If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0595232003000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.120748,"lon":-117.424639,"icon":""}]} |
Location: 00/03-20-059-23W5/0 | |
Location Alias: 00/03-20-59-23 W5M | |
Location Alias 2: 00/03-20-059-23 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 5 | |
Range: 23 | |
Section: 20 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: MAPAN ENERGY BERLR 3-20-59-23 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0440023 | |
License Date: 2011-12-01 | |
License Status: Issued | |
Spud Date: 2012-02-15 | |
Final Drill Date: 2012-02-27 | |
Well Total Depth: 3524.00 m | |
Surface Hole Latitude: 54.120748 | |
Surface Hole Longitude: -117.424639 |
Date | Event |
---|---|
2011-02-28 | Well Log Performed |
2011-12-01 | Obtained License |
2012-02-15 | Direction Drilling Operation Performed - Deviate |
2012-02-16 | Surface Casing Operation Performed |
2012-02-20 | Direction Drilling Operation Performed - Horizontal |
2012-02-27 | Finished Drilling |
2012-02-27 | Well Mode changed to Drilled and Cased |
2012-02-28 | Well Log Performed |
2012-03-01 | Production Casing Operation Performed |
2012-03-01 | Well Log Performed |
2012-03-03 | Rig Released |
2012-08-31 | Perforation Treatment Performed - Open-Hole Completion |
2012-09-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-11-01 | Well Began Production |
2015-11-01 | Well Fluid changed to Gas |
2015-11-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-02-15 | Nabors Drilling Limited | 78 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-15 | 240.00 | Deviate (5 - 79 degrees) |
2012-02-20 | 2029.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-08-31 | Open Hole/Barefoot Completion | 3520.00 | 3524.00 | 0 |
2012-09-09 | Multi-Stage Fracture | 2907.60 | 2908.90 | 0 |
2012-09-09 | Multi-Stage Fracture | 2830.00 | 2831.20 | 0 |
2012-09-09 | Multi-Stage Fracture | 2751.60 | 2752.90 | 0 |
2012-09-09 | Multi-Stage Fracture | 2681.60 | 2682.80 | 0 |
2012-09-09 | Multi-Stage Fracture | 2611.80 | 2613.00 | 0 |
2012-09-09 | Multi-Stage Fracture | 2542.00 | 2543.20 | 0 |
2012-09-09 | Multi-Stage Fracture | 2423.20 | 2424.40 | 0 |
2012-09-08 | Multi-Stage Fracture | 3473.60 | 3474.60 | 0 |
2012-09-08 | Multi-Stage Fracture | 3403.20 | 3404.50 | 0 |
2012-09-08 | Multi-Stage Fracture | 3333.90 | 3335.10 | 0 |
2012-09-08 | Multi-Stage Fracture | 3264.30 | 3265.50 | 0 |
2012-09-08 | Multi-Stage Fracture | 3183.40 | 3184.60 | 0 |
2012-09-08 | Multi-Stage Fracture | 3124.80 | 3126.00 | 0 |
2012-09-09 | Multi-Stage Fracture | 3049.50 | 3050.80 | 0 |
2012-09-09 | Multi-Stage Fracture | 2971.70 | 2972.90 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 735 | 0.0 | 0.0 | 0.0 |
2016 | 215 | 0.0 | 0.0 | 0.0 |
2017 | 6104 | 0.0 | 0.0 | 0.0 |
2018 | 8587 | 0.0 | 0.0 | 0.0 |
2019 | 8702 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-10-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]