If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0605201215000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.165173,"lon":-116.849892,"icon":""}]} |
Location: 00/15-12-060-20W5/0 | |
Location Alias: 00/15-12-60-20 W5M | |
Location Alias 2: 00/15-12-060-20 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 5 | |
Range: 20 | |
Section: 12 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TRILOGY HZ KAYBOBS 15-12-60-20 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0443090 | |
License Date: 2012-01-19 | |
License Status: Issued | |
Spud Date: 2012-01-30 | |
Final Drill Date: 2012-02-19 | |
Well Total Depth: 4273.00 m | |
Surface Hole Latitude: 54.165173 | |
Surface Hole Longitude: -116.849892 |
Date | Event |
---|---|
2012-01-19 | Obtained License |
2012-01-30 | Lost Circulation Occurred |
2012-01-31 | Lost Circulation Occurred |
2012-02-01 | Lost Circulation Occurred |
2012-02-01 | Surface Casing Operation Performed |
2012-02-10 | Direction Drilling Operation Performed - Horizontal |
2012-02-12 | Intermediate Casing Operation Performed |
2012-02-19 | Finished Drilling |
2012-02-19 | Well Mode changed to Drilled and Cased |
2012-02-23 | Rig Released |
2012-02-24 | Well Log Performed |
2012-03-06 | Well Log Performed |
2012-03-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-09 | Perforation Treatment Performed - Open-Hole Completion |
2012-03-15 | Well Log Performed |
2012-03-16 | Well Log Performed |
2012-03-27 | Well Began Production |
2012-03-27 | Well Fluid changed to Gas |
2012-03-27 | Well Mode changed to Flowing |
2019-03-16 | Well Fluid changed to Gas |
2019-03-16 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-30 | Precision Drilling Corporation | 252E | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-10 | 2535.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-03-09 | Open Hole/Barefoot Completion | 4268.80 | 4273.00 | 0 |
2012-03-09 | Multi-Stage Fracture | 3531.90 | 3624.30 | 0 |
2012-03-09 | Multi-Stage Fracture | 3423.20 | 3531.80 | 0 |
2012-03-09 | Multi-Stage Fracture | 3325.70 | 3423.10 | 0 |
2012-03-09 | Multi-Stage Fracture | 3227.80 | 3325.60 | 0 |
2012-03-09 | Multi-Stage Fracture | 3129.80 | 3227.70 | 0 |
2012-03-09 | Multi-Stage Fracture | 3020.90 | 3129.70 | 0 |
2012-03-09 | Multi-Stage Fracture | 2922.40 | 3020.80 | 0 |
2012-03-09 | Multi-Stage Fracture | 2822.70 | 2922.30 | 0 |
2012-03-09 | Multi-Stage Fracture | 2725.40 | 2822.60 | 0 |
2012-03-09 | Multi-Stage Fracture | 2652.30 | 2725.30 | 0 |
2012-03-09 | Multi-Stage Fracture | 4246.50 | 4273.00 | 0 |
2012-03-09 | Multi-Stage Fracture | 4198.90 | 4246.40 | 0 |
2012-03-09 | Multi-Stage Fracture | 4116.70 | 4198.80 | 0 |
2012-03-09 | Multi-Stage Fracture | 4032.20 | 4116.60 | 0 |
2012-03-09 | Multi-Stage Fracture | 3929.80 | 4032.10 | 0 |
2012-03-09 | Multi-Stage Fracture | 3830.00 | 3929.70 | 0 |
2012-03-09 | Multi-Stage Fracture | 3733.60 | 3829.90 | 0 |
2012-03-09 | Multi-Stage Fracture | 3624.40 | 3733.50 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6672 | 0.0 | 0.0 | 0.0 |
2013 | 8711 | 0.0 | 0.0 | 0.0 |
2014 | 8447 | 0.0 | 0.0 | 0.0 |
2015 | 5519 | 0.0 | 0.0 | 0.0 |
2016 | 8447 | 0.0 | 0.0 | 0.0 |
2017 | 7680 | 0.0 | 0.0 | 0.0 |
2018 | 8423 | 0.0 | 0.0 | 0.0 |
2019 | 8231 | 0.0 | 0.0 | 0.0 |
2020 | 1679 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-01-30 | Lost Circulation | 160.00 | 160.00 |
2012-01-31 | Lost Circulation | 350.00 | 350.00 |
2012-02-01 | Lost Circulation | 474.00 | 474.00 |
2012-03-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]