If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0605232501000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.208868,"lon":-117.304251,"icon":""}]} |
Location: 00/01-25-060-23W5/0 | |
Location Alias: 00/01-25-60-23 W5M | |
Location Alias 2: 00/01-25-060-23 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 5 | |
Range: 23 | |
Section: 25 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: MAPAN ENERGY BIGSTONE 1-25-60-23 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0227533 | |
License Date: 1999-10-15 | |
License Status: Suspension | |
Spud Date: 1999-10-24 | |
Final Drill Date: 1999-11-16 | |
Well Total Depth: 2619.00 m | |
Surface Hole Latitude: 54.208868 | |
Surface Hole Longitude: -117.304251 |
Date | Event |
---|---|
1999-10-15 | Obtained License |
1999-10-27 | Surface Casing Operation Performed |
1999-10-29 | Direction Drilling Operation Performed - Deviate |
1999-11-16 | Finished Drilling |
1999-11-16 | Well Log Performed |
1999-11-17 | Well Log Performed |
1999-11-18 | Well Log Performed |
1999-11-19 | Production Casing Operation Performed |
1999-11-20 | Rig Released |
1999-11-20 | Well Mode changed to Drilled and Cased |
1999-12-01 | Perforation Treatment Performed - Jet Perforation |
1999-12-01 | Well Log Performed |
1999-12-03 | Perforation Treatment Performed - Fractured |
1999-12-07 | Perforation Treatment Performed - Jet Perforation |
1999-12-07 | Well Log Performed |
1999-12-08 | Perforation Treatment Performed - Fractured |
1999-12-11 | Perforation Treatment Performed - Jet Perforation |
1999-12-11 | Well Log Performed |
1999-12-12 | Perforation Treatment Performed - Fractured |
1999-12-16 | Perforation Treatment Performed - Cement Squeeze |
2000-02-01 | Well Began Production |
2000-02-01 | Well Fluid changed to Gas |
2000-02-01 | Well Mode changed to Flowing |
2008-07-15 | Well Fluid changed to Gas |
2008-07-15 | Well Mode changed to Pumping |
2008-12-11 | Perforation Treatment Performed - Jet Perforation |
2009-06-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-06-27 | Plug Back Performed |
2009-06-27 | Well Fluid changed to Gas |
2009-06-27 | Well Mode changed to Abandoned Zone |
2009-06-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-06-28 | Plug Back Performed |
2009-06-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-06-29 | Perforation Treatment Performed - Jet Perforation |
2009-06-29 | Plug Back Performed |
2009-07-01 | Perforation Treatment Performed - Remedial Casing |
2009-07-02 | Perforation Treatment Performed - Jet Perforation |
2009-07-03 | Perforation Treatment Performed - Remedial Casing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1999-10-29 | 942.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-12-01 | Perforation | 2573.00 | 2575.00 | 17 |
2009-06-27 | Packing Device Capped w/Cement | 2542.00 | 2550.00 | 0 |
2009-06-28 | Packing Device Capped w/Cement | 2075.00 | 2083.00 | 0 |
2009-06-29 | Packing Device Capped w/Cement | 1728.00 | 1736.00 | 0 |
2009-06-29 | Perforation | 1419.00 | 1420.00 | 10 |
2009-07-01 | Remedial Casing Cementing | 1419.00 | 1420.00 | 0 |
2009-07-02 | Perforation | 650.00 | 651.00 | 21 |
2009-07-03 | Remedial Casing Cementing | 650.00 | 651.00 | 0 |
1999-12-03 | Fracture | 2573.00 | 2575.00 | 0 |
1999-12-07 | Perforation | 2094.00 | 2096.50 | 17 |
1999-12-08 | Fracture | 2094.00 | 2096.50 | 0 |
1999-12-11 | Perforation | 1749.50 | 1756.00 | 17 |
1999-12-12 | Fracture | 1749.50 | 1756.00 | 0 |
1999-12-16 | Cement Squeeze | 2094.00 | 2096.50 | 0 |
1999-12-16 | Cement Squeeze | 1749.50 | 1756.00 | 0 |
2008-12-11 | Perforation | 2608.50 | 2610.50 | 17 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1999 | 103 | 0.0 | 0.0 | 0.0 |
2000 | 6931 | 0.0 | 0.0 | 0.0 |
2001 | 7589 | 0.0 | 0.0 | 0.0 |
2002 | 8110 | 0.0 | 0.0 | 0.0 |
2003 | 7837 | 0.0 | 0.0 | 0.0 |
2004 | 7980 | 0.0 | 0.0 | 0.0 |
2005 | 8249 | 0.0 | 0.0 | 0.0 |
2006 | 6686 | 0.0 | 0.0 | 0.0 |
2007 | 2857 | 0.0 | 0.0 | 0.0 |
2008 | 11 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2009-06-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]