X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595241614000

Well Details

Well ID: 0595241614000
Loading map...
Location: 00/14-16-059-24W5/0
Location Alias: 00/14-16-59-24 W5M
Location Alias 2: 00/14-16-059-24 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 24
Section: 16
County/Municipality: Municipal District of Greenview No. 16
Well Name: CVE PLACID 14-16-59-24
Operator Name: Cenovus Energy Inc.
License Number: 0459611
License Date: 2013-09-25
License Status: Issued
Spud Date: 2013-11-12
Final Drill Date: 2013-12-19
Well Total Depth: 4798.00 m
Surface Hole Latitude: 54.093705
Surface Hole Longitude: -117.519685

For data sources see[1][2]

Well History

Date Event
2013-09-25 Obtained License
2013-11-14 Surface Casing Operation Performed
2013-11-25 Direction Drilling Operation Performed - Deviate
2013-12-01 Direction Drilling Operation Performed - Horizontal
2013-12-03 Well Log Performed
2013-12-04 Intermediate Casing Operation Performed
2013-12-19 Finished Drilling
2013-12-19 Well Log Performed
2013-12-19 Well Mode changed to Drilled and Cased
2013-12-21 Liner Casing Operation Performed
2013-12-21 Perforation Treatment Performed - Open-Hole Completion
2013-12-23 Well Log Performed
2013-12-24 Rig Released
2014-01-06 Well Log Performed
2014-02-07 Perforation Treatment Performed - Multi-Stage Fracture
2014-02-08 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-02 Well Began Production
2014-10-02 Well Fluid changed to Gas
2014-10-02 Well Mode changed to Flowing
2015-05-14 Well Fluid changed to Gas
2015-05-14 Well Mode changed to Pumping
2018-02-15 Well Log Performed
2018-02-19 Well Log Performed
2018-02-22 Well Log Performed

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-11-13 Jomax Drilling (1988) Limited 2 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-11-25 2524.50 Deviate (5 - 79 degrees)
2013-12-01 3116.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-12-21 Open Hole/Barefoot Completion 4789.80 4798.00 0
2014-02-08 Multi-Stage Fracture 3269.60 3270.10 0
2014-02-08 Multi-Stage Fracture 3210.70 3211.20 0
2014-02-07 Multi-Stage Fracture 3668.20 3668.70 0
2014-02-07 Multi-Stage Fracture 3623.00 3623.50 0
2014-02-07 Multi-Stage Fracture 3564.10 3564.60 0
2014-02-07 Multi-Stage Fracture 3521.50 3522.00 0
2014-02-08 Multi-Stage Fracture 3462.00 3462.50 0
2014-02-08 Multi-Stage Fracture 3417.90 3418.40 0
2014-02-08 Multi-Stage Fracture 3373.40 3373.90 0
2014-02-08 Multi-Stage Fracture 3314.30 3314.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-02-07 2014-02-08 2,987 4,517 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 1.8111 N/A
water Not Available 100 84.8327 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 6.4877 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 6.8105 N/A
SBPrime 20/40 Trican hexamethylenetetramine 100-97-0 100 1.9071 N/A
silica crystalline 14808-60-7 100 1.9071 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0142 N/A
dibromoacetonitrile 3252-43-5 100 0.0142 N/A
non-hazardous ingredients Not Available 100 0.0142 N/A
polyethylene glycol 25322-68-3 100 0.0142 N/A
sodium bromide 7647-15-6 100 0.0142 N/A
Breaker SR Trican Breaker potassium persulfate 7727-21-1 100 0.0071 N/A
silica crystalline 14808-60-7 100 0.0071 N/A
DRA-90 Trican Buffer non-hazardous ingredients Not Available 100 0.0369 N/A
pH-6 Trican Buffer formic acid 64-18-6 100 0.0502 N/A
water Not Available 100 0.0502 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1013 N/A
water Not Available 100 0.1013 N/A
WXB-77 Trican Crosslinker borate salts 1319-33-1 100 0.1137 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.1137 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0302 N/A
propylene glycol 57-55-6 100 0.0302 N/A
FR-8 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0738 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0738 N/A
non-hazardous ingredients Not Available 100 0.0738 N/A
WG-111d Trican Gelling Agent guar gum 9000-30-0 100 0.0561 N/A
SS-5 Trican Surfactant aliphatic alcohol 8985 100 0.0882 N/A
aminofunctional polymer 8985 100 0.0882 N/A
distillates (petroleum). sweet medium 64741-86-2 100 0.0882 N/A
isopropanol 67-63-0 100 0.0882 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-01-06 2014-01-23 Surface Water - River 5773
2014-01-07 2014-01-23 Surface Water - Runoff 10540

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 1043 0.0 0.0 0.0
2015 1250 0.0 0.0 0.0
2016 1393 0.0 0.0 0.0
2017 43 0.0 0.0 0.0
2018 4709 0.0 0.0 0.0
2019 6564 0.0 0.0 0.0
2020 1963 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-12-24 No Incident Encountered 0.00 0.00
2014-02-19 No Incident Encountered 0.00 0.00

For data sources see[10]

References