If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0605231614003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.194901,"lon":-117.394735,"icon":""}]} |
| Location: 00/14-16-060-23W5/3 | |
| Location Alias: 00/14-16-60-23 W5M | |
| Location Alias 2: 00/14-16-060-23 W5/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 060 | |
| Meridian: 5 | |
| Range: 23 | |
| Section: 16 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: DELPHI PLACID 14-16-60-23 | |
| Operator Name: Delphi Energy Corp. | |
| License Number: 0195537 | |
| License Date: 1996-12-18 | |
| License Status: Issued | |
| Spud Date: 1997-01-01 | |
| Final Drill Date: 1997-01-16 | |
| Well Total Depth: 2767.00 m | |
| Surface Hole Latitude: 54.194901 | |
| Surface Hole Longitude: -117.394735 |
| Date | Event |
|---|---|
| 1996-12-18 | Obtained License |
| 1997-01-02 | Surface Casing Operation Performed |
| 1997-01-14 | Well Log Performed |
| 1997-01-16 | Finished Drilling |
| 1997-01-16 | Well Mode changed to Drilled and Cased |
| 1997-01-18 | Production Casing Operation Performed |
| 1997-01-19 | Rig Released |
| 1997-02-08 | Perforation Treatment Performed - Jet Perforation |
| 1997-02-10 | Perforation Treatment Performed - Fractured |
| 1997-02-14 | Perforation Treatment Performed - Jet Perforation |
| 1997-02-15 | Perforation Treatment Performed - Fractured |
| 1997-02-21 | Perforation Treatment Performed - Jet Perforation |
| 1997-02-22 | Perforation Treatment Performed - Fractured |
| 1998-01-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1998-01-31 | Plug Back Performed |
| 1998-02-01 | Perforation Treatment Performed - Jet Perforation |
| 1998-02-01 | Well Mode changed to Drilled and Cased |
| 1998-02-05 | Perforation Treatment Performed - Fractured |
| 2006-01-01 | Well Began Production |
| 2006-01-01 | Well Fluid changed to Gas |
| 2006-01-01 | Well Mode changed to Flowing |
| 2007-02-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2007-02-24 | Plug Back Performed |
| 2007-02-25 | Perforation Treatment Performed - Jet Perforation |
| 2007-02-27 | Perforation Treatment Performed - Fractured |
| 2007-03-06 | Perforation Treatment Performed - Jet Perforation |
| 2007-03-07 | Perforation Treatment Performed - Fractured |
| 2007-11-01 | Well Fluid changed to Gas |
| 2007-11-01 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1997-02-08 | Perforation | 2684.00 | 2692.00 | 20 |
| 1998-02-05 | Fracture | 2187.00 | 2197.00 | 0 |
| 2007-02-24 | Packing Device Capped w/Cement | 2546.00 | 2554.00 | 0 |
| 2007-02-25 | Perforation | 2535.00 | 2543.00 | 17 |
| 2007-02-27 | Fracture | 2535.00 | 2543.00 | 0 |
| 2007-03-06 | Perforation | 2050.00 | 2056.00 | 17 |
| 2007-03-07 | Fracture | 2050.00 | 2056.00 | 0 |
| 1997-02-10 | Fracture | 2684.00 | 2692.00 | 0 |
| 1997-02-14 | Perforation | 2656.00 | 2664.00 | 20 |
| 1997-02-15 | Fracture | 2656.00 | 2664.00 | 0 |
| 1997-02-21 | Perforation | 2575.00 | 2587.00 | 20 |
| 1997-02-22 | Fracture | 2575.00 | 2587.00 | 0 |
| 1998-01-31 | Packing Device Capped w/Cement | 2636.00 | 2644.00 | 0 |
| 1998-02-01 | Perforation | 2187.00 | 2190.00 | 17 |
| 1998-02-01 | Perforation | 2194.00 | 2197.00 | 17 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2006 | 6622 | 0.0 | 0.0 | 0.0 |
| 2007 | 6727 | 0.0 | 0.0 | 0.0 |
| 2008 | 8690 | 0.0 | 0.0 | 0.0 |
| 2009 | 8759 | 0.0 | 0.0 | 0.0 |
| 2010 | 8759 | 0.0 | 0.0 | 0.0 |
| 2011 | 8687 | 0.0 | 0.0 | 0.0 |
| 2012 | 8783 | 0.0 | 0.0 | 0.0 |
| 2013 | 8606 | 0.0 | 0.0 | 0.0 |
| 2014 | 8433 | 0.0 | 0.0 | 0.0 |
| 2015 | 8016 | 0.0 | 0.0 | 0.0 |
| 2016 | 7080 | 0.0 | 0.0 | 0.0 |
| 2017 | 8735 | 0.0 | 0.0 | 0.0 |
| 2018 | 8615 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]