X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595233216000

Well Details

Well ID: 0595233216000
Loading map...
Location: 00/16-32-059-23W5/0
Location Alias: 00/16-32-59-23 W5M
Location Alias 2: 00/16-32-059-23 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 23
Section: 32
County/Municipality: Municipal District of Greenview No. 16
Well Name: CVE PLACID 16-32-59-23
Operator Name: Cenovus Energy Inc.
License Number: 0423011
License Date: 2010-08-27
License Status: Issued
Spud Date: 2010-10-23
Final Drill Date: 2010-11-17
Well Total Depth: 3712.00 m
Surface Hole Latitude: 54.139026
Surface Hole Longitude: -117.413301

For data sources see[1][2]

Well History

Date Event
2010-08-27 Obtained License
2010-10-26 Surface Casing Operation Performed
2010-10-29 Direction Drilling Operation Performed - Horizontal
2010-11-05 Intermediate Casing Operation Performed
2010-11-05 Well Log Performed
2010-11-17 Finished Drilling
2010-11-17 Well Log Performed
2010-11-17 Well Mode changed to Drilled and Cased
2010-11-21 Liner Casing Operation Performed
2010-11-21 Perforation Treatment Performed - Open-Hole Completion
2010-11-21 Well Log Performed
2010-11-22 Rig Released
2011-01-28 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-29 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-30 Perforation Treatment Performed - Multi-Stage Fracture
2011-04-09 Well Began Production
2011-04-09 Well Fluid changed to Crude Oil
2011-04-09 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-10-29 1611.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-11-21 Open Hole/Barefoot Completion 3710.00 3712.00 0
2011-01-29 Multi-Stage Fracture 2938.90 2939.40 0
2011-01-29 Multi-Stage Fracture 2835.30 2835.80 0
2011-01-29 Multi-Stage Fracture 2731.90 2732.40 0
2011-01-29 Multi-Stage Fracture 2640.80 2641.30 0
2011-01-29 Multi-Stage Fracture 2412.90 2413.40 0
2011-01-30 Multi-Stage Fracture 2252.70 2253.20 0
2011-01-28 Multi-Stage Fracture 3659.90 3660.40 0
2011-01-28 Multi-Stage Fracture 3658.90 3659.40 0
2011-01-28 Multi-Stage Fracture 3553.70 3554.20 0
2011-01-28 Multi-Stage Fracture 3449.00 3449.50 0
2011-01-28 Multi-Stage Fracture 3343.80 3344.30 0
2011-01-28 Multi-Stage Fracture 3252.00 3252.50 0
2011-01-29 Multi-Stage Fracture 3147.30 3147.80 0
2011-01-29 Multi-Stage Fracture 3043.20 3043.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 2425 0.0 0.0 0.0
2012 8667 0.0 0.0 0.0
2013 8285 0.0 0.0 0.0
2014 8543 0.0 0.0 0.0
2015 8180 0.0 0.0 0.0
2016 8143 0.0 0.0 0.0
2017 6218 0.0 0.0 0.0
2018 8412 0.0 0.0 0.0
2019 7511 0.0 0.0 0.0
2020 1523 0.0 0.0 0.0

For data sources see[6]

References