If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0605222502002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.212418,"lon":-117.16099,"icon":""}]} |
| Location: 00/02-25-060-22W5/2 | |
| Location Alias: 00/02-25-60-22 W5M | |
| Location Alias 2: 00/02-25-060-22 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 060 | |
| Meridian: 5 | |
| Range: 22 | |
| Section: 25 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: ACL FIR 2-25-60-22 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0023446 | |
| License Date: 1962-12-04 | |
| License Status: Issued | |
| Spud Date: 1962-12-15 | |
| Final Drill Date: 1963-03-09 | |
| Well Total Depth: 3444.20 m | |
| Surface Hole Latitude: 54.212418 | |
| Surface Hole Longitude: -117.160990 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1962-12-04 | Obtained License |
| 1963-03-09 | Finished Drilling |
| 1963-03-09 | Well Mode changed to Drilled and Cased |
| 1963-03-10 | Production Casing Operation Performed |
| 1963-08-06 | Perforation Treatment Performed - Fractured |
| 1963-08-06 | Perforation Treatment Performed - Jet Perforation |
| 1963-08-09 | Perforation Treatment Performed - Cement Squeeze |
| 1963-08-24 | Perforation Treatment Performed - Bullet Perforation |
| 1963-08-26 | Perforation Treatment Performed - Cement Squeeze |
| 1963-09-22 | Perforation Treatment Performed - Bullet Perforation |
| 1963-09-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1963-09-27 | Perforation Treatment Performed - Cement Squeeze |
| 1964-12-03 | Perforation Treatment Performed - Jet Perforation |
| 1968-03-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1968-11-04 | Perforation Treatment Performed - Condensate Squeeze |
| 1969-03-24 | Perforation Treatment Performed - Condensate Squeeze |
| 1977-06-07 | Perforation Treatment Performed - Condensate Squeeze |
| 1984-06-26 | Well Log Performed |
| 1984-07-12 | Well Log Performed |
| 1984-07-15 | Well Log Performed |
| 1987-10-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1996-09-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1996-09-29 | Plug Back Performed |
| 1996-10-03 | Perforation Treatment Performed - Jet Perforation |
| 1996-10-06 | Perforation Treatment Performed - Jet Perforation |
| 1996-10-07 | Perforation Treatment Performed - Fractured |
| 1996-10-29 | Well Began Production |
| 1996-10-29 | Well Fluid changed to Gas |
| 1996-10-29 | Well Mode changed to Flowing |
| 1996-10-30 | Well Fluid changed to Gas |
| 1996-10-30 | Well Mode changed to Flowing |
| 2011-12-01 | Well Fluid changed to Gas |
| 2011-12-01 | Well Mode changed to Pumping |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1963-08-06 | Perforation | 3416.20 | 3417.70 | 13 |
| 1968-03-20 | Acid Treatment | 3354.60 | 3368.60 | 0 |
| 1968-11-04 | Condensate Squeeze | 3354.60 | 3368.60 | 0 |
| 1969-03-24 | Condensate Squeeze | 3354.60 | 3368.60 | 0 |
| 1977-06-07 | Condensate Squeeze | 3354.60 | 3368.60 | 0 |
| 1987-10-01 | Acid Treatment | 3354.60 | 3368.60 | 0 |
| 1996-09-29 | Packing Device Capped w/Cement | 2944.00 | 2952.00 | 0 |
| 1996-10-03 | Perforation | 1958.00 | 1965.00 | 17 |
| 1996-10-06 | Perforation | 1951.00 | 1958.00 | 17 |
| 1996-10-07 | Fracture | 1951.00 | 1958.00 | 0 |
| 1963-08-06 | Fracture | 3416.20 | 3417.70 | 0 |
| 1963-08-09 | Cement Squeeze | 3416.20 | 3417.70 | 0 |
| 1963-08-24 | Bullet Perforation | 1956.20 | 1958.00 | 13 |
| 1963-08-26 | Cement Squeeze | 1956.20 | 1958.00 | 0 |
| 1963-09-22 | Bullet Perforation | 3167.50 | 3171.70 | 13 |
| 1963-09-23 | Acid Treatment | 3167.50 | 3171.70 | 0 |
| 1963-09-27 | Cement Squeeze | 3167.50 | 3171.70 | 0 |
| 1964-12-03 | Perforation | 3354.60 | 3368.60 | 3 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1996 | 1488 | 0.0 | 0.0 | 0.0 |
| 1997 | 8078 | 0.0 | 0.0 | 0.0 |
| 1998 | 7301 | 0.0 | 0.0 | 0.0 |
| 1999 | 8222 | 0.0 | 0.0 | 0.0 |
| 2000 | 7994 | 0.0 | 0.0 | 0.0 |
| 2001 | 7392 | 0.0 | 0.0 | 0.0 |
| 2002 | 8595 | 0.0 | 0.0 | 0.0 |
| 2003 | 8369 | 0.0 | 0.0 | 0.0 |
| 2004 | 7907 | 0.0 | 0.0 | 0.0 |
| 2005 | 8711 | 0.0 | 0.0 | 0.0 |
| 2006 | 8708 | 0.0 | 0.0 | 0.0 |
| 2007 | 8711 | 0.0 | 0.0 | 0.0 |
| 2008 | 8735 | 0.0 | 0.0 | 0.0 |
| 2009 | 7943 | 0.0 | 0.0 | 0.0 |
| 2010 | 8615 | 0.0 | 0.0 | 0.0 |
| 2011 | 8556 | 0.0 | 0.0 | 0.0 |
| 2012 | 8738 | 0.0 | 0.0 | 0.0 |
| 2013 | 8090 | 0.0 | 0.0 | 0.0 |
| 2014 | 8601 | 0.0 | 0.0 | 0.0 |
| 2015 | 8604 | 0.0 | 0.0 | 0.0 |
| 2016 | 2512 | 0.0 | 0.0 | 0.0 |
| 2017 | 5658 | 0.0 | 0.0 | 0.0 |
| 2018 | 7751 | 0.0 | 0.0 | 0.0 |
| 2019 | 8473 | 0.0 | 0.0 | 0.0 |
| 2020 | 985 | 0.0 | 0.0 | 0.0 |
For data sources see[5]