X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595261213000

Well Details

Well ID: 0595261213000
Loading map...
Location: 00/13-12-059-26W5/0
Location Alias: 00/13-12-59-26 W5M
Location Alias 2: 00/13-12-059-26 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 26
Section: 12
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE LELAND 13-12-59-26
Operator Name: Tourmaline Oil Corp.
License Number: 0365973
License Date: 2006-11-14
License Status: Suspension
Spud Date: 2006-12-04
Final Drill Date: 2007-01-06
Well Total Depth: 3785.00 m
Surface Hole Latitude: 54.089717
Surface Hole Longitude: -117.761963

For data sources see[1][2]

Well History

Date Event
2006-11-14 Obtained License
2006-12-07 Surface Casing Operation Performed
2006-12-20 Direction Drilling Operation Performed - Horizontal
2006-12-25 Well Log Performed
2006-12-26 Well Log Performed
2006-12-28 Intermediate Casing Operation Performed
2007-01-06 Finished Drilling
2007-01-06 Perforation Treatment Performed - Open-Hole Completion
2007-01-06 Well Log Performed
2007-01-06 Well Mode changed to Drilled and Cased
2007-01-07 Well Log Performed
2007-01-12 Rig Released
2007-01-12 Well Log Performed
2007-01-29 Well Fluid changed to Gas
2007-01-29 Well Mode changed to Testing
2007-03-22 Well Began Production
2007-03-22 Well Fluid changed to Gas
2007-03-22 Well Mode changed to Flowing
2008-01-13 Liner Casing Operation Performed
2008-01-13 Well Log Performed
2008-01-25 Perforation Treatment Performed - Multi-Stage Fracture
2008-01-31 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-30 Well Fluid changed to Gas
2015-06-30 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2006-12-20 2684.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-01-06 Open Hole/Barefoot Completion 3626.90 3785.00 0
2008-01-25 Multi-Stage Fracture 3623.50 3626.60 0
2008-01-25 Multi-Stage Fracture 3536.10 3536.80 0
2008-01-25 Multi-Stage Fracture 3370.50 3371.20 0
2008-01-31 Multi-Stage Fracture 3053.00 3053.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 4955 0.0 0.0 0.0
2008 7719 0.0 0.0 0.0
2009 8448 0.0 0.0 0.0
2010 8365 0.0 0.0 0.0
2011 3479 0.0 0.0 0.0
2012 8688 0.0 0.0 0.0
2013 7800 0.0 0.0 0.0
2014 2621 0.0 0.0 0.0

For data sources see[6]

References