - Fractured
2017-07-08 Perforation Treatment Performed - Jet Perforation
2017-07-08 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-09 Perforation Treatment Performed - Fractured
2017-07-09 Perforation Treatment Performed - Jet Perforation
2017-07-10 Perforation Treatment Performed - Fractured
2017-07-10 Perforation Treatment Performed - Jet Perforation
2017-07-11 Perforation Treatment Performed - Fractured
2017-07-11 Perforation Treatment Performed - Jet Perforation
2017-07-12 Perforation Treatment Performed - Fractured
2017-07-12 Perforation Treatment Performed - Jet Perforation
2017-07-13 Perforation Treatment Performed - Fractured
2017-07-13 Perforation Treatment Performed - Jet Perforation
2017-08-01 Well Fluid changed to Gas
2017-08-01 Well Mode changed to Testing
2017-09-08 Well Began Production
2017-09-08 Well Fluid changed to Gas
2017-09-08 Well Mode changed to Flowing
2019-09-01 Well Fluid changed to Gas
2019-09-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-01-07 Precision Drilling Corporation 531 N/A Set Surface
2017-03-14 Precision Drilling Corporation 531 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-01-21 792.00 Deviate (5 - 79 degrees)
2017-03-15 2953.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-06-22 Open Hole/Barefoot Completion 5738.00 5747.00 0
2017-07-08 Fracture 5318.50 5377.80 0
2017-07-12 Perforation 3465.50 3465.80 20
2017-07-12 Perforation 3438.50 3438.80 20
2017-07-12 Fracture 3438.50 3492.80 0
2017-07-12 Perforation 3411.50 3411.80 20
2017-07-12 Perforation 3384.50 3384.80 20
2017-07-12 Perforation 3357.50 3357.80 20
2017-07-12 Fracture 3357.50 3411.80 0
2017-07-12 Perforation 3330.50 3330.80 20
2017-07-12 Perforation 3303.50 3303.80 20
2017-07-12 Perforation 3276.50 3276.80 20
2017-07-08 Perforation 5291.50 5291.80 20
2017-07-12 Fracture 3276.50 3330.80 0
2017-07-12 Perforation 3249.50 3249.80 20
2017-07-12 Perforation 3222.50 3222.80 20
2017-07-12 Perforation 3195.50 3195.80 20
2017-07-13 Fracture 3195.50 3249.80 0
2017-07-13 Perforation 3168.50 3168.80 20
2017-07-13 Perforation 3141.50 3141.80 20
2017-07-13 Perforation 3114.50 3114.80 20
2017-07-13 Fracture 3114.50 3168.80 0
2017-07-13 Perforation 3087.50 3087.80 2
2017-07-08 Perforation 5264.50 5264.80 20
2017-07-13 Perforation 3060.50 3060.80 20
2017-07-13 Perforation 3033.50 3033.80 20
2017-07-13 Fracture 3033.50 3087.80 0
2017-07-08 Perforation 5237.50 5237.80 20
2017-07-08 Fracture 5237.50 5291.80 0
2017-07-08 Perforation 5202.50 5202.80 20
2017-07-08 Perforation 5175.50 5175.80 20
2017-07-08 Perforation 5148.50 5148.80 20
2017-07-09 Fracture 5148.50 5202.80 0
2017-07-09 Perforation 5121.50 5121.80 20
2017-07-07 Multi-Stage Fracture 5633.60 5666.10 0
2017-07-09 Perforation 5094.50 5094.80 20
2017-07-09 Perforation 5067.50 5067.80 20
2017-07-09 Fracture 5067.50 5121.80 0
2017-07-09 Perforation 5040.50 5040.80 20
2017-07-09 Perforation 5013.50 5013.80 20
2017-07-09 Perforation 4986.50 4986.80 20
2017-07-09 Fracture 4986.50 5040.80 0
2017-07-09 Perforation 4959.50 4959.80 20
