If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0604162914000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.222984,"lon":-112.364183,"icon":""}]} |
Location: 00/14-29-060-16W4/0 | |
Location Alias: 00/14-29-60-16 W4M | |
Location Alias 2: 00/14-29-060-16 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 4 | |
Range: 16 | |
Section: 29 | |
County/Municipality: Smoky Lake County | |
Well Name: CELTIC EDWAND 14-29-60-16 | |
Operator Name: XTO Energy Canada ULC | |
License Number: 0352434 | |
License Date: 2006-02-21 | |
License Status: Abandoned | |
Spud Date: 2006-06-04 | |
Final Drill Date: 2006-06-06 | |
Well Total Depth: 693.00 m | |
Surface Hole Latitude: 54.222984 | |
Surface Hole Longitude: -112.364183 |
Date | Event |
---|---|
2006-02-21 | Obtained License |
2006-06-05 | Surface Casing Operation Performed |
2006-06-06 | Finished Drilling |
2006-06-06 | Production Casing Operation Performed |
2006-06-06 | Rig Released |
2006-06-06 | Well Log Performed |
2006-06-06 | Well Mode changed to Drilled and Cased |
2006-07-22 | Perforation Treatment Performed - Jet Perforation |
2006-08-02 | Perforation Treatment Performed - Fractured |
2016-06-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2016-06-21 | Perforation Treatment Performed - Cement Plug |
2016-06-21 | Perforation Treatment Performed - Cement Squeeze |
2016-06-21 | Perforation Treatment Performed - Jet Perforation |
2016-06-22 | Perforation Treatment Performed - Cement Plug |
2016-06-22 | Perforation Treatment Performed - Cement Squeeze |
2016-06-22 | Perforation Treatment Performed - Jet Perforation |
2016-06-22 | Plug Back Performed |
2016-06-22 | Well Mode changed to Abandoned Zone |
2016-06-23 | Perforation Treatment Performed - Cement Plug |
2016-06-23 | Perforation Treatment Performed - Cement Squeeze |
2016-06-23 | Perforation Treatment Performed - Jet Perforation |
2016-06-24 | Perforation Treatment Performed - Cement Plug |
2016-06-24 | Perforation Treatment Performed - Cement Squeeze |
2016-06-24 | Perforation Treatment Performed - Jet Perforation |
2016-06-25 | Perforation Treatment Performed - Cement Plug |
2016-06-25 | Perforation Treatment Performed - Cement Squeeze |
2016-06-25 | Perforation Treatment Performed - Jet Perforation |
2016-06-25 | Plug Back Performed |
2016-07-21 | Well Abandoned |
2016-07-21 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-07-22 | Perforation | 599.50 | 601.00 | 17 |
2016-06-22 | Cement Squeeze | 299.00 | 301.00 | 0 |
2016-06-22 | Cement Plug | 222.00 | 327.00 | 0 |
2016-06-23 | Perforation | 208.30 | 209.30 | 20 |
2016-06-23 | Cement Squeeze | 208.30 | 209.30 | 0 |
2016-06-23 | Cement Plug | 182.00 | 222.00 | 0 |
2016-06-24 | Perforation | 175.00 | 176.00 | 20 |
2016-06-24 | Perforation | 154.00 | 155.00 | 20 |
2016-06-24 | Cement Squeeze | 154.00 | 176.00 | 0 |
2016-06-24 | Cement Plug | 142.00 | 182.00 | 0 |
2016-06-25 | Perforation | 136.00 | 137.00 | 20 |
2006-07-22 | Perforation | 593.00 | 595.00 | 17 |
2016-06-25 | Cement Squeeze | 136.00 | 137.00 | 0 |
2016-06-25 | Cement Plug | 109.70 | 142.00 | 0 |
2006-08-02 | Fracture | 593.00 | 601.00 | 0 |
2016-06-19 | Packing Device Capped w/Cement | 580.00 | 588.00 | 0 |
2016-06-21 | Perforation | 542.00 | 543.00 | 20 |
2016-06-21 | Perforation | 493.00 | 494.00 | 20 |
2016-06-21 | Cement Squeeze | 493.00 | 543.00 | 0 |
2016-06-21 | Cement Plug | 425.00 | 577.00 | 0 |
2016-06-22 | Perforation | 299.00 | 301.00 | 20 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-06-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]