X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605192316000

Well Details

Well ID: 0605192316000
Loading map...
Location: 00/16-23-060-19W5/0
Location Alias: 00/16-23-60-19 W5M
Location Alias 2: 00/16-23-060-19 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 19
Section: 23
County/Municipality: Municipal District of Greenview No. 16
Well Name: TANGLE CREEK HZ KAYBOBS 16-23-60-19
Operator Name: Tangle Creek Energy Ltd.
License Number: 0417751
License Date: 2010-01-22
License Status: Issued
Spud Date: 2010-02-06
Final Drill Date: 2010-02-28
Well Total Depth: 3671.00 m
Surface Hole Latitude: 54.198992
Surface Hole Longitude: -116.743701

For data sources see[1][2]

Well History

Date Event
2010-01-22 Obtained License
2010-02-08 Surface Casing Operation Performed
2010-02-13 Direction Drilling Operation Performed - Horizontal
2010-02-18 Well Log Performed
2010-02-21 Intermediate Casing Operation Performed
2010-02-28 Finished Drilling
2010-02-28 Well Log Performed
2010-02-28 Well Mode changed to Drilled and Cased
2010-03-02 Liner Casing Operation Performed
2010-03-03 Rig Released
2010-03-08 Well Log Performed
2010-03-19 Perforation Treatment Performed - Multi-Stage Fracture
2010-03-19 Perforation Treatment Performed - Open-Hole Completion
2010-03-27 Well Began Production
2010-03-27 Well Fluid changed to Gas
2010-03-27 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-02-13 1893.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-03-19 Open Hole/Barefoot Completion 3663.00 3671.00 0
2010-03-19 Multi-Stage Fracture 2807.60 2807.70 0
2010-03-19 Multi-Stage Fracture 2700.90 2701.00 0
2010-03-19 Multi-Stage Fracture 2592.60 2592.70 0
2010-03-19 Multi-Stage Fracture 2510.90 2511.00 0
2010-03-19 Multi-Stage Fracture 3653.70 3653.80 0
2010-03-19 Multi-Stage Fracture 3540.20 3540.30 0
2010-03-19 Multi-Stage Fracture 3445.20 3445.30 0
2010-03-19 Multi-Stage Fracture 3335.30 3335.40 0
2010-03-19 Multi-Stage Fracture 3224.90 3225.00 0
2010-03-19 Multi-Stage Fracture 3117.30 3117.40 0
2010-03-19 Multi-Stage Fracture 3009.20 3009.30 0
2010-03-19 Multi-Stage Fracture 2913.90 2914.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 6539 0.0 0.0 0.0
2011 6208 0.0 0.0 0.0
2012 6669 0.0 0.0 0.0
2013 6067 0.0 0.0 0.0
2014 6259 0.0 0.0 0.0
2015 668 0.0 0.0 0.0
2016 3542 0.0 0.0 0.0
2017 5648 0.0 0.0 0.0
2018 8729 0.0 0.0 0.0
2019 7056 0.0 0.0 0.0
2020 1631 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-03-19 No Incident Encountered 0.00 0.00

For data sources see[7]

References