If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0605232804000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.226107,"lon":-117.397654,"icon":""}]} |
Location: 00/04-28-060-23W5/0 | |
Location Alias: 00/04-28-60-23 W5M | |
Location Alias 2: 00/04-28-060-23 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 5 | |
Range: 23 | |
Section: 28 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: AOSC HZ PLACID 4-28-60-23 | |
Operator Name: Athabasca Oil Corporation | |
License Number: 0441948 | |
License Date: 2011-12-22 | |
License Status: Issued | |
Spud Date: 2012-01-18 | |
Final Drill Date: 2012-02-15 | |
Well Total Depth: 4083.70 m | |
Surface Hole Latitude: 54.226107 | |
Surface Hole Longitude: -117.397654 |
Date | Event |
---|---|
2011-12-22 | Obtained License |
2012-01-18 | Lost Circulation Occurred |
2012-01-20 | Surface Casing Operation Performed |
2012-01-29 | Well Log Performed |
2012-01-30 | Direction Drilling Operation Performed - Deviate |
2012-02-04 | Direction Drilling Operation Performed - Horizontal |
2012-02-15 | Finished Drilling |
2012-02-15 | Well Mode changed to Drilled and Cased |
2012-02-18 | Perforation Treatment Performed - Open-Hole Completion |
2012-02-18 | Production Casing Operation Performed |
2012-02-19 | Rig Released |
2012-03-11 | Well Began Production |
2012-03-11 | Well Fluid changed to Gas |
2012-03-11 | Well Mode changed to Flowing |
2012-03-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-15 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-18 | Patterson-UTI Drilling Co. Canada | 53 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-30 | 2433.60 | Deviate (5 - 79 degrees) |
2012-02-04 | 2828.60 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-18 | Open Hole/Barefoot Completion | 4080.00 | 4083.70 | 0 |
2012-03-14 | Multi-Stage Fracture | 3396.00 | 3396.10 | 0 |
2012-03-14 | Multi-Stage Fracture | 3311.40 | 3311.50 | 0 |
2012-03-14 | Multi-Stage Fracture | 3227.40 | 3227.50 | 0 |
2012-03-15 | Multi-Stage Fracture | 3155.90 | 3156.00 | 0 |
2012-03-15 | Multi-Stage Fracture | 3083.80 | 3083.90 | 0 |
2012-03-15 | Multi-Stage Fracture | 3000.40 | 3000.50 | 0 |
2012-03-15 | Multi-Stage Fracture | 2928.70 | 2928.80 | 0 |
2012-03-12 | Multi-Stage Fracture | 4060.00 | 4060.10 | 0 |
2012-03-12 | Multi-Stage Fracture | 3987.40 | 3987.50 | 0 |
2012-03-12 | Multi-Stage Fracture | 3902.70 | 3902.80 | 0 |
2012-03-13 | Multi-Stage Fracture | 3818.90 | 3819.00 | 0 |
2012-03-13 | Multi-Stage Fracture | 3734.60 | 3734.70 | 0 |
2012-03-13 | Multi-Stage Fracture | 3649.60 | 3649.70 | 0 |
2012-03-13 | Multi-Stage Fracture | 3565.40 | 3565.50 | 0 |
2012-03-14 | Multi-Stage Fracture | 3480.70 | 3480.80 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 3701 | 0.0 | 0.0 | 0.0 |
2013 | 7759 | 0.0 | 0.0 | 0.0 |
2014 | 3854 | 0.0 | 0.0 | 0.0 |
2015 | 4871 | 0.0 | 0.0 | 0.0 |
2016 | 6068 | 0.0 | 0.0 | 0.0 |
2017 | 6546 | 0.0 | 0.0 | 0.0 |
2018 | 8185 | 0.0 | 0.0 | 0.0 |
2019 | 7045 | 0.0 | 0.0 | 0.0 |
2020 | 501 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-01-18 | Lost Circulation | 62.00 | 152.00 |
2012-04-02 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]