If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0596010513000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.077958,"lon":-118.119027,"icon":""}]} |
Location: 00/13-05-059-01W6/0 | |
Location Alias: 00/13-05-59-01 W6M | |
Location Alias 2: 00/13-05-059-01 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 6 | |
Range: 01 | |
Section: 05 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TOURMALINE WANYAN 13-5-59-1 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0438888 | |
License Date: 2011-11-15 | |
License Status: Issued | |
Spud Date: 2012-01-05 | |
Final Drill Date: 2012-01-22 | |
Well Total Depth: 3433.00 m | |
Surface Hole Latitude: 54.077958 | |
Surface Hole Longitude: -118.119027 |
Date | Event |
---|---|
2011-11-15 | Obtained License |
2012-01-07 | Surface Casing Operation Performed |
2012-01-12 | Well Log Performed |
2012-01-13 | Intermediate Casing Operation Performed |
2012-01-22 | Finished Drilling |
2012-01-22 | Well Log Performed |
2012-01-22 | Well Mode changed to Drilled and Cased |
2012-01-24 | Production Casing Operation Performed |
2012-01-25 | Rig Released |
2012-02-22 | Perforation Treatment Performed - Jet Perforation |
2012-02-24 | Perforation Treatment Performed - Fractured |
2012-02-24 | Perforation Treatment Performed - Jet Perforation |
2012-02-25 | Perforation Treatment Performed - Fractured |
2012-02-26 | Perforation Treatment Performed - Fractured |
2012-02-26 | Perforation Treatment Performed - Jet Perforation |
2012-02-27 | Perforation Treatment Performed - Fractured |
2012-02-27 | Perforation Treatment Performed - Jet Perforation |
2012-03-21 | Well Began Production |
2012-03-21 | Well Fluid changed to Gas |
2012-03-21 | Well Mode changed to Flowing |
2012-10-16 | Well Fluid changed to Gas |
2012-10-16 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-05 | Patterson-UTI Drilling Co. Canada | 17E | N/A | Drill To LD |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-22 | Perforation | 3358.00 | 3359.00 | 12 |
2012-02-26 | Perforation | 2949.00 | 2950.00 | 9 |
2012-02-26 | Fracture | 2949.00 | 3074.50 | 0 |
2012-02-27 | Perforation | 2795.00 | 2796.00 | 3 |
2012-02-27 | Perforation | 2781.50 | 2782.50 | 3 |
2012-02-27 | Perforation | 2731.00 | 2732.00 | 3 |
2012-02-27 | Perforation | 2359.00 | 2360.00 | 6 |
2012-02-27 | Perforation | 2320.00 | 2321.00 | 3 |
2012-02-27 | Fracture | 2320.00 | 2796.00 | 0 |
2012-02-22 | Perforation | 3344.50 | 3345.50 | 6 |
2012-02-24 | Fracture | 3344.50 | 3359.00 | 0 |
2012-02-24 | Perforation | 3298.00 | 3299.00 | 6 |
2012-02-24 | Perforation | 3194.50 | 3195.50 | 6 |
2012-02-24 | Perforation | 3164.50 | 3165.50 | 9 |
2012-02-25 | Fracture | 3164.50 | 3299.00 | 0 |
2012-02-26 | Perforation | 3073.50 | 3074.50 | 6 |
2012-02-26 | Perforation | 2957.00 | 2958.00 | 6 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6901 | 0.0 | 0.0 | 0.0 |
2013 | 7556 | 0.0 | 0.0 | 0.0 |
2014 | 5639 | 0.0 | 0.0 | 0.0 |
2015 | 7325 | 0.0 | 0.0 | 0.0 |
2016 | 7726 | 0.0 | 0.0 | 0.0 |
2017 | 7954 | 0.0 | 0.0 | 0.0 |
2018 | 7776 | 0.0 | 0.0 | 0.0 |
2019 | 8376 | 0.0 | 0.0 | 0.0 |
2020 | 1968 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-03-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]