X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605232101005

Well Details

Well ID: 0605232101005
Loading map...
Location: 00/01-21-060-23W5/5
Location Alias: 00/01-21-60-23 W5M
Location Alias 2: 00/01-21-060-23 W5/05
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 23
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: DELPHI PLACID 1-21-60-23
Operator Name: Delphi Energy Corp.
License Number: 0386650
License Date: 2007-12-04
License Status: Amended
Spud Date: 2008-01-03
Final Drill Date: 2008-01-14
Well Total Depth: 2623.00 m
Surface Hole Latitude: 54.198950
Surface Hole Longitude: -117.381260

For data sources see[1][2]

Well History

Date Event
2007-12-04 Obtained License
2008-01-05 Surface Casing Operation Performed
2008-01-14 Finished Drilling
2008-01-14 Well Mode changed to Drilled and Cased
2008-01-16 Well Log Performed
2008-01-18 Production Casing Operation Performed
2008-01-18 Rig Released
2008-01-24 Perforation Treatment Performed - Jet Perforation
2008-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-01-25 Perforation Treatment Performed - Jet Perforation
2008-01-25 Plug Back Performed
2008-01-28 Perforation Treatment Performed - Fractured
2008-01-31 Perforation Treatment Performed - Jet Perforation
2008-02-01 Well Structure changed to Commingled
2008-02-02 Perforation Treatment Performed - Fractured
2008-02-04 Perforation Treatment Performed - Jet Perforation
2008-02-05 Perforation Treatment Performed - Fractured
2008-02-07 Perforation Treatment Performed - Jet Perforation
2008-02-10 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-01-24 Perforation 2561.00 2567.00 17
2008-02-10 Fracture 2048.00 2050.00 0
2008-01-25 Packing Device Capped w/Cement 2542.00 2550.00 0
2008-01-25 Perforation 2465.00 2472.00 17
2008-01-28 Fracture 2465.00 2472.00 0
2008-01-31 Perforation 2391.00 2395.00 17
2008-02-02 Fracture 2391.00 2395.00 0
2008-02-04 Perforation 2187.00 2189.00 17
2008-02-05 Fracture 2187.00 2189.00 0
2008-02-07 Perforation 2048.00 2050.00 17

For data sources see[4]



References