X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605201104002

Well Details

Well ID: 0605201104002
Loading map...
Location: 00/04-11-060-20W5/2
Location Alias: 00/04-11-60-20 W5M
Location Alias 2: 00/04-11-060-20 W5/02
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 20
Section: 11
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY HZ KAYBOBS 4-11-60-20
Operator Name: Paramount Resources Ltd.
License Number: 0415762
License Date: 2009-12-17
License Status: Amended
Spud Date: 2010-01-12
Final Drill Date: 2010-03-03
Well Total Depth: 4017.00 m
Surface Hole Latitude: 54.165236
Surface Hole Longitude: -116.871115

For data sources see[1][2]

Well History

Date Event
2009-12-17 Obtained License
2010-02-13 Direction Drilling Operation Performed - Horizontal
2010-02-22 Intermediate Casing Operation Performed
2010-03-03 Finished Drilling
2010-03-03 Well Log Performed
2010-03-03 Well Mode changed to Drilled and Cased
2010-03-08 Rig Released
2010-03-14 Liner Casing Operation Performed
2010-03-14 Well Log Performed
2010-03-21 Perforation Treatment Performed - Multi-Stage Fracture
2010-03-21 Perforation Treatment Performed - Open-Hole Completion
2010-04-11 Well Began Production
2010-04-11 Well Fluid changed to Gas
2010-04-11 Well Mode changed to Flowing
2010-07-06 Well Log Performed
2017-01-11 Well Fluid changed to Gas
2017-01-11 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-02-13 1989.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-03-21 Open Hole/Barefoot Completion 4013.00 4017.00 0
2010-03-21 Multi-Stage Fracture 3228.70 3228.80 0
2010-03-21 Multi-Stage Fracture 3138.80 3138.90 0
2010-03-21 Multi-Stage Fracture 3048.00 3048.10 0
2010-03-21 Multi-Stage Fracture 2946.90 2947.00 0
2010-03-21 Multi-Stage Fracture 2857.00 2857.10 0
2010-03-21 Multi-Stage Fracture 2767.00 2767.10 0
2010-03-21 Multi-Stage Fracture 2690.30 2690.40 0
2010-03-21 Multi-Stage Fracture 3992.00 3992.10 0
2010-03-21 Multi-Stage Fracture 3922.70 3922.80 0
2010-03-21 Multi-Stage Fracture 3820.20 3820.30 0
2010-03-21 Multi-Stage Fracture 3716.60 3716.70 0
2010-03-21 Multi-Stage Fracture 3601.60 3601.70 0
2010-03-21 Multi-Stage Fracture 3499.00 3499.10 0
2010-03-21 Multi-Stage Fracture 3409.90 3410.00 0
2010-03-21 Multi-Stage Fracture 3318.90 3319.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 6144 0.0 0.0 0.0
2011 5328 0.0 0.0 0.0
2012 8567 0.0 0.0 0.0
2013 8063 0.0 0.0 0.0
2014 8088 0.0 0.0 0.0
2015 4728 0.0 0.0 0.0
2016 4752 0.0 0.0 0.0
2017 8447 0.0 0.0 0.0
2018 8495 0.0 0.0 0.0
2019 7775 0.0 0.0 0.0
2020 2112 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-07-10 No Incident Encountered 0.00 0.00
2016-03-27 No Incident Encountered 0.00 0.00

For data sources see[7]

References