2017-07-09 Perforation 4932.50 4932.80 20
2017-07-09 Perforation 4905.50 4905.80 20
2017-07-07 Multi-Stage Fracture 5574.30 5604.30 0
2017-07-09 Fracture 4905.50 4959.80 0
2017-07-09 Perforation 4878.50 4878.80 20
2017-07-09 Perforation 4851.50 4851.80 20
2017-07-09 Perforation 4824.50 4824.80 20
2017-07-09 Fracture 4824.50 4878.80 0
2017-07-09 Perforation 4797.50 4797.80 20
2017-07-09 Perforation 4770.50 4770.80 20
2017-07-09 Perforation 4738.50 4738.80 20
2017-07-09 Fracture 4738.50 4797.80 0
2017-07-10 Perforation 4711.50 4711.80 20
2017-07-08 Multi-Stage Fracture 5517.20 5546.40 0
2017-07-10 Perforation 4684.50 4684.80 20
2017-07-10 Perforation 4657.50 4657.80 20
2017-07-10 Fracture 4657.50 4711.80 0
2017-07-10 Perforation 4630.50 4630.80 20
2017-07-10 Perforation 4603.50 4603.80 20
2017-07-10 Perforation 4576.50 4576.80 20
2017-07-10 Fracture 4576.50 4630.80 0
2017-07-10 Perforation 4549.50 4549.80 20
2017-07-10 Perforation 4522.50 4522.80 20
2017-07-10 Perforation 4495.50 4495.80 20
2017-07-08 Multi-Stage Fracture 5460.30 5489.70 0
2017-07-10 Fracture 4495.50 4549.80 0
2017-07-10 Perforation 4468.50 4468.80 20
2017-07-10 Perforation 4441.50 4441.80 20
2017-07-10 Perforation 4414.50 4414.80 20
2017-07-10 Fracture 4414.50 4468.80 0
2017-07-10 Perforation 4387.50 4387.80 20
2017-07-10 Perforation 4360.50 4360.80 20
2017-07-10 Perforation 4333.50 4333.80 20
2017-07-10 Fracture 4333.50 4387.80 0
2017-07-11 Perforation 4306.50 4306.80 20
2017-07-08 Multi-Stage Fracture 5403.80 5433.00 0
2017-07-11 Perforation 4279.50 4279.80 20
2017-07-11 Perforation 4252.50 4252.80 20
2017-07-11 Fracture 4252.50 4306.80 0
2017-07-11 Perforation 4225.50 4225.80 20
2017-07-11 Perforation 4198.50 4198.80 20
2017-07-11 Perforation 4171.50 4171.80 20
2017-07-11 Fracture 4171.50 4225.80 0
2017-07-11 Perforation 4144.50 4144.80 20
2017-07-11 Perforation 4117.50 4117.80 20
2017-07-11 Perforation 4090.50 4090.80 20
2017-07-08 Perforation 5377.50 5377.80 20
2017-07-11 Fracture 4090.50 4144.80 0
2017-07-11 Perforation 4055.50 4055.80 20
2017-07-11 Perforation 4028.50 4028.80 20
2017-07-11 Perforation 4001.50 4001.80 20
2017-07-11 Fracture 4001.50 4055.80 0
2017-07-11 Perforation 3974.50 3974.80 20
2017-07-11 Perforation 3947.50 3947.80 20
2017-07-11 Perforation 3920.50 3920.80 20
2017-07-11 Fracture 3920.50 3974.80 0
2017-07-11 Perforation 3893.50 3893.80 20
2017-07-08 Perforation 5350.50 5350.80 20
2017-07-11 Perforation 3866.50 3866.80 20
2017-07-11 Perforation 3839.50 3839.80 20
2017-07-11 Fracture 3839.50 3893.80 0
2017-07-11 Perforation 3812.50 3812.80 20
2017-07-11 Perforation 3789.50 3789.80 20
2017-07-11 Perforation 3762.50 3762.80 20
2017-07-12 Fracture 3762.50 3812.80 0
2017-07-12 Perforation 3735.50 3735.80 20
2017-07-12 Perforation 3708.50 3708.80 20
2017-07-12 Perforation 3681.50 3681.80 20
2017-07-08 Perforation 5318.50 5318.80 20
2017-07-12 Fracture 3681.50 3735.80 0
2017-07-12 Perforation 3654.50 3654.80 20
2017-07-12 Perforation 3627.50 3627.80 20
2017-07-12 Perforation 3600.50 3600.80 20
