X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605182716020

Well Details

Well ID: 0605182716020
Loading map...
Location: 02/16-27-060-18W5/0
Location Alias: 02/16-27-60-18 W5M
Location Alias 2: 02/16-27-060-18 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 18
Section: 27
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC HZ KAYBOBS 16-27-60-18
Operator Name: XTO Energy Canada ULC
License Number: 0412066
License Date: 2009-09-01
License Status: Amended
Spud Date: 2009-09-19
Final Drill Date: 2009-10-06
Well Total Depth: 3885.00 m
Surface Hole Latitude: 54.205893
Surface Hole Longitude: -116.609594

For data sources see[1][2]

Well History

Date Event
2009-09-01 Obtained License
2009-09-21 Surface Casing Operation Performed
2009-09-23 Direction Drilling Operation Performed - Horizontal
2009-09-23 Well Log Performed
2009-09-29 Production Casing Operation Performed
2009-10-06 Finished Drilling
2009-10-06 Well Log Performed
2009-10-06 Well Mode changed to Drilled and Cased
2009-10-07 Liner Casing Operation Performed
2009-10-07 Perforation Treatment Performed - Open-Hole Completion
2009-10-08 Rig Released
2009-10-17 Well Log Performed
2009-10-19 Perforation Treatment Performed - Multi-Stage Fracture
2009-10-19 Well Began Production
2009-10-19 Well Fluid changed to Gas
2009-10-19 Well Mode changed to Flowing
2011-04-05 Well Fluid changed to Gas
2011-04-05 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-09-23 1613.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-10-07 Open Hole/Barefoot Completion 3870.00 3885.00 0
2009-10-19 Multi-Stage Fracture 2749.50 2750.30 0
2009-10-19 Multi-Stage Fracture 2607.80 2608.60 0
2009-10-19 Multi-Stage Fracture 2524.00 2524.80 0
2009-10-19 Multi-Stage Fracture 3860.00 3861.40 0
2009-10-19 Multi-Stage Fracture 3774.70 3775.50 0
2009-10-19 Multi-Stage Fracture 3639.60 3640.40 0
2009-10-19 Multi-Stage Fracture 3495.90 3496.70 0
2009-10-19 Multi-Stage Fracture 3345.40 3346.20 0
2009-10-19 Multi-Stage Fracture 3130.60 3131.40 0
2009-10-19 Multi-Stage Fracture 3022.80 3023.60 0
2009-10-19 Multi-Stage Fracture 2892.10 2892.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 1413 0.0 0.0 0.0
2010 8190 0.0 0.0 0.0
2011 7404 0.0 0.0 0.0
2012 5648 0.0 0.0 0.0
2013 6049 0.0 0.0 0.0
2014 6058 0.0 0.0 0.0
2015 7252 0.0 0.0 0.0
2016 1534 0.0 0.0 0.0
2017 7251 0.0 0.0 0.0
2018 5240 0.0 0.0 0.0
2019 3914 0.0 0.0 0.0
2020 2125 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-10-19 No Incident Encountered 0.00 0.00

For data sources see[7]

References