X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0596023608002

Well Details

Well ID: 0596023608002
Loading map...
Location: 00/08-36-059-02W6/2
Location Alias: 00/08-36-59-02 W6M
Location Alias 2: 00/08-36-059-02 W6/02
Country: Canada
Province: Alberta
Township: 059
Meridian: 6
Range: 02
Section: 36
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC HZ RESTHA 8-36-59-2
Operator Name: XTO Energy Canada ULC
License Number: 0423285
License Date: 2010-09-08
License Status: Amended
Spud Date: 2010-09-25
Final Drill Date: 2010-12-12
Well Total Depth: 4965.00 m
Surface Hole Latitude: 54.153084
Surface Hole Longitude: -118.166687

For data sources see[1][2]

Well History

Date Event
2010-09-08 Obtained License
2010-09-28 Surface Casing Operation Performed
2010-10-10 Production Casing Operation Performed
2010-10-31 Direction Drilling Operation Performed - Horizontal
2010-12-12 Finished Drilling
2010-12-12 Well Log Performed
2010-12-12 Well Mode changed to Drilled and Cased
2010-12-17 Well Log Performed
2010-12-20 Liner Casing Operation Performed
2010-12-22 Rig Released
2011-01-12 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-12 Perforation Treatment Performed - Open-Hole Completion
2011-01-20 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-21 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-26 Perforation Treatment Performed - Jet Perforation
2011-01-26 Well Log Performed
2011-01-31 Perforation Treatment Performed - Fractured
2011-01-31 Perforation Treatment Performed - Jet Perforation
2011-01-31 Well Log Performed
2011-02-01 Perforation Treatment Performed - Fractured
2011-02-03 Well Fluid changed to Gas
2011-02-03 Well Mode changed to Testing
2011-02-18 Perforation Treatment Performed - Jet Perforation
2011-02-22 Perforation Treatment Performed - Fractured
2011-11-09 Well Began Production
2011-11-09 Well Fluid changed to Gas
2011-11-09 Well Mode changed to Flowing
2014-04-09 Well Fluid changed to Gas
2014-04-09 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-10-31 3418.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-12 Open Hole/Barefoot Completion 4953.00 4965.00 0
2011-01-21 Multi-Stage Fracture 4029.50 4030.20 0
2011-01-26 Perforation 3943.00 3944.00 10
2011-01-26 Perforation 3912.00 3913.00 9
2011-01-26 Perforation 3857.00 3858.00 8
2011-01-31 Fracture 3857.00 3944.00 0
2011-01-31 Perforation 3803.00 3804.00 10
2011-01-31 Perforation 3748.00 3749.00 9
2011-01-31 Perforation 3698.00 3699.00 8
2011-02-01 Fracture 3698.00 3804.00 0
2011-02-18 Perforation 3486.00 3487.00 20
2011-01-12 Multi-Stage Fracture 4937.70 4938.40 0
2011-02-22 Fracture 3486.00 3487.00 0
2011-01-12 Multi-Stage Fracture 4873.90 4874.60 0
2011-01-12 Multi-Stage Fracture 4758.20 4758.90 0
2011-01-12 Multi-Stage Fracture 4632.30 4633.00 0
2011-01-12 Multi-Stage Fracture 4484.80 4485.50 0
2011-01-20 Multi-Stage Fracture 4388.90 4389.60 0
2011-01-20 Multi-Stage Fracture 4251.40 4252.10 0
2011-01-21 Multi-Stage Fracture 4135.10 4135.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1410 0.0 0.0 0.0
2012 7456 0.0 0.0 0.0
2013 5795 0.0 0.0 0.0
2014 6601 0.0 0.0 0.0
2015 6592 0.0 0.0 0.0
2016 8221 0.0 0.0 0.0
2017 6917 0.0 0.0 0.0
2018 7350 0.0 0.0 0.0
2019 2757 0.0 0.0 0.0
2020 1445 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-03-12 No Incident Encountered 0.00 0.00

For data sources see[7]

References