2017-07-12 Fracture 3600.50 3654.80 0
2017-07-12 Perforation 3573.50 3573.80 20
2017-07-12 Perforation 3546.50 3546.80 20
2017-07-12 Perforation 3519.50 3519.80 20
2017-07-12 Fracture 3519.50 3573.80 0
2017-07-12 Perforation 3492.50 3492.80 20

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-07-07 2017-07-13 2,738 26,663 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 81.5036 N/A
Prime Plus (30/50) Canyon Technical Services No specific ingredients Not Available 100 2.201 N/A
Sand (40/70) Ottawa Canyon Technical Services Aluminum Oxide 1344-28-1 100 8.8043 N/A
Crystalline silica. quartz 14808-60-7 100 8.8043 N/A
Iron Oxide 1309-37-1 100 8.8043 N/A
Titanium Oxide 13463-67-7 100 8.8044 N/A
Sand (50/140) Canyon Technical Services Aluminum Oxide 1344-28-1 100 3.3016 N/A
Crystalline silica. quartz 14808-60-7 100 3.3016 N/A
Iron Oxide 1309-37-1 100 3.3016 N/A
Titanium Oxide 13463-67-7 100 3.3016 N/A
HCL 15% Canyon Technical Services Acid Hydrogen Chloride 7647-01-0 100 1.1829 N/A
Water 7732-18-5 100 1.1829 N/A
Chemcide PT Canyon Technical Services Bactericide/Biocide Methyl Alcohol 67-56-1 100 0.0084 N/A
N-Coco Alkyltrimethylenediamine diacetates 61791-64-8 100 0.0084 N/A
CAN-1912 Clay Stabilizer (HT) Canyon Technical Services Clay Control No hazardous ingredients Not Available 100 0.0886 N/A
CAN-1004 Corrosion Inhibitor Canyon Technical Services Corrosion Inhibitor Alcohols. C12-15. ethoxylated 68131-39-5 100 0.0034 N/A
Alcohols. C14-15. ethoxylated 68951-67-7 100 0.0034 N/A
Formic Acid 64-18-6 100 0.0034 N/A
Isopropanol 67-63-0 100 0.0035 N/A
Methanol 67-56-1 100 0.0035 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0034 N/A
CAN-1203 Anti-Sludge Agent / Non-Emulsifier Canyon Technical Services Demulsifier Refer to MSDS 8253 100 0.0019 N/A
Nitrogen Gas Canyon Technical Services Energizing Fluid Nitrogen 7727-37-9 100 2.7625 N/A
Non-hazardous base ingredient(s) Not Available 100 2.7625 N/A
CAN-2057 Friction Reducer Canyon Technical Services Gelling Agent No hazardous ingredients Not Available 100 0.083 N/A
CAN-1101 Iron Control Reduction Canyon Technical Services Iron Control 2-Mercaptoethanol 60-24-2 100 0.0031 N/A
Cupric Chloride 7447-39-4 100 0.0031 N/A
Monoethanolamine 141-43-5 100 0.0031 N/A
CAN-1402 Scale Inhibitor Canyon Technical Services Scale Inhibitor Methyl Alcohol 67-56-1 100 0.012 N/A
Potassium Chloride 7447-40-7 100 0.0119 N/A
Water 7732-18-5 100 0.012 N/A
CAN-1202 Acid Wetting Agent Canyon Technical Services Surfactant 1-Methoxy-2-Propanol 107-98-2 100 0.0044 N/A
Water 7732-18-5 100 0.0044 N/A
nanoFLO 5 Canyon Technical Services Surfactant Refer to MSDS 1099 100 0.0385 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-05-03 2017-07-21 Surface Water - River 26833

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 2840 0.0 0.0 0.0
2018 8665 0.0 0.0 0.0
2019 8358 0.0 0.0 0.0
2020 1840 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-22 No Incident Encountered 0.00 0.00
2017-07-13 No Incident Encountered 0.00 0.00

For data sources see[10]

References