X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605181516030

Well Details

Well ID: 0605181516030
Loading map...
Location: 03/16-15-060-18W5/0
Location Alias: 03/16-15-60-18 W5M
Location Alias 2: 03/16-15-060-18 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 18
Section: 15
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRIOIL HZ 103 KAYBOBS 16-15-60-18
Operator Name: ORLEN Upstream Canada Ltd.
License Number: 0468769
License Date: 2014-07-31
License Status: Issued
Spud Date: 2014-08-02
Final Drill Date: 2014-08-11
Well Total Depth: 3006.00 m
Surface Hole Latitude: 54.182370
Surface Hole Longitude: -116.603007

For data sources see[1][2]

Well History

Date Event
2014-07-31 Obtained License
2014-08-04 Surface Casing Operation Performed
2014-08-06 Direction Drilling Operation Performed - Deviate
2014-08-07 Direction Drilling Operation Performed - Horizontal
2014-08-11 Finished Drilling
2014-08-11 Well Log Performed
2014-08-11 Well Mode changed to Drilled and Cased
2014-08-12 Production Casing Operation Performed
2014-08-13 Rig Released
2014-09-01 Well Began Production
2014-09-01 Well Fluid changed to Crude Oil
2014-09-01 Well Mode changed to Flowing
2014-09-04 Perforation Treatment Performed - Multi-Stage Fracture
2014-09-04 Perforation Treatment Performed - Open-Hole Completion
2014-09-05 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-08-02 Trinidad Drilling Ltd. 68 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-08-06 1402.50 Deviate (5 - 79 degrees)
2014-08-07 1722.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-09-04 Open Hole/Barefoot Completion 2996.50 3006.00 0
2014-09-04 Multi-Stage Fracture 2427.90 2428.00 0
2014-09-04 Multi-Stage Fracture 2373.00 2373.10 0
2014-09-04 Multi-Stage Fracture 2304.80 2304.90 0
2014-09-04 Multi-Stage Fracture 2236.60 2236.70 0
2014-09-04 Multi-Stage Fracture 2181.70 2181.80 0
2014-09-04 Multi-Stage Fracture 2126.90 2127.00 0
2014-09-05 Multi-Stage Fracture 2072.40 2072.50 0
2014-09-05 Multi-Stage Fracture 2017.50 2017.60 0
2014-09-05 Multi-Stage Fracture 1962.70 1962.80 0
2014-09-05 Multi-Stage Fracture 1908.10 1908.20 0
2014-09-04 Multi-Stage Fracture 2987.00 2987.10 0
2014-09-05 Multi-Stage Fracture 1853.30 1853.40 0
2014-09-05 Multi-Stage Fracture 1798.50 1798.60 0
2014-09-04 Multi-Stage Fracture 2918.70 2918.80 0
2014-09-04 Multi-Stage Fracture 2837.10 2837.20 0
2014-09-04 Multi-Stage Fracture 2768.90 2769.00 0
2014-09-04 Multi-Stage Fracture 2687.30 2687.40 0
2014-09-04 Multi-Stage Fracture 2619.00 2619.10 0
2014-09-04 Multi-Stage Fracture 2550.90 2551.00 0
2014-09-04 Multi-Stage Fracture 2496.00 2496.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-09-04 2014-09-05 1,631 0 N/A
2 2014-09-05 2014-09-05 1,631 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* Not Available 100 45.2916 N/A
ClearFRAC XT:Water. N002 Schlumberger Crystalline silica 14808-60-7 100 28.5255 N/A
ClearFRAC XT:Water. N002 Schlumberger Energizing Fluid Acetic acid ethenyl ester. polymer with ethenol 25213-24-5 100 0.0017 N/A
Benzenesulfonic acid. 4-ethenyl-. sodium salt. homopolymer 25704-18-1 100 0.0182 N/A
Cholinium chloride 67-48-1 100 0.0695 N/A
Erucic amidopropyl dimethyl betaine 149879-98-1 100 0.2677 N/A
Magnesium silicate hydrate (talc) 14807-96-6 100 0.0002 N/A
Nitrogen. liquid form 7727-37-9 100 25.6247 N/A
Polyvinyl acetate. partially hydrolyzed 304443-60-5 100 0.0007 N/A
Propan-2-ol 67-63-0 100 0.1898 N/A
Vinylidene chloride/methylacrylate copolymer 25038-72-6 100 0.0076 N/A
2 ClearFRAC XT:Water. N002 Schlumberger Energizing Fluid Alcohol. C11-14. ethoxylated 78330-21-9 100 0.0022 N/A
Alcohol. C7-9-iso. C8. ethoxylated 78330-19-5 100 0.0045 N/A
Alcohol. C9-11-iso. C10. ethoxylated 78330-20-8 100 0.0045 N/A
Ethoxylated propoxylated 4-nonylphenol-formaldehyde resin 30846-35-6 100 0.0034 N/A
Heavy aromatic naphtha 64742-94-5 100 0.0023 N/A
Methanol 67-56-1 100 0.0257 N/A
Naphtalene (impurity) 91-20-3 100 0.0004 N/A
Poly(oxy-1.2-ethanediyl).a-hydro-hydroxy-
Ethane-1.2-diol. e
25322-68-3 100 0.001 N/A
Quaternary ammonium compounds chlorides derivatives 68989-00-4 100 0.0022 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-08-27 2014-09-05 Surface Water - River 631

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 2081 0.0 0.0 0.0
2015 8659 0.0 0.0 0.0
2016 8628 0.0 0.0 0.0
2017 8502 0.0 0.0 0.0
2018 7458 0.0 0.0 0.0
2019 7768 0.0 0.0 0.0
2020 2062 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-08-13 No Incident Encountered 0.00 0.00
2014-09-13 No Incident Encountered 0.00 0.00

For data sources see[10]

References