If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0596032505000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.123586,"lon":-118.327153,"icon":""}]} |
| Location: 00/05-25-059-03W6/0 | |
| Location Alias: 00/05-25-59-03 W6M | |
| Location Alias 2: 00/05-25-059-03 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 059 | |
| Meridian: 6 | |
| Range: 03 | |
| Section: 25 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: ECA ECOG RESTHA 5-25-59-3 | |
| Operator Name: Jupiter Resources Inc. | |
| License Number: 0413137 | |
| License Date: 2009-10-15 | |
| License Status: Amended | |
| Spud Date: 2009-12-06 | |
| Final Drill Date: 2009-12-28 | |
| Well Total Depth: 3734.80 m | |
| Surface Hole Latitude: 54.123586 | |
| Surface Hole Longitude: -118.327153 |
| Date | Event |
|---|---|
| 2009-10-15 | Obtained License |
| 2009-12-07 | Direction Drilling Operation Performed - Deviate |
| 2009-12-09 | Surface Casing Operation Performed |
| 2009-12-18 | Intermediate Casing Operation Performed |
| 2009-12-28 | Finished Drilling |
| 2009-12-28 | Well Log Performed |
| 2009-12-28 | Well Mode changed to Drilled and Cased |
| 2009-12-29 | Production Casing Operation Performed |
| 2009-12-31 | Rig Released |
| 2010-02-22 | Well Log Performed |
| 2010-02-23 | Well Log Performed |
| 2010-02-24 | Perforation Treatment Performed - Fractured |
| 2010-02-24 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-24 | Well Log Performed |
| 2010-02-25 | Perforation Treatment Performed - Fractured |
| 2010-02-25 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-25 | Well Log Performed |
| 2010-02-26 | Perforation Treatment Performed - Fractured |
| 2010-02-26 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-26 | Well Log Performed |
| 2010-02-27 | Perforation Treatment Performed - Fractured |
| 2010-02-28 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-28 | Well Fluid changed to Gas |
| 2010-02-28 | Well Log Performed |
| 2010-02-28 | Well Mode changed to Testing |
| 2010-03-01 | Perforation Treatment Performed - Fractured |
| 2010-03-21 | Well Began Production |
| 2010-03-21 | Well Fluid changed to Gas |
| 2010-03-21 | Well Mode changed to Flowing |
| 2014-10-01 | Well Fluid changed to Gas |
| 2014-10-01 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2009-12-07 | 141.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-02-24 | Perforation | 3667.00 | 3667.50 | 7 |
| 2010-02-26 | Perforation | 3285.50 | 3287.50 | 7 |
| 2010-02-26 | Fracture | 3481.50 | 3498.50 | 0 |
| 2010-02-26 | Fracture | 3520.00 | 3521.50 | 0 |
| 2010-02-26 | Perforation | 3481.50 | 3483.00 | 7 |
| 2010-02-27 | Fracture | 3285.50 | 3293.00 | 0 |
| 2010-02-28 | Perforation | 3092.00 | 3094.00 | 14 |
| 2010-02-28 | Perforation | 3112.00 | 3114.00 | 14 |
| 2010-03-01 | Fracture | 3092.00 | 3114.00 | 0 |
| 2010-02-24 | Fracture | 3667.00 | 3704.00 | 0 |
| 2010-02-24 | Perforation | 3702.00 | 3704.00 | 14 |
| 2010-02-24 | Perforation | 3684.00 | 3686.00 | 14 |
| 2010-02-25 | Perforation | 3520.00 | 3521.50 | 7 |
| 2010-02-25 | Perforation | 3497.00 | 3498.50 | 7 |
| 2010-02-25 | Perforation | 3588.50 | 3589.50 | 20 |
| 2010-02-25 | Fracture | 3588.50 | 3589.50 | 0 |
| 2010-02-26 | Perforation | 3291.00 | 3293.00 | 7 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 6568 | 0.0 | 0.0 | 0.0 |
| 2011 | 8248 | 0.0 | 0.0 | 0.0 |
| 2012 | 8172 | 0.0 | 0.0 | 0.0 |
| 2013 | 8735 | 0.0 | 0.0 | 0.0 |
| 2014 | 8039 | 0.0 | 0.0 | 0.0 |
| 2015 | 7535 | 0.0 | 0.0 | 0.0 |
| 2016 | 3959 | 0.0 | 0.0 | 0.0 |
| 2017 | 5488 | 0.0 | 0.0 | 0.0 |
| 2018 | 6960 | 0.0 | 0.0 | 0.0 |
| 2019 | 6534 | 0.0 | 0.0 | 0.0 |
| 2020 | 2086 | 0.0 | 0.0 | 0.0 |
For data sources see[6]