X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605092207000

Well Details

Well ID: 0605092207000
Loading map...
Location: 00/07-22-060-09W5/0
Location Alias: 00/07-22-60-09 W5M
Location Alias 2: 00/07-22-060-09 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 09
Section: 22
County/Municipality: Woodlands County
Well Name: IONIC GREEENCOURT 7-22-60-9
Operator Name: TAQA North Ltd.
License Number: 0232218
License Date: 2000-01-18
License Status: Suspension
Spud Date: 2000-01-20
Final Drill Date: 2000-01-22
Well Total Depth: 1475.00 m
Surface Hole Latitude: 54.200543
Surface Hole Longitude: -115.263119

For data sources see[1][2]

Well History

Date Event
2000-01-18 Obtained License
2000-01-20 Surface Casing Operation Performed
2000-01-22 Finished Drilling
2000-01-23 Well Log Performed
2000-01-24 Production Casing Operation Performed
2000-01-24 Rig Released
2000-01-24 Well Mode changed to Drilled and Cased
2000-01-28 Perforation Treatment Performed - Jet Perforation
2000-01-28 Well Log Performed
2005-04-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-04-29 Perforation Treatment Performed - Bridge Plug No Cement Required
2005-04-29 Perforation Treatment Performed - Jet Perforation
2005-04-29 Plug Back Performed
2005-05-01 Perforation Treatment Performed - Bridge Plug No Cement Required
2005-05-01 Perforation Treatment Performed - Jet Perforation
2005-05-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-05-02 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-01-28 Perforation 1440.50 1442.00 17
2005-05-02 Packing Device Capped w/Cement 390.00 391.00 0
2000-01-28 Perforation 1443.00 1444.00 17
2005-04-29 Packing Device Capped w/Cement 1422.00 1430.00 0
2005-04-29 Perforation 566.00 567.00 17
2005-04-29 Perforation 548.00 550.00 17
2005-04-29 Bridge Plug, No Cement 538.00 539.00 0
2005-04-29 Perforation 508.00 510.00 17
2005-05-01 Bridge Plug, No Cement 497.00 498.00 0
2005-05-01 Perforation 396.00 402.00 17

For data sources see[4]



References