X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595231013000

Well Details

Well ID: 0595231013000
Loading map...
Location: 00/13-10-059-23W5/0
Location Alias: 00/13-10-59-23 W5M
Location Alias 2: 00/13-10-059-23 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 23
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: MAPAN ENERGY BERLR 13-10-59-23
Operator Name: Tourmaline Oil Corp.
License Number: 0439932
License Date: 2011-11-30
License Status: Issued
Spud Date: 2012-03-08
Final Drill Date: 2012-03-24
Well Total Depth: 3841.00 m
Surface Hole Latitude: 54.087346
Surface Hole Longitude: -117.357237

For data sources see[1][2]

Well History

Date Event
2011-11-30 Obtained License
2012-03-09 Direction Drilling Operation Performed - Deviate
2012-03-09 Surface Casing Operation Performed
2012-03-10 Well Log Performed
2012-03-14 Direction Drilling Operation Performed - Horizontal
2012-03-24 Finished Drilling
2012-03-24 Well Mode changed to Drilled and Cased
2012-03-25 Well Log Performed
2012-03-26 Production Casing Operation Performed
2012-03-28 Rig Released
2012-08-05 Perforation Treatment Performed - Open-Hole Completion
2012-08-18 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-19 Perforation Treatment Performed - Multi-Stage Fracture
2014-01-08 Well Began Production
2014-01-08 Well Fluid changed to Crude Oil
2014-01-08 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-03-08 Nabors Drilling Limited 78 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-03-09 150.00 Deviate (5 - 79 degrees)
2012-03-14 1810.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-05 Open Hole/Barefoot Completion 3836.00 3841.00 0
2012-08-19 Multi-Stage Fracture 3146.60 3147.90 0
2012-08-19 Multi-Stage Fracture 3064.30 3065.60 0
2012-08-19 Multi-Stage Fracture 2982.10 2983.30 0
2012-08-19 Multi-Stage Fracture 2900.50 2901.70 0
2012-08-19 Multi-Stage Fracture 2818.10 2819.30 0
2012-08-19 Multi-Stage Fracture 2736.50 2737.80 0
2012-08-18 Multi-Stage Fracture 3801.80 3802.80 0
2012-08-18 Multi-Stage Fracture 3718.10 3719.40 0
2012-08-18 Multi-Stage Fracture 3636.90 3638.10 0
2012-08-18 Multi-Stage Fracture 3554.20 3555.50 0
2012-08-18 Multi-Stage Fracture 3472.90 3474.10 0
2012-08-18 Multi-Stage Fracture 3391.10 3392.30 0
2012-08-19 Multi-Stage Fracture 3309.50 3310.80 0
2012-08-19 Multi-Stage Fracture 3228.00 3229.20 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 471 0.0 0.0 0.0
2015 338 0.0 0.0 0.0
2016 2224 0.0 0.0 0.0
2017 7899 0.0 0.0 0.0
2018 8656 0.0 0.0 0.0
2019 8707 0.0 0.0 0.0
2020 2143 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-20 No Incident Encountered 0.00 0.00

For data sources see[8]

References