If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0604012602002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.210978,"lon":-110.041745,"icon":""}]} |
Location: 00/02-26-060-01W4/2 | |
Location Alias: 00/02-26-60-01 W4M | |
Location Alias 2: 00/02-26-060-01 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 4 | |
Range: 01 | |
Section: 26 | |
County/Municipality: Elizabeth Metis Settlement | |
Well Name: CNRL 2A MSHINE 2-26-60-1 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0429462 | |
License Date: 2011-01-06 | |
License Status: Issued | |
Spud Date: 2011-02-10 | |
Final Drill Date: 2011-02-12 | |
Well Total Depth: 521.00 m | |
Surface Hole Latitude: 54.210978 | |
Surface Hole Longitude: -110.041745 |
Date | Event |
---|---|
2011-01-06 | Obtained License |
2011-02-10 | Direction Drilling Operation Performed - Deviate |
2011-02-11 | Surface Casing Operation Performed |
2011-02-12 | Finished Drilling |
2011-02-12 | Well Log Performed |
2011-02-12 | Well Mode changed to Drilled and Cased |
2011-02-13 | Production Casing Operation Performed |
2011-02-13 | Rig Released |
2011-04-27 | Perforation Treatment Performed - Jet Perforation |
2011-04-27 | Well Log Performed |
2011-04-28 | Well Log Performed |
2014-02-26 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
2014-02-26 | Well Log Performed |
2014-02-27 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
2014-02-27 | Well Log Performed |
2014-02-28 | Well Began Production |
2014-02-28 | Well Fluid changed to Crude Bitumen |
2014-02-28 | Well Mode changed to Pumping |
2014-03-03 | Perforation Treatment Performed - Jet Perforation |
2014-08-13 | Perforation Treatment Performed - Cement Plug |
2014-08-14 | Perforation Treatment Performed - Jet Perforation |
2014-08-14 | Well Log Performed |
2015-12-31 | Well Fluid changed to Crude Bitumen |
2015-12-31 | Well Mode changed to Suspended |
2016-07-01 | Well Fluid changed to Crude Bitumen |
2016-07-01 | Well Mode changed to Pumping |
2016-07-20 | Well Log Performed |
2017-05-30 | Well Fluid changed to Crude Bitumen |
2017-05-30 | Well Mode changed to Suspended |
2017-07-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-07-17 | Perforation Treatment Performed - Jet Perforation |
2017-07-17 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-02-10 | 4.20 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-04-27 | Perforation | 418.20 | 419.20 | 17 |
2014-08-13 | Cement Plug | 497.70 | 509.20 | 0 |
2014-08-14 | Perforation | 480.50 | 486.50 | 26 |
2017-07-16 | Packing Device Capped w/Cement | 487.00 | 492.00 | 0 |
2017-07-17 | Perforation | 444.30 | 450.20 | 26 |
2011-04-27 | Perforation | 420.70 | 421.70 | 17 |
2011-04-27 | Perforation | 423.00 | 424.00 | 17 |
2011-04-27 | Perforation | 407.70 | 410.00 | 17 |
2011-04-27 | Perforation | 412.00 | 414.00 | 17 |
2014-02-26 | Casing Patch | 418.20 | 424.00 | 0 |
2014-02-27 | Casing Patch | 407.70 | 414.00 | 0 |
2014-03-03 | Perforation | 493.00 | 495.00 | 26 |
2014-03-03 | Perforation | 497.00 | 501.00 | 26 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 3415 | 0.0 | 0.0 | 0.0 |
2015 | 1895 | 0.0 | 0.0 | 0.0 |
2016 | 931 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-03-15 | No Incident Encountered | 0.00 | 0.00 |
2014-03-04 | No Incident Encountered | 0.00 | 0.00 |
2014-08-15 | No Incident Encountered | 0.00 | 0.00 |
2017-07-17 | No Incident Encountered | 0.00 | 0.00 |
2017-07-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]