X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605200204000

Well Details

Well ID: 0605200204000
Loading map...
Location: 00/04-02-060-20W5/0
Location Alias: 00/04-02-60-20 W5M
Location Alias 2: 00/04-02-060-20 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 20
Section: 02
County/Municipality: Municipal District of Greenview No. 16
Well Name: TORC HZ KAYBOBS 4-2-60-20
Operator Name: TORC Oil & Gas Ltd.
License Number: 0446362
License Date: 2012-06-08
License Status: Issued
Spud Date: 2012-07-29
Final Drill Date: 2012-08-11
Well Total Depth: 3035.00 m
Surface Hole Latitude: 54.155377
Surface Hole Longitude: -116.875303

For data sources see[1][2]

Well History

Date Event
2012-06-08 Obtained License
2012-07-30 Surface Casing Operation Performed
2012-07-31 Well Log Performed
2012-08-02 Direction Drilling Operation Performed - Deviate
2012-08-03 Direction Drilling Operation Performed - Horizontal
2012-08-04 Intermediate Casing Operation Performed
2012-08-11 Finished Drilling
2012-08-11 Well Log Performed
2012-08-11 Well Mode changed to Drilled and Cased
2012-08-12 Liner Casing Operation Performed
2012-08-13 Rig Released
2012-08-20 Well Log Performed
2012-08-30 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-30 Perforation Treatment Performed - Open-Hole Completion
2012-09-19 Well Began Production
2012-09-19 Well Fluid changed to Crude Oil
2012-09-19 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-07-29 Saxon Drilling Canada Limited Partnership 155 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-08-02 1367.00 Deviate (5 - 79 degrees)
2012-08-03 1679.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-30 Open Hole/Barefoot Completion 3012.00 3035.00 0
2012-08-30 Multi-Stage Fracture 2496.20 2496.30 0
2012-08-30 Multi-Stage Fracture 2435.40 2435.50 0
2012-08-30 Multi-Stage Fracture 2360.80 2360.90 0
2012-08-30 Multi-Stage Fracture 2300.30 2300.40 0
2012-08-30 Multi-Stage Fracture 2241.00 2241.10 0
2012-08-30 Multi-Stage Fracture 2181.10 2181.20 0
2012-08-30 Multi-Stage Fracture 2120.40 2120.50 0
2012-08-30 Multi-Stage Fracture 2048.10 2048.20 0
2012-08-30 Multi-Stage Fracture 1987.60 1987.70 0
2012-08-30 Multi-Stage Fracture 1928.20 1928.30 0
2012-08-30 Multi-Stage Fracture 2994.30 2994.40 0
2012-08-30 Multi-Stage Fracture 1866.70 1866.80 0
2012-08-30 Multi-Stage Fracture 1807.40 1807.50 0
2012-08-30 Multi-Stage Fracture 2935.30 2935.40 0
2012-08-30 Multi-Stage Fracture 2862.30 2862.40 0
2012-08-30 Multi-Stage Fracture 2800.00 2800.10 0
2012-08-30 Multi-Stage Fracture 2738.60 2738.70 0
2012-08-30 Multi-Stage Fracture 2677.20 2677.30 0
2012-08-30 Multi-Stage Fracture 2615.50 2615.60 0
2012-08-30 Multi-Stage Fracture 2555.20 2555.30 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2257 0.0 0.0 0.0
2013 8412 0.0 0.0 0.0
2014 8530 0.0 0.0 0.0
2015 7734 0.0 0.0 0.0
2016 6876 0.0 0.0 0.0
2017 6222 0.0 0.0 0.0
2018 7715 0.0 0.0 0.0
2019 8645 0.0 0.0 0.0
2020 2146 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-13 No Incident Encountered 0.00 0.00
2012-09-02 No Incident Encountered 0.00 0.00

For data sources see[8]

References