X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605192204000

Well Details

Well ID: 0605192204000
Loading map...
Location: 00/04-22-060-19W5/0
Location Alias: 00/04-22-60-19 W5M
Location Alias 2: 00/04-22-060-19 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 19
Section: 22
County/Municipality: Municipal District of Greenview No. 16
Well Name: TANGLE CREEK HZ KAYBOBS 4-22-60-19
Operator Name: Tangle Creek Energy Ltd.
License Number: 0395991
License Date: 2008-04-18
License Status: Issued
Spud Date: 2008-05-03
Final Drill Date: 2008-05-26
Well Total Depth: 3136.00 m
Surface Hole Latitude: 54.202960
Surface Hole Longitude: -116.761851

For data sources see[1][2]

Well History

Date Event
2008-04-18 Obtained License
2008-05-03 Lost Circulation Occurred
2008-05-04 Lost Circulation Occurred
2008-05-05 Surface Casing Operation Performed
2008-05-13 Direction Drilling Operation Performed - Horizontal
2008-05-22 Intermediate Casing Operation Performed
2008-05-26 Finished Drilling
2008-05-26 Well Mode changed to Drilled and Cased
2008-05-28 Liner Casing Operation Performed
2008-05-28 Rig Released
2008-07-14 Well Log Performed
2008-07-20 Perforation Treatment Performed - Multi-Stage Fracture
2008-07-20 Perforation Treatment Performed - Open-Hole Completion
2008-07-30 Well Began Production
2008-07-30 Well Fluid changed to Gas
2008-07-30 Well Mode changed to Flowing
2017-06-22 Well Fluid changed to Gas
2017-06-22 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-05-13 2033.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-07-20 Open Hole/Barefoot Completion 3134.50 3136.00 0
2008-07-20 Multi-Stage Fracture 3078.10 3078.20 0
2008-07-20 Multi-Stage Fracture 2942.20 2942.30 0
2008-07-20 Multi-Stage Fracture 2850.80 2850.90 0
2008-07-20 Multi-Stage Fracture 2772.70 2772.80 0
2008-07-20 Multi-Stage Fracture 2694.00 2694.10 0
2008-07-20 Multi-Stage Fracture 2590.10 2590.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 3091 0.0 0.0 0.0
2009 7418 0.0 0.0 0.0
2010 8294 0.0 0.0 0.0
2011 7651 0.0 0.0 0.0
2012 8572 0.0 0.0 0.0
2013 7248 0.0 0.0 0.0
2014 5978 0.0 0.0 0.0
2015 1481 0.0 0.0 0.0
2016 3820 0.0 0.0 0.0
2017 6736 0.0 0.0 0.0
2018 8609 0.0 0.0 0.0
2019 6167 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2008-05-03 Lost Circulation 120.00 120.00
2008-05-04 Lost Circulation 181.00 502.00
2008-07-20 No Incident Encountered 0.00 0.00

For data sources see[7]

References