X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605190604020

Well Details

Well ID: 0605190604020
Loading map...
Location: 02/04-06-060-19W5/0
Location Alias: 02/04-06-60-19 W5M
Location Alias 2: 02/04-06-060-19 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 19
Section: 06
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY 102 HZ KAYBOBS 4-6-60-19
Operator Name: Paramount Resources Ltd.
License Number: 0427704
License Date: 2010-12-14
License Status: Issued
Spud Date: 2011-01-03
Final Drill Date: 2011-02-03
Well Total Depth: 4099.00 m
Surface Hole Latitude: 54.170512
Surface Hole Longitude: -116.842951

For data sources see[1][2]

Well History

Date Event
2010-12-14 Obtained License
2011-01-05 Surface Casing Operation Performed
2011-01-14 Lost Circulation Occurred
2011-01-17 Direction Drilling Operation Performed - Horizontal
2011-01-19 Intermediate Casing Operation Performed
2011-02-03 Finished Drilling
2011-02-03 Well Mode changed to Drilled and Cased
2011-02-04 Well Log Performed
2011-02-07 Liner Casing Operation Performed
2011-02-10 Rig Released
2011-02-16 Well Log Performed
2011-02-27 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-27 Perforation Treatment Performed - Open-Hole Completion
2011-03-01 Well Began Production
2011-03-01 Well Fluid changed to Gas
2011-03-01 Well Mode changed to Flowing
2011-03-29 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-01-17 2396.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-02-27 Open Hole/Barefoot Completion 4050.00 4099.00 0
2011-02-27 Multi-Stage Fracture 3473.70 3536.60 0
2011-02-27 Multi-Stage Fracture 3399.00 3473.50 0
2011-02-27 Multi-Stage Fracture 3324.10 3398.90 0
2011-02-27 Multi-Stage Fracture 3249.50 3324.00 0
2011-02-27 Multi-Stage Fracture 3175.00 3249.40 0
2011-02-27 Multi-Stage Fracture 3100.70 3174.90 0
2011-02-27 Multi-Stage Fracture 3026.00 3100.60 0
2011-02-27 Multi-Stage Fracture 2951.00 3025.90 0
2011-02-27 Multi-Stage Fracture 2875.80 2950.90 0
2011-02-27 Multi-Stage Fracture 2773.10 2875.70 0
2011-02-27 Multi-Stage Fracture 4040.70 4050.00 0
2011-02-27 Multi-Stage Fracture 2697.70 2773.00 0
2011-02-27 Multi-Stage Fracture 2622.30 2697.60 0
2011-02-27 Multi-Stage Fracture 2559.20 2622.20 0
2011-02-27 Multi-Stage Fracture 2484.60 2559.00 0
2011-02-27 Multi-Stage Fracture 3987.00 4040.60 0
2011-02-27 Multi-Stage Fracture 3912.10 3986.90 0
2011-02-27 Multi-Stage Fracture 3837.00 3912.00 0
2011-02-27 Multi-Stage Fracture 3761.90 3836.90 0
2011-02-27 Multi-Stage Fracture 3686.80 3761.80 0
2011-02-27 Multi-Stage Fracture 3611.80 3686.70 0
2011-02-27 Multi-Stage Fracture 3536.70 3611.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 6432 0.0 0.0 0.0
2012 8616 0.0 0.0 0.0
2013 2279 0.0 0.0 0.0
2014 6743 0.0 0.0 0.0
2015 3672 0.0 0.0 0.0
2016 840 0.0 0.0 0.0
2017 2880 0.0 0.0 0.0
2018 5640 0.0 0.0 0.0
2019 8543 0.0 0.0 0.0
2020 1392 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-01-14 Lost Circulation 134.00 172.00

For data sources see[7]

References