If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0605223215000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.210966,"lon":-117.265521,"icon":""}]} |
| Location: 00/15-32-060-22W5/0 | |
| Location Alias: 00/15-32-60-22 W5M | |
| Location Alias 2: 00/15-32-060-22 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 060 | |
| Meridian: 5 | |
| Range: 22 | |
| Section: 32 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: DELPHI BIGSTONE 15-32-60-22 | |
| Operator Name: Delphi Energy Corp. | |
| License Number: 0439284 | |
| License Date: 2011-11-21 | |
| License Status: Issued | |
| Spud Date: 2011-11-27 | |
| Final Drill Date: 2011-12-30 | |
| Well Total Depth: 5512.00 m | |
| Surface Hole Latitude: 54.210966 | |
| Surface Hole Longitude: -117.265521 |
| Date | Event |
|---|---|
| 2011-11-21 | Obtained License |
| 2011-12-01 | Surface Casing Operation Performed |
| 2011-12-07 | Direction Drilling Operation Performed - Horizontal |
| 2011-12-13 | Intermediate Casing Operation Performed |
| 2011-12-29 | Well Log Performed |
| 2011-12-30 | Finished Drilling |
| 2011-12-30 | Well Mode changed to Drilled and Cased |
| 2012-01-02 | Liner Casing Operation Performed |
| 2012-01-04 | Rig Released |
| 2012-01-13 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-01-14 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-01-15 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-01-16 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-01-19 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-07-01 | Well Began Production |
| 2012-07-01 | Well Fluid changed to Gas |
| 2012-07-01 | Well Mode changed to Flowing |
| 2015-02-26 | Well Log Performed |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-12-07 | 2252.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-01-13 | Multi-Stage Fracture | 5454.00 | 5455.00 | 0 |
| 2012-01-16 | Multi-Stage Fracture | 4534.10 | 4534.90 | 0 |
| 2012-01-16 | Multi-Stage Fracture | 4397.70 | 4398.50 | 0 |
| 2012-01-16 | Multi-Stage Fracture | 4234.30 | 4235.10 | 0 |
| 2012-01-16 | Multi-Stage Fracture | 4152.80 | 4153.60 | 0 |
| 2012-01-16 | Multi-Stage Fracture | 3941.10 | 3941.90 | 0 |
| 2012-01-16 | Multi-Stage Fracture | 3804.20 | 3805.00 | 0 |
| 2012-01-16 | Multi-Stage Fracture | 3647.10 | 3647.90 | 0 |
| 2012-01-16 | Multi-Stage Fracture | 3547.90 | 3548.60 | 0 |
| 2012-01-19 | Multi-Stage Fracture | 3444.20 | 3445.00 | 0 |
| 2012-01-19 | Multi-Stage Fracture | 3317.90 | 3318.70 | 0 |
| 2012-01-14 | Multi-Stage Fracture | 5379.30 | 5380.10 | 0 |
| 2012-01-19 | Multi-Stage Fracture | 3245.70 | 3246.50 | 0 |
| 2012-01-19 | Multi-Stage Fracture | 3096.70 | 3097.50 | 0 |
| 2012-01-19 | Multi-Stage Fracture | 2947.40 | 2948.20 | 0 |
| 2012-01-19 | Multi-Stage Fracture | 2807.80 | 2808.50 | 0 |
| 2012-01-15 | Multi-Stage Fracture | 5319.00 | 5319.80 | 0 |
| 2012-01-15 | Multi-Stage Fracture | 5237.80 | 5238.60 | 0 |
| 2012-01-15 | Multi-Stage Fracture | 5111.50 | 5112.30 | 0 |
| 2012-01-16 | Multi-Stage Fracture | 5017.40 | 5018.20 | 0 |
| 2012-01-16 | Multi-Stage Fracture | 4901.80 | 4902.60 | 0 |
| 2012-01-16 | Multi-Stage Fracture | 4753.10 | 4753.90 | 0 |
| 2012-01-16 | Multi-Stage Fracture | 4617.10 | 4617.90 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 3405 | 0.0 | 0.0 | 0.0 |
| 2013 | 4013 | 0.0 | 0.0 | 0.0 |
| 2014 | 1549 | 0.0 | 0.0 | 0.0 |
| 2015 | 96 | 0.0 | 0.0 | 0.0 |
| 2016 | 408 | 0.0 | 0.0 | 0.0 |
| 2017 | 4032 | 0.0 | 0.0 | 0.0 |
| 2018 | 4392 | 0.0 | 0.0 | 0.0 |
| 2019 | 1632 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-02-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]