X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0596023412000

Well Details

Well ID: 0596023412000
Loading map...
Location: 00/12-34-059-02W6/0
Location Alias: 00/12-34-59-02 W6M
Location Alias 2: 00/12-34-059-02 W6/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 6
Range: 02
Section: 34
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA RESTHA 12-34-59-2
Operator Name: Jupiter Resources Inc.
License Number: 0425811
License Date: 2010-11-15
License Status: Amended
Spud Date: 2011-06-08
Final Drill Date: 2011-08-01
Well Total Depth: 5169.00 m
Surface Hole Latitude: 54.138466
Surface Hole Longitude: -118.194146

For data sources see[1][2]

Well History

Date Event
2010-11-15 Obtained License
2011-06-19 Surface Casing Operation Performed
2011-06-24 Well Log Performed
2011-07-09 Direction Drilling Operation Performed - Horizontal
2011-07-16 Intermediate Casing Operation Performed
2011-08-01 Finished Drilling
2011-08-01 Well Log Performed
2011-08-01 Well Mode changed to Drilled and Cased
2011-08-06 Production Casing Operation Performed
2011-08-08 Rig Released
2011-08-20 Well Log Performed
2011-08-27 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-08-27 Perforation Treatment Performed - Fractured
2011-08-28 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-08-28 Perforation Treatment Performed - Fractured
2011-08-29 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-08-29 Perforation Treatment Performed - Fractured
2011-08-30 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-08-30 Perforation Treatment Performed - Fractured
2011-08-31 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-08-31 Perforation Treatment Performed - Fractured
2011-09-01 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-09-01 Perforation Treatment Performed - Fractured
2011-09-02 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-09-02 Perforation Treatment Performed - Fractured
2011-09-03 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-09-03 Perforation Treatment Performed - Fractured
2011-09-04 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-09-04 Perforation Treatment Performed - Fractured
2011-09-10 Well Fluid changed to Gas
2011-09-10 Well Mode changed to Testing
2011-09-16 Well Began Production
2011-09-16 Well Fluid changed to Gas
2011-09-16 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-07-09 2983.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-27 Hydra Jet Perforation 5146.00 5146.10 0
2011-08-28 Fracture 4890.00 4890.10 0
2011-08-29 Hydra Jet Perforation 4800.00 4800.10 0
2011-08-29 Hydra Jet Perforation 4710.00 4710.10 0
2011-08-29 Fracture 4800.00 4800.10 0
2011-08-29 Fracture 4710.00 4710.10 0
2011-08-30 Hydra Jet Perforation 4620.00 4620.10 0
2011-08-30 Hydra Jet Perforation 4530.00 4530.10 0
2011-08-30 Hydra Jet Perforation 4440.00 4440.10 0
2011-08-30 Fracture 4620.00 4620.10 0
2011-08-30 Fracture 4530.00 4530.10 0
2011-08-27 Hydra Jet Perforation 5070.00 5070.10 0
2011-08-30 Fracture 4440.00 4440.10 0
2011-08-31 Hydra Jet Perforation 4350.00 4350.10 0
2011-08-31 Hydra Jet Perforation 4260.00 4260.10 0
2011-08-31 Hydra Jet Perforation 4170.00 4170.10 0
2011-08-31 Fracture 4350.00 4350.10 0
2011-08-31 Fracture 4260.00 4260.10 0
2011-09-01 Hydra Jet Perforation 4080.00 4080.10 0
2011-09-01 Fracture 4170.00 4170.10 0
2011-09-01 Fracture 4080.00 4080.10 0
2011-09-02 Hydra Jet Perforation 3990.00 3990.10 0
2011-08-27 Hydra Jet Perforation 5060.00 5060.10 0
2011-09-02 Hydra Jet Perforation 3900.00 3900.10 0
2011-09-02 Hydra Jet Perforation 3810.00 3810.10 0
2011-09-02 Hydra Jet Perforation 3720.00 3720.10 0
2011-09-02 Fracture 3990.00 3990.10 0
2011-09-02 Fracture 3900.00 3900.10 0
2011-09-02 Fracture 3810.00 3810.10 0
2011-09-03 Hydra Jet Perforation 3630.00 3630.10 0
2011-09-03 Hydra Jet Perforation 3540.00 3540.10 0
2011-09-03 Hydra Jet Perforation 3450.00 3450.10 0
2011-09-03 Fracture 3720.00 3720.10 0
2011-08-27 Hydra Jet Perforation 5030.00 5030.10 0
2011-09-03 Fracture 3630.00 3630.10 0
2011-09-03 Fracture 3450.00 3450.10 0
2011-09-04 Hydra Jet Perforation 3360.00 3360.10 0
2011-09-04 Fracture 3540.00 3540.10 0
2011-09-04 Fracture 3360.00 3360.10 0
2011-08-27 Fracture 5146.00 5146.10 0
2011-08-27 Fracture 5030.00 5030.10 0
2011-08-28 Hydra Jet Perforation 4975.00 4975.10 0
2011-08-28 Hydra Jet Perforation 4890.00 4890.10 0
2011-08-28 Fracture 4975.00 4975.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 2163 0.0 0.0 0.0
2012 8185 0.0 0.0 0.0
2013 8205 0.0 0.0 0.0
2014 6892 0.0 0.0 0.0
2015 6587 0.0 0.0 0.0
2016 539 0.0 0.0 0.0
2017 5203 0.0 0.0 0.0
2018 6521 0.0 0.0 0.0
2019 7653 0.0 0.0 0.0
2020 2102 0.0 0.0 0.0

For data sources see[6]

References