If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0605230915000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.150089,"lon":-117.383696,"icon":""}]} |
| Location: 00/15-09-060-23W5/0 | |
| Location Alias: 00/15-09-60-23 W5M | |
| Location Alias 2: 00/15-09-060-23 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 060 | |
| Meridian: 5 | |
| Range: 23 | |
| Section: 09 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: DELPHI HZ PLACID 15-9-60-23 | |
| Operator Name: Delphi Energy Corp. | |
| License Number: 0482042 | |
| License Date: 2016-12-20 | |
| License Status: Issued | |
| Spud Date: 2017-02-03 | |
| Final Drill Date: 2017-03-04 | |
| Well Total Depth: 5912.00 m | |
| Surface Hole Latitude: 54.150089 | |
| Surface Hole Longitude: -117.383696 |
| Date | Event |
|---|---|
| 2016-12-20 | Obtained License |
| 2017-02-06 | Surface Casing Operation Performed |
| 2017-02-09 | Direction Drilling Operation Performed - Deviate |
| 2017-02-16 | Direction Drilling Operation Performed - Horizontal |
| 2017-02-19 | Intermediate Casing Operation Performed |
| 2017-03-01 | Well Log Performed |
| 2017-03-04 | Finished Drilling |
| 2017-03-04 | Well Mode changed to Drilled and Cased |
| 2017-03-07 | Liner Casing Operation Performed |
| 2017-03-08 | Rig Released |
| 2017-06-06 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-06-21 | Well Began Production |
| 2017-06-21 | Well Fluid changed to Gas |
| 2017-06-21 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2017-02-03 | Ensign Drilling Inc. | 225 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2017-02-09 | 2124.60 | Deviate (5 - 79 degrees) |
| 2017-02-16 | 3009.10 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2017-06-06 | Multi-Stage Fracture | 5862.80 | 5862.90 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 5230.00 | 5230.10 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 5149.40 | 5149.50 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 5079.50 | 5079.60 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 5009.40 | 5009.50 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 4939.60 | 4939.70 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 4858.20 | 4858.30 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 4787.60 | 4787.70 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 4717.60 | 4717.70 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 4646.70 | 4646.80 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 4576.90 | 4577.00 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 5802.20 | 5802.30 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 4495.80 | 4495.90 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 4425.50 | 4425.60 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 4355.60 | 4355.70 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 4285.70 | 4285.80 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 4204.00 | 4204.10 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 4134.10 | 4134.20 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 4064.10 | 4064.20 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 3994.40 | 3994.50 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 3925.10 | 3925.20 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 3843.70 | 3843.80 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 5732.50 | 5732.60 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 3771.50 | 3771.60 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 3699.30 | 3699.40 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 3627.10 | 3627.20 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 3554.90 | 3555.00 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 3483.00 | 3483.10 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 3410.90 | 3411.00 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 3338.80 | 3338.90 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 3268.50 | 3268.60 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 3197.10 | 3197.20 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 3137.10 | 3137.20 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 5662.40 | 5662.50 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 3088.10 | 3088.20 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 5592.20 | 5592.30 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 5510.90 | 5511.00 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 5441.10 | 5441.20 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 5371.20 | 5371.30 | 0 |
| 2017-06-06 | Multi-Stage Fracture | 5300.40 | 5300.50 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-06-06 | 2017-06-06 | 2,848 | 12,007 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | N2 | 7727-37-9 | 100 | 1.372 | N/A | |||
| water | Not Available | 100 | 77.4247 | N/A | ||||
| Prime Plus 30/50 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 4.2296 | N/A | ||
| silica crystalline | 14808-60-7 | 100 | 4.2296 | N/A | ||||
| Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 5.3659 | N/A | ||
| Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 6.6309 | N/A | ||
| Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 5.2934 | N/A | ||
| CC-8 | Trican | Clay Control | choline chloride | 67-48-1 | 100 | 0.0851 | N/A | |
| non-hazardous ingredients | Not Available | 100 | 0.0851 | N/A | ||||
| TriVert 1000 | Trican | Diverting Agent | non-hazardous ingredients | Not Available | 100 | 0.0062 | N/A | |
| FR-16 | Trican | Friction Reducer | distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0812 | N/A | |
| non-hazardous ingredients | Not Available | 100 | 0.0812 | N/A | ||||
| poly(oxy-1.2-ethanediyl). alpha-tridecyl-omega-hydroxy-. branched |
69011-36-5 | 100 | 0.0812 | N/A | ||||
| S-17W | Trican | Surfactant | ethylene/propylene oxide polymer | Not Available | 100 | 0.0124 | N/A | |
| methanol | 67-56-1 | 100 | 0.0124 | N/A | ||||
| water | Not Available | 100 | 0.0124 | N/A | ||||
| SS-5 | Trican | Surfactant | aliphatic alcohol | 8985 | 100 | 0.037 | N/A | |
| aminofunctional polymer | 8985 | 100 | 0.037 | N/A | ||||
| distillates (petroleum). sweet medium | 64741-86-2 | 100 | 0.037 | N/A | ||||
| isopropanol | 67-63-0 | 100 | 0.037 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2017-06-26 | 2017-06-26 | Surface Water - River | 12007 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 4848 | 0.0 | 0.0 | 0.0 |
| 2018 | 8591 | 0.0 | 0.0 | 0.0 |
| 2019 | 8687 | 0.0 | 0.0 | 0.0 |
| 2020 | 1943 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-03-08 | No Incident Encountered | 0.00 | 0.00 |
| 2017-06-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]