X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0604211102000

Well Details

Well ID: 0604211102000
Loading map...
Location: 00/02-11-060-21W4/0
Location Alias: 00/02-11-60-21 W4M
Location Alias 2: 00/02-11-060-21 W4/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 4
Range: 21
Section: 11
County/Municipality: Thorhild County
Well Name: ANR THORHILD 2-11-60-21
Operator Name: ANR Production Company
License Number: 0092652
License Date: 1981-10-08
License Status: RecCertified
Spud Date: 1981-10-16
Final Drill Date: 1981-10-19
Well Total Depth: 867.00 m
Surface Hole Latitude: 54.166697
Surface Hole Longitude: -113.034175

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-10-08 Obtained License
1981-10-19 Finished Drilling
1981-10-20 Drill Stem Test Performed
1981-10-21 Drill Stem Test Performed
1981-10-22 Production Casing Operation Performed
1981-11-04 Perforation Treatment Performed - Jet Perforation
1981-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-11-07 Perforation Treatment Performed - Jet Perforation
1981-11-08 Perforation Treatment Performed - Fractured
1982-04-24 Well Mode changed to Drilled and Cased
1985-03-04 Well Fluid changed to Gas
1985-03-04 Well Mode changed to Testing
1985-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-03-05 Plug Back Performed
1985-03-05 Well Abandoned
1985-03-05 Well Fluid changed to Gas
1985-03-05 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-11-04 Perforation 575.50 576.50 13
1981-11-05 Acid Treatment 575.50 576.50 0
1981-11-06 Packing Device Capped w/Cement 573.00 573.00 0
1981-11-07 Perforation 460.50 463.40 7
1981-11-08 Fracture 460.50 463.40 0
1985-03-05 Packing Device Capped w/Cement 455.00 455.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 35 0.0 0.0 0.0

For data sources see[5]

References