X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605192013030

Well Details

Well ID: 0605192013030
Loading map...
Location: 03/13-20-060-19W5/0
Location Alias: 03/13-20-60-19 W5M
Location Alias 2: 03/13-20-060-19 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 19
Section: 20
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC 103 HZ KAYBOBS 13-20-60-19
Operator Name: XTO Energy Canada ULC
License Number: 0411469
License Date: 2009-07-17
License Status: Suspension
Spud Date: 2009-08-16
Final Drill Date: 2009-09-01
Well Total Depth: 3475.00 m
Surface Hole Latitude: 54.198003
Surface Hole Longitude: -116.815022

For data sources see[1][2]

Well History

Date Event
2009-07-17 Obtained License
2009-08-17 Surface Casing Operation Performed
2009-08-21 Direction Drilling Operation Performed - Horizontal
2009-08-27 Production Casing Operation Performed
2009-09-01 Finished Drilling
2009-09-01 Well Log Performed
2009-09-01 Well Mode changed to Drilled and Cased
2009-09-03 Liner Casing Operation Performed
2009-09-03 Perforation Treatment Performed - Open-Hole Completion
2009-09-03 Rig Released
2009-09-19 Well Log Performed
2009-09-24 Perforation Treatment Performed - Multi-Stage Fracture
2009-09-24 Well Began Production
2009-09-24 Well Fluid changed to Gas
2009-09-24 Well Mode changed to Flowing
2009-10-18 Well Log Performed
2010-11-10 Well Fluid changed to Gas
2010-11-10 Well Mode changed to Pumping
2014-08-01 Well Fluid changed to Gas
2014-08-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-08-21 2070.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-09-03 Open Hole/Barefoot Completion 3459.00 3475.00 0
2009-09-24 Multi-Stage Fracture 2558.10 2558.20 0
2009-09-24 Multi-Stage Fracture 2428.50 2428.60 0
2009-09-24 Multi-Stage Fracture 2339.40 2339.50 0
2009-09-24 Multi-Stage Fracture 3454.40 3454.50 0
2009-09-24 Multi-Stage Fracture 3379.30 3379.40 0
2009-09-24 Multi-Stage Fracture 3264.10 3264.20 0
2009-09-24 Multi-Stage Fracture 3135.90 3136.00 0
2009-09-24 Multi-Stage Fracture 3034.30 3034.40 0
2009-09-24 Multi-Stage Fracture 2919.20 2919.30 0
2009-09-24 Multi-Stage Fracture 2790.00 2790.10 0
2009-09-24 Multi-Stage Fracture 2646.90 2647.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 984 0.0 0.0 0.0
2010 6809 0.0 0.0 0.0
2011 8623 0.0 0.0 0.0
2012 3850 0.0 0.0 0.0
2013 2909 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-09-24 No Incident Encountered 0.00 0.00

For data sources see[7]

References