X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0596022503020

Well Details

Well ID: 0596022503020
Loading map...
Location: 02/03-25-059-02W6/0
Location Alias: 02/03-25-59-02 W6M
Location Alias 2: 02/03-25-059-02 W6/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 6
Range: 02
Section: 25
County/Municipality: Municipal District of Greenview No. 16
Well Name: JUPITER HZ RESTHA 3-25-59-2
Operator Name: Jupiter Resources Inc.
License Number: 0474206
License Date: 2015-01-09
License Status: Amended
Spud Date: 2015-02-14
Final Drill Date: 2015-03-26
Well Total Depth: 5018.00 m
Surface Hole Latitude: 54.127485
Surface Hole Longitude: -118.195796

For data sources see[1][2]

Well History

Date Event
2015-01-09 Obtained License
2015-02-17 Surface Casing Operation Performed
2015-02-25 Intermediate Casing Operation Performed
2015-03-06 Direction Drilling Operation Performed - Deviate
2015-03-13 Direction Drilling Operation Performed - Horizontal
2015-03-26 Finished Drilling
2015-03-26 Well Log Performed
2015-03-26 Well Mode changed to Drilled and Cased
2015-03-31 Production Casing Operation Performed
2015-04-03 Rig Released
2015-08-19 Well Log Performed
2015-09-20 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-21 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-22 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-23 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-05 Well Fluid changed to Gas
2015-10-05 Well Mode changed to Testing
2016-02-01 Well Began Production
2016-02-01 Well Fluid changed to Gas
2016-02-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-02-14 Akita Drilling Ltd. 22 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-03-06 2902.10 Deviate (5 - 79 degrees)
2015-03-13 3320.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-09-20 Multi-Stage Fracture 4986.30 4986.40 0
2015-09-21 Multi-Stage Fracture 4222.30 4222.40 0
2015-09-22 Multi-Stage Fracture 4134.80 4134.90 0
2015-09-22 Multi-Stage Fracture 4045.20 4045.30 0
2015-09-22 Multi-Stage Fracture 3953.40 3953.50 0
2015-09-22 Multi-Stage Fracture 3863.60 3863.70 0
2015-09-23 Multi-Stage Fracture 3769.60 3769.70 0
2015-09-23 Multi-Stage Fracture 3677.70 3677.80 0
2015-09-23 Multi-Stage Fracture 3588.60 3588.70 0
2015-09-23 Multi-Stage Fracture 3493.00 3493.10 0
2015-09-23 Multi-Stage Fracture 3411.60 3411.70 0
2015-09-20 Multi-Stage Fracture 4931.60 4931.70 0
2015-09-20 Multi-Stage Fracture 4851.30 4851.40 0
2015-09-21 Multi-Stage Fracture 4756.20 4756.30 0
2015-09-21 Multi-Stage Fracture 4665.30 4665.40 0
2015-09-21 Multi-Stage Fracture 4585.20 4585.30 0
2015-09-21 Multi-Stage Fracture 4495.10 4495.20 0
2015-09-21 Multi-Stage Fracture 4406.50 4406.60 0
2015-09-21 Multi-Stage Fracture 4311.60 4311.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-09-20 2015-09-23 3,193 10,058 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 86.0824 N/A
Prime Plus 30/50 Trican hexamethylenetetramine 100-97-0 100 2.7002 N/A
silica crystalline 14808-60-7 100 2.7002 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 10.285 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.9679 N/A
Myacide GA-50 Trican Bactericide/Biocide glutaraldehyde 111-30-8 100 0.0098 N/A
non-hazardous ingredients Not Available 100 0.0098 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1858 N/A
water Not Available 100 0.1858 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0441 N/A
propylene glycol 57-55-6 100 0.0441 N/A
FR-12 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0912 N/A
anionic polyacrylamide copolymer 25987-30-8 100 0.0912 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0912 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-09-20 2015-09-23 Surface Water - Runoff 6306
2015-09-20 2015-09-22 Municipal Water 1885
2015-09-20 2015-09-23 Municipal Water 748
2015-09-20 2015-09-20 Recycled Fracturing Water (treated at well site) 210
2015-09-20 2015-09-23 Recycled Fracturing Water (treated at well site) 432
2015-09-20 2015-09-20 Recycled Fracturing Water (treated at well site) 160
2015-09-23 2015-09-23 Recycled Fracturing Water (treated at well site) 304
2015-09-20 2015-09-20 Recycled Fracturing Water (treated at well site) 74
2015-09-20 2015-09-23 Recycled Fracturing Water (treated at well site) 210

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 44 0.0 0.0 0.0
2016 4250 0.0 0.0 0.0
2017 5576 0.0 0.0 0.0
2018 5149 0.0 0.0 0.0
2019 8253 0.0 0.0 0.0
2020 1957 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-03-13 No Incident Encountered 0.00 0.00
2015-10-11 No Incident Encountered 0.00 0.00

For data sources see[10]

References