X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605191001000

Well Details

Well ID: 0605191001000
Loading map...
Location: 00/01-10-060-19W5/0
Location Alias: 00/01-10-60-19 W5M
Location Alias 2: 00/01-10-060-19 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 19
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC HZ KAYBOBS 1-10-60-19
Operator Name: XTO Energy Canada ULC
License Number: 0395875
License Date: 2008-04-14
License Status: Issued
Spud Date: 2008-04-18
Final Drill Date: 2008-05-08
Well Total Depth: 3420.00 m
Surface Hole Latitude: 54.175816
Surface Hole Longitude: -116.771739

For data sources see[1][2]

Well History

Date Event
2008-04-14 Obtained License
2008-04-19 Surface Casing Operation Performed
2008-04-22 Direction Drilling Operation Performed - Horizontal
2008-05-01 Production Casing Operation Performed
2008-05-01 Well Log Performed
2008-05-06 Well Log Performed
2008-05-08 Finished Drilling
2008-05-08 Well Log Performed
2008-05-08 Well Mode changed to Drilled and Cased
2008-05-10 Liner Casing Operation Performed
2008-05-10 Perforation Treatment Performed - Open-Hole Completion
2008-05-11 Rig Released
2008-06-17 Well Log Performed
2008-06-20 Perforation Treatment Performed - Multi-Stage Fracture
2008-06-21 Well Began Production
2008-06-21 Well Fluid changed to Gas
2008-06-21 Well Mode changed to Flowing
2011-02-01 Well Fluid changed to Gas
2011-02-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-04-22 1811.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-05-10 Open Hole/Barefoot Completion 3403.50 3420.00 0
2008-06-20 Multi-Stage Fracture 3394.10 3395.30 0
2008-06-20 Multi-Stage Fracture 3324.70 3325.50 0
2008-06-20 Multi-Stage Fracture 3164.90 3165.60 0
2008-06-20 Multi-Stage Fracture 2933.60 2934.30 0
2008-06-20 Multi-Stage Fracture 2782.80 2783.50 0
2008-06-20 Multi-Stage Fracture 2623.10 2623.80 0
2008-06-20 Multi-Stage Fracture 2558.60 2559.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 4251 0.0 0.0 0.0
2009 7356 0.0 0.0 0.0
2010 7991 0.0 0.0 0.0
2011 8668 0.0 0.0 0.0
2012 7646 0.0 0.0 0.0
2013 7380 0.0 0.0 0.0
2014 7959 0.0 0.0 0.0
2015 7635 0.0 0.0 0.0
2016 6385 0.0 0.0 0.0
2017 6714 0.0 0.0 0.0
2018 5288 0.0 0.0 0.0
2019 5673 0.0 0.0 0.0
2020 2104 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2008-06-20 No Incident Encountered 0.00 0.00

For data sources see[7]

References