If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0604162206000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.200738,"lon":-112.316042,"icon":""}]} |
Location: 00/06-22-060-16W4/0 | |
Location Alias: 00/06-22-60-16 W4M | |
Location Alias 2: 00/06-22-060-16 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 4 | |
Range: 16 | |
Section: 22 | |
County/Municipality: Smoky Lake County | |
Well Name: CNRL EDWAND 6-22-60-16 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0038263 | |
License Date: 1970-06-11 | |
License Status: Issued | |
Spud Date: 1970-06-19 | |
Final Drill Date: 1970-06-21 | |
Well Total Depth: 678.20 m | |
Surface Hole Latitude: 54.200738 | |
Surface Hole Longitude: -112.316042 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1970-06-11 | Obtained License |
1970-06-21 | Finished Drilling |
1970-06-22 | Production Casing Operation Performed |
1970-06-26 | Perforation Treatment Performed - Jet Perforation |
1970-06-27 | Perforation Treatment Performed - Acid Wash - No Pressure |
1970-06-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1970-06-27 | Perforation Treatment Performed - Jet Perforation |
1970-06-28 | Perforation Treatment Performed - Acid Wash - No Pressure |
1970-06-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1970-06-29 | Perforation Treatment Performed - Jet Perforation |
1971-07-17 | Well Mode changed to Drilled and Cased |
1979-10-04 | Well Began Production |
1979-10-04 | Well Fluid changed to Gas |
1979-10-04 | Well Mode changed to Flowing |
1982-04-15 | Well Fluid changed to Gas |
1982-04-15 | Well Mode changed to Suspended |
1987-02-01 | Well Fluid changed to Gas |
1987-02-01 | Well Mode changed to Flowing |
1994-03-01 | Well Fluid changed to Gas |
1994-03-01 | Well Mode changed to Suspended |
1999-03-12 | Well Fluid changed to Gas |
1999-03-12 | Well Mode changed to Flowing |
2004-05-01 | Well Fluid changed to Gas |
2004-05-01 | Well Mode changed to Suspended |
2008-06-01 | Well Fluid changed to Gas |
2008-06-01 | Well Mode changed to Flowing |
2008-07-01 | Well Fluid changed to Gas |
2008-07-01 | Well Mode changed to Suspended |
2012-07-01 | Well Fluid changed to Gas |
2012-07-01 | Well Mode changed to Flowing |
2014-03-31 | Well Fluid changed to Gas |
2014-03-31 | Well Mode changed to Suspended |
2014-05-01 | Well Fluid changed to Gas |
2014-05-01 | Well Mode changed to Flowing |
2015-12-31 | Well Fluid changed to Gas |
2015-12-31 | Well Mode changed to Suspended |
2016-10-01 | Well Fluid changed to Gas |
2016-10-01 | Well Mode changed to Flowing |
2019-01-31 | Well Fluid changed to Gas |
2019-01-31 | Well Mode changed to Suspended |
2019-03-01 | Well Fluid changed to Gas |
2019-03-01 | Well Mode changed to Flowing |
2020-01-31 | Well Fluid changed to Gas |
2020-01-31 | Well Mode changed to Suspended |
2020-02-01 | Well Fluid changed to Gas |
2020-02-01 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1970-06-26 | Perforation | 637.00 | 638.90 | 7 |
1970-06-27 | Acid Wash | 637.00 | 638.90 | 0 |
1970-06-27 | Packing Device Capped w/Cement | 627.90 | 627.90 | 0 |
1970-06-27 | Perforation | 586.40 | 588.30 | 7 |
1970-06-28 | Acid Wash | 586.40 | 588.30 | 0 |
1970-06-29 | Packing Device Capped w/Cement | 577.60 | 577.60 | 7 |
1970-06-29 | Perforation | 523.00 | 524.90 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 2136 | 0.0 | 0.0 | 0.0 |
1980 | 6262 | 0.0 | 0.0 | 0.0 |
1981 | 1455 | 0.0 | 0.0 | 0.0 |
1982 | 168 | 0.0 | 0.0 | 0.0 |
1987 | 1525 | 0.0 | 0.0 | 0.0 |
1988 | 4234 | 0.0 | 0.0 | 0.0 |
1990 | 615 | 0.0 | 0.0 | 0.0 |
1991 | 2563 | 0.0 | 0.0 | 0.0 |
1992 | 279 | 0.0 | 0.0 | 0.0 |
1999 | 6243 | 0.0 | 0.0 | 0.0 |
2000 | 4662 | 0.0 | 0.0 | 0.0 |
2001 | 192 | 0.0 | 0.0 | 0.0 |
2002 | 101 | 0.0 | 0.0 | 0.0 |
2012 | 3210 | 0.0 | 0.0 | 0.0 |
2013 | 4345 | 0.0 | 0.0 | 0.0 |
2014 | 5377 | 0.0 | 0.0 | 0.0 |
2016 | 113 | 0.0 | 0.0 | 0.0 |
2017 | 3851 | 0.0 | 0.0 | 0.0 |
2018 | 1578 | 0.0 | 0.0 | 0.0 |
2019 | 2850 | 0.0 | 0.0 | 0.0 |
2020 | 1217 | 0.0 | 0.0 | 0.0 |
For data sources see[5]