If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0596022503020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.127485,"lon":-118.195796,"icon":""}]} |
Location: 02/03-25-059-02W6/0 | |
Location Alias: 02/03-25-59-02 W6M | |
Location Alias 2: 02/03-25-059-02 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 6 | |
Range: 02 | |
Section: 25 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: JUPITER HZ RESTHA 3-25-59-2 | |
Operator Name: Jupiter Resources Inc. | |
License Number: 0474206 | |
License Date: 2015-01-09 | |
License Status: Amended | |
Spud Date: 2015-02-14 | |
Final Drill Date: 2015-03-26 | |
Well Total Depth: 5018.00 m | |
Surface Hole Latitude: 54.127485 | |
Surface Hole Longitude: -118.195796 |
Date | Event |
---|---|
2015-01-09 | Obtained License |
2015-02-17 | Surface Casing Operation Performed |
2015-02-25 | Intermediate Casing Operation Performed |
2015-03-06 | Direction Drilling Operation Performed - Deviate |
2015-03-13 | Direction Drilling Operation Performed - Horizontal |
2015-03-26 | Finished Drilling |
2015-03-26 | Well Log Performed |
2015-03-26 | Well Mode changed to Drilled and Cased |
2015-03-31 | Production Casing Operation Performed |
2015-04-03 | Rig Released |
2015-08-19 | Well Log Performed |
2015-09-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-09-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-09-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-09-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-10-05 | Well Fluid changed to Gas |
2015-10-05 | Well Mode changed to Testing |
2016-02-01 | Well Began Production |
2016-02-01 | Well Fluid changed to Gas |
2016-02-01 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-02-14 | Akita Drilling Ltd. | 22 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-03-06 | 2902.10 | Deviate (5 - 79 degrees) |
2015-03-13 | 3320.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-09-20 | Multi-Stage Fracture | 4986.30 | 4986.40 | 0 |
2015-09-21 | Multi-Stage Fracture | 4222.30 | 4222.40 | 0 |
2015-09-22 | Multi-Stage Fracture | 4134.80 | 4134.90 | 0 |
2015-09-22 | Multi-Stage Fracture | 4045.20 | 4045.30 | 0 |
2015-09-22 | Multi-Stage Fracture | 3953.40 | 3953.50 | 0 |
2015-09-22 | Multi-Stage Fracture | 3863.60 | 3863.70 | 0 |
2015-09-23 | Multi-Stage Fracture | 3769.60 | 3769.70 | 0 |
2015-09-23 | Multi-Stage Fracture | 3677.70 | 3677.80 | 0 |
2015-09-23 | Multi-Stage Fracture | 3588.60 | 3588.70 | 0 |
2015-09-23 | Multi-Stage Fracture | 3493.00 | 3493.10 | 0 |
2015-09-23 | Multi-Stage Fracture | 3411.60 | 3411.70 | 0 |
2015-09-20 | Multi-Stage Fracture | 4931.60 | 4931.70 | 0 |
2015-09-20 | Multi-Stage Fracture | 4851.30 | 4851.40 | 0 |
2015-09-21 | Multi-Stage Fracture | 4756.20 | 4756.30 | 0 |
2015-09-21 | Multi-Stage Fracture | 4665.30 | 4665.40 | 0 |
2015-09-21 | Multi-Stage Fracture | 4585.20 | 4585.30 | 0 |
2015-09-21 | Multi-Stage Fracture | 4495.10 | 4495.20 | 0 |
2015-09-21 | Multi-Stage Fracture | 4406.50 | 4406.60 | 0 |
2015-09-21 | Multi-Stage Fracture | 4311.60 | 4311.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-09-20 | 2015-09-23 | 3,193 | 10,058 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 86.0824 | N/A | |||
Prime Plus 30/50 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 2.7002 | N/A | ||
silica crystalline | 14808-60-7 | 100 | 2.7002 | N/A | ||||
Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 10.285 | N/A | ||
Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 1.9679 | N/A | ||
Myacide GA-50 | Trican | Bactericide/Biocide | glutaraldehyde | 111-30-8 | 100 | 0.0098 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.0098 | N/A | ||||
CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.1858 | N/A | |
water | Not Available | 100 | 0.1858 | N/A | ||||
GNE-2 | Trican | Demulsifier | non-hazardous ingredients | Not Available | 100 | 0.0441 | N/A | |
propylene glycol | 57-55-6 | 100 | 0.0441 | N/A | ||||
FR-12 | Trican | Friction Reducer | ammonium chloride | 12125-02-9 | 100 | 0.0912 | N/A | |
anionic polyacrylamide copolymer | 25987-30-8 | 100 | 0.0912 | N/A | ||||
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0912 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-09-20 | 2015-09-23 | Surface Water - Runoff | 6306 |
2015-09-20 | 2015-09-22 | Municipal Water | 1885 |
2015-09-20 | 2015-09-23 | Municipal Water | 748 |
2015-09-20 | 2015-09-20 | Recycled Fracturing Water (treated at well site) | 210 |
2015-09-20 | 2015-09-23 | Recycled Fracturing Water (treated at well site) | 432 |
2015-09-20 | 2015-09-20 | Recycled Fracturing Water (treated at well site) | 160 |
2015-09-23 | 2015-09-23 | Recycled Fracturing Water (treated at well site) | 304 |
2015-09-20 | 2015-09-20 | Recycled Fracturing Water (treated at well site) | 74 |
2015-09-20 | 2015-09-23 | Recycled Fracturing Water (treated at well site) | 210 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 44 | 0.0 | 0.0 | 0.0 |
2016 | 4250 | 0.0 | 0.0 | 0.0 |
2017 | 5576 | 0.0 | 0.0 | 0.0 |
2018 | 5149 | 0.0 | 0.0 | 0.0 |
2019 | 8253 | 0.0 | 0.0 | 0.0 |
2020 | 1957 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-03-13 | No Incident Encountered | 0.00 | 0.00 |
2015-10-11 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]