X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0596022613020

Well Details

Well ID: 0596022613020
Loading map...
Location: 02/13-26-059-02W6/0
Location Alias: 02/13-26-59-02 W6M
Location Alias 2: 02/13-26-059-02 W6/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 6
Range: 02
Section: 26
County/Municipality: Municipal District of Greenview No. 16
Well Name: JUPITER 102 HZ RESTHA 13-26-59-2
Operator Name: Jupiter Resources Inc.
License Number: 0413543
License Date: 2009-10-29
License Status: Issued
Spud Date: 2010-01-13
Final Drill Date: 2010-02-08
Well Total Depth: 4400.00 m
Surface Hole Latitude: 54.132418
Surface Hole Longitude: -118.180574

For data sources see[1][2]

Well History

Date Event
2009-10-29 Obtained License
2010-01-15 Surface Casing Operation Performed
2010-01-22 Intermediate Casing Operation Performed
2010-01-24 Direction Drilling Operation Performed - Horizontal
2010-01-30 Well Log Performed
2010-02-08 Finished Drilling
2010-02-08 Well Mode changed to Drilled and Cased
2010-02-09 Well Log Performed
2010-02-11 Production Casing Operation Performed
2010-02-13 Rig Released
2010-02-24 Well Log Performed
2010-02-25 Well Log Performed
2010-03-07 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-03-07 Perforation Treatment Performed - Fractured
2010-03-08 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-03-08 Perforation Treatment Performed - Fractured
2010-03-09 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-03-09 Perforation Treatment Performed - Fractured
2010-03-10 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-03-10 Perforation Treatment Performed - Fractured
2010-03-14 Well Fluid changed to Gas
2010-03-14 Well Mode changed to Testing
2010-03-22 Well Began Production
2010-03-22 Well Fluid changed to Gas
2010-03-22 Well Mode changed to Flowing
2014-10-01 Well Fluid changed to Gas
2014-10-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-01-24 2927.70 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-03-07 Hydra Jet Perforation 4387.00 4387.10 0
2010-03-08 Fracture 4015.00 4015.10 0
2010-03-08 Hydra Jet Perforation 3912.00 3912.10 0
2010-03-08 Fracture 3912.00 3912.10 0
2010-03-09 Hydra Jet Perforation 3735.00 3735.10 0
2010-03-09 Hydra Jet Perforation 3725.00 3725.10 0
2010-03-09 Hydra Jet Perforation 3650.00 3650.10 0
2010-03-09 Fracture 3650.00 3650.10 0
2010-03-10 Hydra Jet Perforation 3515.00 3515.10 0
2010-03-10 Fracture 3515.00 3515.10 0
2010-03-10 Hydra Jet Perforation 3415.00 3415.10 0
2010-03-07 Fracture 4387.00 4387.10 0
2010-03-10 Fracture 3415.00 3415.10 0
2010-03-10 Hydra Jet Perforation 3310.00 3310.10 0
2010-03-10 Fracture 3310.00 3310.10 0
2010-03-08 Hydra Jet Perforation 4315.00 4315.10 0
2010-03-08 Fracture 4315.00 4315.10 0
2010-03-08 Hydra Jet Perforation 4220.00 4220.10 0
2010-03-08 Fracture 4220.00 4220.10 0
2010-03-08 Hydra Jet Perforation 4115.00 4115.10 0
2010-03-08 Fracture 4115.00 4115.10 0
2010-03-08 Hydra Jet Perforation 4015.00 4015.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 6150 0.0 0.0 0.0
2011 7296 0.0 0.0 0.0
2012 7888 0.0 0.0 0.0
2013 8476 0.0 0.0 0.0
2014 6569 0.0 0.0 0.0
2015 6237 0.0 0.0 0.0
2016 2522 0.0 0.0 0.0
2017 6010 0.0 0.0 0.0
2018 6178 0.0 0.0 0.0
2019 6980 0.0 0.0 0.0
2020 1968 0.0 0.0 0.0

For data sources see[6]

References