X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605190305000

Well Details

Well ID: 0605190305000
Loading map...
Location: 00/05-03-060-19W5/0
Location Alias: 00/05-03-60-19 W5M
Location Alias 2: 00/05-03-060-19 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 19
Section: 03
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY HZ KAYBOBS 5-3-60-19
Operator Name: Paramount Resources Ltd.
License Number: 0444327
License Date: 2012-02-21
License Status: Issued
Spud Date: 2012-03-11
Final Drill Date: 2012-04-15
Well Total Depth: 5306.00 m
Surface Hole Latitude: 54.161946
Surface Hole Longitude: -116.806810

For data sources see[1][2]

Well History

Date Event
2012-02-21 Obtained License
2012-03-13 Surface Casing Operation Performed
2012-03-31 Intermediate Casing Operation Performed
2012-03-31 Well Log Performed
2012-04-03 Direction Drilling Operation Performed - Deviate
2012-04-04 Direction Drilling Operation Performed - Horizontal
2012-04-15 Finished Drilling
2012-04-15 Well Log Performed
2012-04-15 Well Mode changed to Drilled and Cased
2012-04-18 Liner Casing Operation Performed
2012-04-21 Rig Released
2012-09-19 Well Log Performed
2012-09-26 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-26 Perforation Treatment Performed - Open-Hole Completion
2012-09-27 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-28 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-02 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-03 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-04 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-11 Well Began Production
2012-10-11 Well Fluid changed to Shale Gas Only
2012-10-11 Well Mode changed to Flowing
2012-10-31 Well Log Performed
2018-10-29 Well Fluid changed to Shale Gas Only
2018-10-29 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-03-11 Precision Drilling Corporation 256 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-04-03 2965.80 Deviate (5 - 79 degrees)
2012-04-04 3499.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-09-26 Open Hole/Barefoot Completion 5293.80 5306.00 0
2012-10-02 Multi-Stage Fracture 4593.70 4593.80 0
2012-10-02 Multi-Stage Fracture 4535.30 4535.40 0
2012-10-02 Multi-Stage Fracture 4487.70 4487.80 0
2012-10-02 Multi-Stage Fracture 4428.10 4428.20 0
2012-10-02 Multi-Stage Fracture 4369.60 4369.70 0
2012-10-02 Multi-Stage Fracture 4336.60 4336.70 0
2012-10-03 Multi-Stage Fracture 4307.50 4307.60 0
2012-10-03 Multi-Stage Fracture 4248.00 4248.10 0
2012-10-03 Multi-Stage Fracture 4189.00 4189.10 0
2012-10-03 Multi-Stage Fracture 4144.00 4144.10 0
2012-09-26 Multi-Stage Fracture 5284.30 5284.40 0
2012-10-03 Multi-Stage Fracture 4081.30 4081.40 0
2012-10-03 Multi-Stage Fracture 4023.40 4023.50 0
2012-10-03 Multi-Stage Fracture 3964.60 3964.70 0
2012-10-03 Multi-Stage Fracture 3907.90 3908.00 0
2012-10-03 Multi-Stage Fracture 3843.20 3843.30 0
2012-10-04 Multi-Stage Fracture 3795.60 3795.70 0
2012-10-04 Multi-Stage Fracture 3737.20 3737.30 0
2012-10-04 Multi-Stage Fracture 3678.20 3678.30 0
2012-10-04 Multi-Stage Fracture 3620.20 3620.30 0
2012-10-04 Multi-Stage Fracture 3574.40 3574.50 0
2012-09-27 Multi-Stage Fracture 5231.50 5231.60 0
2012-09-27 Multi-Stage Fracture 5174.80 5194.90 0
2012-09-27 Multi-Stage Fracture 4897.10 4897.20 0
2012-09-27 Multi-Stage Fracture 4837.30 4837.40 0
2012-09-28 Multi-Stage Fracture 4774.70 4774.80 0
2012-09-28 Multi-Stage Fracture 4715.80 4715.90 0
2012-10-02 Multi-Stage Fracture 4653.30 4653.40 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1168 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8495 0.0 0.0 0.0
2015 8471 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8447 0.0 0.0 0.0
2018 8567 0.0 0.0 0.0
2019 8735 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-23 No Incident Encountered 0.00 0.00
2012-10-09 No Incident Encountered 0.00 0.00
2012-12-22 No Incident Encountered 0.00 0.00

For data sources see[8]

References