X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605230915000

Well Details

Well ID: 0605230915000
Loading map...
Location: 00/15-09-060-23W5/0
Location Alias: 00/15-09-60-23 W5M
Location Alias 2: 00/15-09-060-23 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 23
Section: 09
County/Municipality: Municipal District of Greenview No. 16
Well Name: DELPHI HZ PLACID 15-9-60-23
Operator Name: Delphi Energy Corp.
License Number: 0482042
License Date: 2016-12-20
License Status: Issued
Spud Date: 2017-02-03
Final Drill Date: 2017-03-04
Well Total Depth: 5912.00 m
Surface Hole Latitude: 54.150089
Surface Hole Longitude: -117.383696

For data sources see[1][2]

Well History

Date Event
2016-12-20 Obtained License
2017-02-06 Surface Casing Operation Performed
2017-02-09 Direction Drilling Operation Performed - Deviate
2017-02-16 Direction Drilling Operation Performed - Horizontal
2017-02-19 Intermediate Casing Operation Performed
2017-03-01 Well Log Performed
2017-03-04 Finished Drilling
2017-03-04 Well Mode changed to Drilled and Cased
2017-03-07 Liner Casing Operation Performed
2017-03-08 Rig Released
2017-06-06 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-21 Well Began Production
2017-06-21 Well Fluid changed to Gas
2017-06-21 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-02-03 Ensign Drilling Inc. 225 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-02-09 2124.60 Deviate (5 - 79 degrees)
2017-02-16 3009.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-06-06 Multi-Stage Fracture 5862.80 5862.90 0
2017-06-06 Multi-Stage Fracture 5230.00 5230.10 0
2017-06-06 Multi-Stage Fracture 5149.40 5149.50 0
2017-06-06 Multi-Stage Fracture 5079.50 5079.60 0
2017-06-06 Multi-Stage Fracture 5009.40 5009.50 0
2017-06-06 Multi-Stage Fracture 4939.60 4939.70 0
2017-06-06 Multi-Stage Fracture 4858.20 4858.30 0
2017-06-06 Multi-Stage Fracture 4787.60 4787.70 0
2017-06-06 Multi-Stage Fracture 4717.60 4717.70 0
2017-06-06 Multi-Stage Fracture 4646.70 4646.80 0
2017-06-06 Multi-Stage Fracture 4576.90 4577.00 0
2017-06-06 Multi-Stage Fracture 5802.20 5802.30 0
2017-06-06 Multi-Stage Fracture 4495.80 4495.90 0
2017-06-06 Multi-Stage Fracture 4425.50 4425.60 0
2017-06-06 Multi-Stage Fracture 4355.60 4355.70 0
2017-06-06 Multi-Stage Fracture 4285.70 4285.80 0
2017-06-06 Multi-Stage Fracture 4204.00 4204.10 0
2017-06-06 Multi-Stage Fracture 4134.10 4134.20 0
2017-06-06 Multi-Stage Fracture 4064.10 4064.20 0
2017-06-06 Multi-Stage Fracture 3994.40 3994.50 0
2017-06-06 Multi-Stage Fracture 3925.10 3925.20 0
2017-06-06 Multi-Stage Fracture 3843.70 3843.80 0
2017-06-06 Multi-Stage Fracture 5732.50 5732.60 0
2017-06-06 Multi-Stage Fracture 3771.50 3771.60 0
2017-06-06 Multi-Stage Fracture 3699.30 3699.40 0
2017-06-06 Multi-Stage Fracture 3627.10 3627.20 0
2017-06-06 Multi-Stage Fracture 3554.90 3555.00 0
2017-06-06 Multi-Stage Fracture 3483.00 3483.10 0
2017-06-06 Multi-Stage Fracture 3410.90 3411.00 0
2017-06-06 Multi-Stage Fracture 3338.80 3338.90 0
2017-06-06 Multi-Stage Fracture 3268.50 3268.60 0
2017-06-06 Multi-Stage Fracture 3197.10 3197.20 0
2017-06-06 Multi-Stage Fracture 3137.10 3137.20 0
2017-06-06 Multi-Stage Fracture 5662.40 5662.50 0
2017-06-06 Multi-Stage Fracture 3088.10 3088.20 0
2017-06-06 Multi-Stage Fracture 5592.20 5592.30 0
2017-06-06 Multi-Stage Fracture 5510.90 5511.00 0
2017-06-06 Multi-Stage Fracture 5441.10 5441.20 0
2017-06-06 Multi-Stage Fracture 5371.20 5371.30 0
2017-06-06 Multi-Stage Fracture 5300.40 5300.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-06-06 2017-06-06 2,848 12,007 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 1.372 N/A
water Not Available 100 77.4247 N/A
Prime Plus 30/50 Trican hexamethylenetetramine 100-97-0 100 4.2296 N/A
silica crystalline 14808-60-7 100 4.2296 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 5.3659 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 6.6309 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 5.2934 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.0851 N/A
non-hazardous ingredients Not Available 100 0.0851 N/A
TriVert 1000 Trican Diverting Agent non-hazardous ingredients Not Available 100 0.0062 N/A
FR-16 Trican Friction Reducer distillates (petroleum). hydrotreated light 64742-47-8 100 0.0812 N/A
non-hazardous ingredients Not Available 100 0.0812 N/A
poly(oxy-1.2-ethanediyl). alpha-tridecyl-omega-hydroxy-.
branched
69011-36-5 100 0.0812 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0124 N/A
methanol 67-56-1 100 0.0124 N/A
water Not Available 100 0.0124 N/A
SS-5 Trican Surfactant aliphatic alcohol 8985 100 0.037 N/A
aminofunctional polymer 8985 100 0.037 N/A
distillates (petroleum). sweet medium 64741-86-2 100 0.037 N/A
isopropanol 67-63-0 100 0.037 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-06-26 2017-06-26 Surface Water - River 12007

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 4848 0.0 0.0 0.0
2018 8591 0.0 0.0 0.0
2019 8687 0.0 0.0 0.0
2020 1943 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-08 No Incident Encountered 0.00 0.00
2017-06-26 No Incident Encountered 0.00 0.00

For data sources see[10]

References