If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0605160812000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.176293,"lon":-116.374161,"icon":""}]} |
| Location: 00/12-08-060-16W5/0 | |
| Location Alias: 00/12-08-60-16 W5M | |
| Location Alias 2: 00/12-08-060-16 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 060 | |
| Meridian: 5 | |
| Range: 16 | |
| Section: 08 | |
| County/Municipality: Woodlands County | |
| Well Name: TRILOGY ET AL KAYBOBS 12-8-60-16 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0262574 | |
| License Date: 2001-11-27 | |
| License Status: Suspension | |
| Spud Date: 2001-12-29 | |
| Final Drill Date: 2002-01-08 | |
| Well Total Depth: 1970.00 m | |
| Surface Hole Latitude: 54.176293 | |
| Surface Hole Longitude: -116.374161 |
| Date | Event |
|---|---|
| 2001-11-27 | Obtained License |
| 2001-12-31 | Surface Casing Operation Performed |
| 2002-01-02 | Direction Drilling Operation Performed - Deviate |
| 2002-01-07 | Well Log Performed |
| 2002-01-08 | Finished Drilling |
| 2002-01-09 | Drill Stem Test Performed |
| 2002-01-10 | Production Casing Operation Performed |
| 2002-01-10 | Rig Released |
| 2002-01-10 | Well Mode changed to Drilled and Cased |
| 2002-01-22 | Perforation Treatment Performed - Jet Perforation |
| 2002-01-22 | Well Log Performed |
| 2002-01-23 | Perforation Treatment Performed - Jet Perforation |
| 2002-01-24 | Well Log Performed |
| 2002-01-26 | Perforation Treatment Performed - Fractured |
| 2002-01-31 | Perforation Treatment Performed - Fractured |
| 2002-02-03 | Perforation Treatment Performed - Jet Perforation |
| 2002-02-03 | Well Log Performed |
| 2002-02-05 | Well Log Performed |
| 2002-02-06 | Perforation Treatment Performed - Fractured |
| 2002-02-13 | Perforation Treatment Performed - Cement Squeeze |
| 2002-02-13 | Plug Back Performed |
| 2002-03-07 | Well Began Production |
| 2002-03-07 | Well Fluid changed to Gas |
| 2002-03-07 | Well Mode changed to Flowing |
| 2002-11-01 | Well Fluid changed to Gas |
| 2002-11-01 | Well Mode changed to Pumping |
| 2014-02-26 | Well Fluid changed to Gas |
| 2014-02-26 | Well Mode changed to Suspended |
| 2014-03-10 | Well Fluid changed to Gas |
| 2014-03-10 | Well Mode changed to Pumping |
| 2015-08-08 | Well Fluid changed to Gas |
| 2015-08-08 | Well Mode changed to Suspended |
| 2017-03-28 | Well Fluid changed to Gas |
| 2017-03-28 | Well Mode changed to Pumping |
| 2017-04-05 | Well Fluid changed to Gas |
| 2017-04-05 | Well Mode changed to Suspended |
| 2020-03-08 | Well Fluid changed to Gas |
| 2020-03-08 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2002-01-02 | 995.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2002-01-22 | Perforation | 1948.00 | 1952.00 | 17 |
| 2002-01-23 | Perforation | 1917.00 | 1922.00 | 17 |
| 2002-01-26 | Fracture | 1948.00 | 1952.00 | 0 |
| 2002-01-31 | Fracture | 1917.00 | 1922.00 | 0 |
| 2002-02-03 | Perforation | 976.00 | 980.00 | 17 |
| 2002-02-03 | Perforation | 970.50 | 972.00 | 17 |
| 2002-02-06 | Fracture | 970.50 | 980.00 | 0 |
| 2002-02-13 | Cement Squeeze | 970.50 | 980.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2002 | 5280 | 0.0 | 0.0 | 0.0 |
| 2003 | 6770 | 0.0 | 0.0 | 0.0 |
| 2004 | 7991 | 0.0 | 0.0 | 0.0 |
| 2005 | 8759 | 0.0 | 0.0 | 0.0 |
| 2006 | 8757 | 0.0 | 0.0 | 0.0 |
| 2007 | 3736 | 0.0 | 0.0 | 0.0 |
| 2008 | 5903 | 0.0 | 0.0 | 0.0 |
| 2009 | 6925 | 0.0 | 0.0 | 0.0 |
| 2010 | 8687 | 0.0 | 0.0 | 0.0 |
| 2011 | 7414 | 0.0 | 0.0 | 0.0 |
| 2012 | 4202 | 0.0 | 0.0 | 0.0 |
| 2014 | 2378 | 0.0 | 0.0 | 0.0 |
| 2015 | 48 | 0.0 | 0.0 | 0.0 |
| 2017 | 1463 | 0.0 | 0.0 | 0.0 |
| 2020 | 576 | 0.0 | 0.0 | 0.0 |
For data sources see[6]