If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0596020909003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.087619,"lon":-118.230764,"icon":""}]} |
Location: 00/09-09-059-02W6/3 | |
Location Alias: 00/09-09-59-02 W6M | |
Location Alias 2: 00/09-09-059-02 W6/03 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 6 | |
Range: 02 | |
Section: 09 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: JUPITER AT AL SMOKY 9-9-59-2 | |
Operator Name: Jupiter Resources Inc. | |
License Number: 0261360 | |
License Date: 2001-11-05 | |
License Status: Issued | |
Spud Date: 2001-11-17 | |
Final Drill Date: 2002-03-22 | |
Well Total Depth: 4830.00 m | |
Surface Hole Latitude: 54.087619 | |
Surface Hole Longitude: -118.230764 |
Date | Event |
---|---|
2001-11-05 | Obtained License |
2001-11-26 | Lost Circulation Occurred |
2001-12-05 | Well Log Performed |
2001-12-07 | Surface Casing Operation Performed |
2001-12-09 | Well Log Performed |
2001-12-10 | Well Log Performed |
2001-12-17 | Well Log Performed |
2002-02-22 | Well Log Performed |
2002-02-24 | Intermediate Casing Operation Performed |
2002-03-10 | Well Log Performed |
2002-03-12 | Well Log Performed |
2002-03-13 | Liner Casing Operation Performed |
2002-03-22 | Finished Drilling |
2002-03-22 | Well Log Performed |
2002-03-22 | Well Mode changed to Drilled and Cased |
2002-03-23 | Well Log Performed |
2002-03-27 | Liner Casing Operation Performed |
2002-04-02 | Rig Released |
2002-04-14 | Well Log Performed |
2002-04-15 | Well Log Performed |
2002-04-16 | Perforation Treatment Performed - Jet Perforation |
2002-04-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-04-26 | Perforation Treatment Performed - Fractured |
2002-05-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-05-06 | Plug Back Performed |
2003-03-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-03-16 | Plug Back Performed |
2003-03-21 | Well Log Performed |
2003-03-22 | Well Log Performed |
2003-03-24 | Perforation Treatment Performed - Jet Perforation |
2003-03-26 | Well Log Performed |
2003-03-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-03-27 | Perforation Treatment Performed - Jet Perforation |
2003-03-27 | Plug Back Performed |
2003-03-27 | Well Log Performed |
2003-04-01 | Perforation Treatment Performed - Fractured |
2003-07-28 | Perforation Treatment Performed - Jet Perforation |
2003-07-28 | Well Log Performed |
2003-07-30 | Perforation Treatment Performed - Fractured |
2004-06-01 | Well Began Production |
2004-06-01 | Well Fluid changed to Gas |
2004-06-01 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-04-16 | Perforation | 4602.00 | 4730.00 | 7 |
2003-03-27 | Perforation | 3450.00 | 3454.00 | 17 |
2003-04-01 | Fracture | 3450.00 | 3454.00 | 0 |
2003-07-28 | Perforation | 2920.00 | 2923.00 | 17 |
2003-07-28 | Perforation | 2909.00 | 2912.00 | 17 |
2003-07-28 | Perforation | 2900.00 | 2903.00 | 17 |
2003-07-30 | Fracture | 2920.00 | 2923.00 | 0 |
2003-07-30 | Fracture | 2909.00 | 2912.00 | 0 |
2003-07-30 | Fracture | 2900.00 | 2903.00 | 0 |
2002-04-23 | Acid Treatment | 4602.00 | 4730.00 | 0 |
2002-04-26 | Fracture | 4602.00 | 4730.00 | 0 |
2002-05-06 | Packing Device Capped w/Cement | 4693.50 | 4701.50 | 0 |
2003-03-16 | Packing Device Capped w/Cement | 4449.00 | 4646.00 | 0 |
2003-03-24 | Perforation | 3502.00 | 3507.00 | 17 |
2003-03-24 | Perforation | 3518.00 | 3523.00 | 17 |
2003-03-24 | Perforation | 3537.00 | 3543.00 | 17 |
2003-03-27 | Packing Device Capped w/Cement | 3484.50 | 3495.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 4374 | 0.0 | 0.0 | 0.0 |
2005 | 8577 | 0.0 | 0.0 | 0.0 |
2006 | 8310 | 0.0 | 0.0 | 0.0 |
2007 | 8233 | 0.0 | 0.0 | 0.0 |
2008 | 8026 | 0.0 | 0.0 | 0.0 |
2009 | 8404 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8759 | 0.0 | 0.0 | 0.0 |
2012 | 8783 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8735 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 7344 | 0.0 | 0.0 | 0.0 |
2018 | 8711 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2001-11-26 | Lost Circulation | 1068.00 | 1131.00 |
For data sources see[6]