X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0596021116000

Well Details

Well ID: 0596021116000
Loading map...
Location: 00/16-11-059-02W6/0
Location Alias: 00/16-11-59-02 W6M
Location Alias 2: 00/16-11-059-02 W6/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 6
Range: 02
Section: 11
County/Municipality: Municipal District of Greenview No. 16
Well Name: JUPITER HZ SMOKY 16-11-59-2
Operator Name: Jupiter Resources Inc.
License Number: 0479219
License Date: 2016-04-04
License Status: Amended
Spud Date: 2016-10-13
Final Drill Date: 2016-11-16
Well Total Depth: 6218.00 m
Surface Hole Latitude: 54.093748
Surface Hole Longitude: -118.224400

For data sources see[1][2]

Well History

Date Event
2016-04-04 Obtained License
2016-10-15 Surface Casing Operation Performed
2016-10-20 Intermediate Casing Operation Performed
2016-10-25 Direction Drilling Operation Performed - Deviate
2016-10-28 Direction Drilling Operation Performed - Horizontal
2016-11-01 Well Log Performed
2016-11-16 Finished Drilling
2016-11-16 Well Log Performed
2016-11-16 Well Mode changed to Drilled and Cased
2016-11-19 Liner Casing Operation Performed
2016-11-24 Rig Released
2016-12-09 Well Log Performed
2016-12-17 Well Log Performed
2017-01-26 Perforation Treatment Performed - Multi-Stage Fracture
2017-01-27 Perforation Treatment Performed - Multi-Stage Fracture
2017-01-28 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-16 Well Fluid changed to Gas
2017-06-16 Well Mode changed to Testing
2017-06-26 Well Began Production
2017-06-26 Well Fluid changed to Gas
2017-06-26 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-10-13 Horizon Drilling Inc. 38 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-10-25 2983.70 Deviate (5 - 79 degrees)
2016-10-28 3411.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-01-26 Multi-Stage Fracture 6188.70 6188.80 0
2017-01-27 Multi-Stage Fracture 5413.30 5413.40 0
2017-01-27 Multi-Stage Fracture 5325.60 5325.70 0
2017-01-27 Multi-Stage Fracture 5238.10 5238.20 0
2017-01-27 Multi-Stage Fracture 5150.80 5150.90 0
2017-01-27 Multi-Stage Fracture 5062.50 5062.60 0
2017-01-27 Multi-Stage Fracture 4975.00 4975.10 0
2017-01-28 Multi-Stage Fracture 4887.00 4887.10 0
2017-01-28 Multi-Stage Fracture 4798.60 4798.70 0
2017-01-28 Multi-Stage Fracture 4711.00 4711.10 0
2017-01-28 Multi-Stage Fracture 4623.20 4623.30 0
2017-01-26 Multi-Stage Fracture 6114.50 6114.60 0
2017-01-28 Multi-Stage Fracture 4535.20 4535.30 0
2017-01-28 Multi-Stage Fracture 4446.80 4446.90 0
2017-01-28 Multi-Stage Fracture 4358.50 4358.60 0
2017-01-28 Multi-Stage Fracture 4257.90 4258.00 0
2017-01-28 Multi-Stage Fracture 4155.90 4156.00 0
2017-01-28 Multi-Stage Fracture 4052.90 4053.00 0
2017-01-28 Multi-Stage Fracture 3949.90 3950.00 0
2017-01-28 Multi-Stage Fracture 3847.30 3847.40 0
2017-01-28 Multi-Stage Fracture 3747.30 3747.40 0
2017-01-28 Multi-Stage Fracture 3645.40 3645.50 0
2017-01-26 Multi-Stage Fracture 6027.00 6027.10 0
2017-01-28 Multi-Stage Fracture 3544.90 3545.00 0
2017-01-28 Multi-Stage Fracture 3441.90 3442.00 0
2017-01-26 Multi-Stage Fracture 5940.90 5941.00 0
2017-01-26 Multi-Stage Fracture 5852.90 5853.00 0
2017-01-27 Multi-Stage Fracture 5764.70 5764.80 0
2017-01-27 Multi-Stage Fracture 5676.50 5676.60 0
2017-01-27 Multi-Stage Fracture 5588.50 5588.60 0
2017-01-27 Multi-Stage Fracture 5501.70 5501.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-01-26 2017-01-28 3,298 23,016 N/A
2 2017-01-27 2017-01-28 3,298 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 84.1491 N/A
Prime Plus 30/50 Trican hexamethylenetetramine 100-97-0 100 2.0908 N/A
silica crystalline 14808-60-7 100 2.0908 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 12.8999 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 0.7727 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0103 N/A
2-mercaptoethanol 60-24-2 100 0.0103 N/A
dibromoacetonitrile 3252-43-5 100 0.0103 N/A
non-hazardous ingredients Not Available 100 0.0103 N/A
sodium bromide 7647-15-6 100 0.0103 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1349 N/A
water Not Available 100 0.1349 N/A
GFR-5D Trican Friction Reducer anionic polyacrylamide Not Available 100 0.0315 N/A
SI-14 Trican Scale Inhibitor methanol 67-56-1 100 0.0418 N/A
non-hazardous ingredients Not Available 100 0.0418 N/A
2 DF-2W Trican Defoamer non-hazardous ingredients Not Available 100 0.0042 N/A
propylene glycol 57-55-6 100 0.0042 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-01-26 2017-01-28 Central Water Distribution Facility 13240
2017-01-26 2017-01-28 Central Water Distribution Facility 8905
2017-01-05 2017-01-25 Recycled Fracturing Water (treated at well site) 1670
2017-01-05 2017-01-25 Recycled Fracturing Water (treated at well site) 1670

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 4356 0.0 0.0 0.0
2018 7891 0.0 0.0 0.0
2019 7970 0.0 0.0 0.0
2020 2157 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-10-28 No Incident Encountered 0.00 0.00
2017-02-28 No Incident Encountered 0.00 0.00

For data sources see[10]

References