X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605053214000

Well Details

Well ID: 0605053214000
Loading map...
Location: 00/14-32-060-05W5/0
Location Alias: 00/14-32-60-05 W5M
Location Alias 2: 00/14-32-060-05 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 05
Section: 32
County/Municipality: County of Barrhead No. 11
Well Name: 981405 THUNDER 14-32-60-5
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0144399
License Date: 1990-06-08
License Status: Issued
Spud Date: 1990-06-10
Final Drill Date: 1990-06-14
Well Total Depth: 1205.00 m
Surface Hole Latitude: 54.236028
Surface Hole Longitude: -114.715887

For data sources see[1][2]

Well History

Date Event
1990-06-08 Obtained License
1990-06-11 Surface Casing Operation Performed
1990-06-14 Finished Drilling
1990-06-14 Well Log Performed
1990-06-15 Drill Stem Test Performed
1990-06-17 Production Casing Operation Performed
1990-06-17 Rig Released
1990-06-23 Perforation Treatment Performed - Jet Perforation
1990-06-23 Well Log Performed
1990-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-06-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-06-25 Plug Back Performed
1990-06-26 Perforation Treatment Performed - Jet Perforation
1990-06-26 Well Log Performed
1990-09-19 Perforation Treatment Performed - Jet Perforation
1990-09-19 Well Log Performed
1996-06-25 Well Mode changed to Drilled and Cased
1996-08-22 Well Began Production
1996-08-22 Well Fluid changed to Gas
1996-08-22 Well Mode changed to Flowing
1999-02-01 Well Structure changed to Commingled
1999-02-02 Well Fluid changed to Gas
1999-02-02 Well Mode changed to Flowing
1999-10-21 Well Log Performed
2003-02-10 Well Fluid changed to Gas
2003-02-10 Well Mode changed to Suspended
2004-12-12 Well Log Performed
2008-03-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-23 Plug Back Performed
2008-03-23 Well Fluid changed to Gas
2008-03-23 Well Log Performed
2008-03-23 Well Mode changed to Abandoned Zone
2008-03-24 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-06-23 Perforation 1179.00 1180.50 14
1990-06-24 Acid Treatment 1179.00 1180.50 0
1990-06-25 Packing Device Capped w/Cement 1176.80 1177.80 0
1990-06-26 Perforation 1172.00 1174.50 14
1990-09-19 Perforation 1158.00 1161.00 14
2008-03-23 Packing Device Capped w/Cement 1147.00 1155.00 0
2008-03-24 Perforation 1051.00 1054.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 2722 0.0 0.0 0.0
1997 7979 0.0 0.0 0.0
1998 8560 0.0 0.0 0.0
1999 6179 0.0 0.0 0.0

For data sources see[5]

References