X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605182809000

Well Details

Well ID: 0605182809000
Loading map...
Location: 00/09-28-060-18W5/0
Location Alias: 00/09-28-60-18 W5M
Location Alias 2: 00/09-28-060-18 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 18
Section: 28
County/Municipality: Municipal District of Greenview No. 16
Well Name: TANGLE CREEK KAYBOBS 9-28-60-18
Operator Name: Tangle Creek Energy Ltd.
License Number: 0449611
License Date: 2012-10-30
License Status: Issued
Spud Date: 2012-11-05
Final Drill Date: 2012-11-13
Well Total Depth: 3337.00 m
Surface Hole Latitude: 54.223494
Surface Hole Longitude: -116.652918

For data sources see[1][2]

Well History

Date Event
2012-10-30 Obtained License
2012-11-06 Surface Casing Operation Performed
2012-11-09 Direction Drilling Operation Performed - Deviate
2012-11-10 Direction Drilling Operation Performed - Horizontal
2012-11-13 Finished Drilling
2012-11-13 Well Mode changed to Drilled and Cased
2012-11-15 Production Casing Operation Performed
2012-11-16 Rig Released
2012-11-26 Well Log Performed
2012-11-29 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-29 Perforation Treatment Performed - Open-Hole Completion
2012-12-01 Well Began Production
2012-12-01 Well Fluid changed to Crude Oil
2012-12-01 Well Mode changed to Flowing
2013-01-01 Well Fluid changed to Crude Oil
2013-01-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-11-05 Trinidad Drilling Ltd. 22 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-11-09 1410.50 Deviate (5 - 79 degrees)
2012-11-10 1841.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-11-29 Open Hole/Barefoot Completion 3332.00 3337.00 0
2012-11-29 Multi-Stage Fracture 2718.00 2718.10 0
2012-11-29 Multi-Stage Fracture 2645.60 2645.70 0
2012-11-29 Multi-Stage Fracture 2572.60 2572.70 0
2012-11-29 Multi-Stage Fracture 2499.70 2499.80 0
2012-11-29 Multi-Stage Fracture 2427.20 2427.30 0
2012-11-29 Multi-Stage Fracture 2354.00 2354.10 0
2012-11-29 Multi-Stage Fracture 2280.70 2280.80 0
2012-11-29 Multi-Stage Fracture 2207.70 2207.80 0
2012-11-29 Multi-Stage Fracture 2134.80 2134.90 0
2012-11-29 Multi-Stage Fracture 2062.70 2062.80 0
2012-11-29 Multi-Stage Fracture 3330.30 3330.40 0
2012-11-29 Multi-Stage Fracture 3225.80 3228.90 0
2012-11-29 Multi-Stage Fracture 3153.40 3153.50 0
2012-11-29 Multi-Stage Fracture 3080.80 3080.90 0
2012-11-29 Multi-Stage Fracture 3008.60 3008.70 0
2012-11-29 Multi-Stage Fracture 2936.70 2936.80 0
2012-11-29 Multi-Stage Fracture 2874.60 2874.70 0
2012-11-29 Multi-Stage Fracture 2790.50 2790.60 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 206 0.0 0.0 0.0
2013 8479 0.0 0.0 0.0
2014 8357 0.0 0.0 0.0
2015 7726 0.0 0.0 0.0
2016 8438 0.0 0.0 0.0
2017 8711 0.0 0.0 0.0
2018 8508 0.0 0.0 0.0
2019 8639 0.0 0.0 0.0
2020 2157 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-11-05 No Incident Encountered 0.00 0.00
2012-11-22 No Incident Encountered 0.00 0.00

For data sources see[8]

References